sap-pp【开发与工程】This skill handles SAP PP (Production Planning) including MRP, production orders, process orders, shop floor control, capacity planning, BOM management, routing, and PP-PI for process industries. Use when user mentions PP, MRP, MD01, MD04, production order, CO01, CO11N, MFBF, BOM, routing, work center, capacity, planned order, operation, confirmation…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
| Type | Description |
|---|---|
| PD | MRP — demand-driven (standard) |
| VB | Manual reorder point |
| VM | Automatic reorder point |
| ND | No MRP |
| MF | Make-to-order (individual requirements) |
| Key | Description |
|---|---|
| EX | Lot-for-lot (exact demand quantity) |
| FX | Fixed lot size |
| WB | Weekly lot size |
| MB | Monthly lot size |
| HB | Replenishment up to maximum stock level |
| Exception | Meaning | Action |
|---|---|---|
| 10 | Reschedule in | Move order earlier |
| 15 | Reschedule out | Push order later |
| 20 | Firm planned order — reschedule | Evaluate manually |
| 25 | Surplus | Cancel or reduce |
| 30 | New order required | Convert planned order |
CO01 (Create) → Release (CO02 / KOAB batch) → Goods Issue (MIGO 261)
→ Confirmation (CO11N) → Final Confirmation → TECO (technically complete)
→ Settlement (KO88) → CLSD (closed)
| T-code | Description |
|---|---|
| CO01 | Create production order |
| CO02 | Change production order |
| CO03 | Display production order |
| CO11N | Production order confirmation |
| CO13 | Cancel confirmation |
| CO24 | Missing parts list (component shortage) |
| COOIS | Production order information system |
| MIGO | Goods issue (261) / GR (101) for order |
Used in: chemical, pharmaceutical, food & beverage industries
| T-code | Description |
|---|---|
| COR1 | Create process order |
| COR2 | Change process order |
| COR6N | Process order confirmation |
| CORK | PI sheet (process instruction) execution |
| CORZ | Process order scheduling |
Process instructions (PI sheets): define what operators enter during production Master recipe (C201): replaces routing for process industries
| T-code | Description |
|---|---|
| CS01 | Create BOM |
| CS02 | Change BOM |
| CS03 | Display BOM |
| CS11 | BOM explosion (multi-level) |
| CS14 | BOM comparison |
| CS15 | Where-used list |
| Usage | Description |
|---|---|
| 1 | Production |
| 2 | Engineering / design |
| 3 | Universal |
| 5 | Sales |
| 6 | Costing |
Work Center (CR01 / CR02)
Routing (CA01 / CA03)
Reference Operation Sets (CA11)
| T-code | Description |
|---|---|
| CM01 | Capacity load overview (work center) |
| CM21 | Capacity leveling (interactive) |
| CM50 | Variable capacity planning |
| CM99 | Scheduling overview |
| Feature | ECC | S/4HANA |
|---|---|---|
| MRP run | MD01 | MD01N (MRP Live) recommended |
| MRP performance | Slower (sequential) | Parallel HANA-based |
| Exception handling | MD04 list | Enhanced exception management |
| Scheduling board | CM21 | Production Scheduling Board (Fiori) |
| Shop floor | COOIS | Manufacturing Execution Fiori apps |
| eWM integration | External WM | Embedded eWM (same system) |
| pMRP | Not available | Predictive MRP (AI-based exception detection) |