算法艺术创作
algorithmic-art
通过代码和可调参数创作生成艺术与交互式视觉效果。
strength-training-plan【设计与创意】Use when someone starts lifting, hits a strength or hypertrophy plateau, restructures a lifting program, or wants to build strength or muscle - designing a progressive resistance program with splits, compound movement patterns, sets/reps, progressive overload, and deloads from barbells and dumbbells. General fitness guidance, not medical advice. Owns…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Design a structured, progressive strength program based on training age, available days, and equipment. Default to a barbell-and-dumbbells gym environment; note escapes for home and minimal equipment. This is general fitness guidance, not medical advice - consult a qualified coach or sports medicine professional for injuries or complex needs.
Beginners (under 12 months consistent training) respond best to full-body sessions 3 days per week. Intermediates (1-3 years) benefit from 3-4 days using an upper/lower or push/pull/legs split. Advanced trainees (3+ years) typically need 4-5 days to drive progress. Match frequency to recovery capacity - more is not always better.
Every program should include all five patterns: hip hinge (deadlift, Romanian deadlift), squat (back squat, goblet squat), horizontal push (bench press, push-up), horizontal pull (row), and vertical pull (pull-up, lat pulldown). Vertical push (overhead press) is the sixth and should be included when shoulder health allows. These are the pillars; accessories are optional.
The default progression scheme for beginners: add weight every session (linear progression). For intermediates: add weight every week or every other week. Track every working set. When the prescribed reps are hit across all sets with good form, add 2.5-5 kg to upper body lifts and 5 kg to lower body lifts next session. If progression stalls for 2 consecutive weeks, deload (reduce load by 10-15% for one week) before pushing again.
For strength (1RM focus): 3-5 sets of 3-5 reps at 80-90% effort. For hypertrophy (size focus): 3-5 sets of 6-12 reps. For endurance or work capacity: 2-4 sets of 12-20 reps. Mixing ranges across a program is normal - compound lifts heavier, accessories lighter.
Start every session with 5 minutes of light cardio or general movement, then 2-3 warm-up sets of the first compound lift (50% and 70% of working weight). Keep sessions to 45-75 minutes. Compound lifts first when fresh, isolation accessories last.
Schedule a deload week every 4-8 weeks of hard training: reduce volume by 40-50% while keeping intensity moderate. Sleep 7-9 hours per night - it is the single most effective recovery tool available. Protein timing matters less than total daily protein; focus there first.
Produce a written program document the trainee can log against session by session, containing: (1) the weekly split with named training days matched to training age; (2) each session's exercise list mapped to the five (or six) movement patterns; (3) explicit sets × reps × effort per lift tied to the goal; (4) the progression rule - exact increments and the two-week stall trigger with its deload response; (5) the scheduled deload weeks; and (6) the warm-up protocol. Include equipment substitutions where the default barbell setup is unavailable.
A finished program must: