create-work-breakdown-structure【效率与协作】Create a Work Breakdown Structure (WBS) and WBS Dictionary from project charter deliverables. Covers hierarchical decomposition, WBS coding, effort estimation, dependency identification, and critical path candidates. Use after a project charter is approved, when planning a classic or waterfall project with defined deliverables, breaking a large initi…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Decompose scope → hierarchical work packages → estimate + assign + track. Foundation for effort + resource + schedule.
Read charter. List deliverables + acceptance. Group → 3-7 top-level cats → WBS Level 1.
Got: L1 elements match charter deliverables.
If err: Charter vague → draft-project-charter to refine.
Each L1 → sub-elements (L2, L3). 100% rule: children = 100% parent scope. Stop when pkgs:
WBS outline:
# Work Breakdown Structure: [Project Name]
## Document ID: WBS-[PROJECT]-[YYYY]-[NNN]
### WBS Hierarchy
1. [Level 1: Deliverable Category A]
1.1 [Level 2: Sub-deliverable]
1.1.1 [Level 3: Work Package]
1.1.2 [Level 3: Work Package]
1.2 [Level 2: Sub-deliverable]
2. [Level 1: Deliverable Category B]
2.1 [Level 2: Sub-deliverable]
3. [Level 1: Project Management]
3.1 Planning
3.2 Monitoring & Control
3.3 Closure
Codes (1.1.1 fmt). Max 3-5 levels. Always include "Project Management" branch.
Got: Complete WBS, 15-50 pkgs, unique codes.
If err: >5 levels → scope too large → split sub-projects.
Each leaf → entry:
# WBS Dictionary: [Project Name]
## Document ID: WBS-DICT-[PROJECT]-[YYYY]-[NNN]
### WBS 1.1.1: [Work Package Name]
- **Description**: What this work package produces
- **Acceptance Criteria**: How to verify it's done
- **Responsible**: Person or role
- **Estimated Effort**: [T-shirt size or person-days]
- **Dependencies**: WBS codes this depends on
- **Assumptions**: Key assumptions for this work package
### WBS 1.1.2: [Work Package Name]
...
Got: Entry per leaf pkg.
If err: Missing entries → incomplete decomp → Step 2.
Per pkg, 1 method:
Summary:
## Effort Summary
| WBS Code | Work Package | Estimate | Method | Confidence |
|----------|-------------|----------|--------|------------|
| 1.1.1 | [Name] | 5 pd | person-days | High |
| 1.1.2 | [Name] | M | t-shirt | Medium |
Total = sum of all pkgs.
Got: Every pkg estimated + confidence.
If err: Low confidence >30% pkgs → SME refinement session.
Map deps:
## Dependencies
| WBS Code | Depends On | Type | Notes |
|----------|-----------|------|-------|
| 1.2.1 | 1.1.1 | Finish-to-Start | Output of 1.1.1 is input to 1.2.1 |
| 2.1.1 | 1.1.2 | Finish-to-Start | |
Longest chain = critical path candidate.
Got: Dep table w/ FS relationships.
If err: Cycles → decomp errs → Step 2.
Combine WBS + dict → final docs. Verify 100% rule every level. Stakeholder sign-off.
Got: WBS.md + WBS-DICTIONARY.md created + reviewed.
If err: Missing scope found → add pkgs + re-estimate.
draft-project-charter — scope + deliverables feed decompmanage-backlog — WBS pkgs → backlog itemsgenerate-status-report — report % completeplan-sprint — hybrid: sprint-plan from pkgsconduct-retrospective — review estimation + decomp quality