界面已本地化;技能介绍与说明文档按所选语言由 AI 自动翻译,代码、命令、路径和专业术语保留原文,以原作者文档为准。
探索技能
开发与工程 · SKILL.md

pr-feedback-quality-gate

pr-feedback-quality-gate

【开发与工程】Safely track pull request feedback, resolve review comments or merge conflicts, validate fixes, and use a read-only cross-review before committing or pushing follow-up changes.

独立 GitHub 快照 · 自动分类 · 以原作者文档为准

Nnexu-io / open-designApache-2.0

技能说明

GitHub

name: pr-feedback-quality-gate description: | Safely track pull request feedback, resolve review comments or merge conflicts, validate fixes, and use a read-only cross-review before committing or pushing follow-up changes. triggers:

  • "PR feedback"
  • "review comments"
  • "merge conflicts"
  • "cross-review"
  • "Claude CLI review"
  • "monitor PR" od: mode: utility

PR Feedback Quality Gate

Use this when a PR has review feedback, merge conflicts, pending checks, or needs a monitored follow-up after a fix.

Workflow

  1. Inspect PR state first: comments, reviews, mergeability, checks, branch, and local worktree status. Keep unrelated local changes out of the PR.
  2. Use an isolated worktree for review fixes or conflict resolution when the main checkout is dirty, behind remote, or being used by another agent.
  3. Make the smallest safe fix. Preserve the original bug invariant and any newer upstream structure introduced by main.
  4. Run the narrow validation first, then the repository-required gates. For this repo, include pnpm guard; add package typechecks/builds/tests when touched files require them.
  5. Before commit or push, run a read-only cross-review of the staged or proposed diff. Forbid file edits and git write or coordination commands.
  6. Treat cross-review as evidence, not authority. Accept only findings grounded in the diff, repository rules, user goal, or validation results. Downgrade or reject style preferences, broad scope expansion, and suggestions that conflict with safety or ownership boundaries; record the reason briefly.
  7. If accepted blockers remain, fix them, rerun validation, and repeat the review. Commit and push only after validation passes and there are no accepted blockers.

Monitoring cadence

  • Active review or failing checks: check often enough to unblock quickly.
  • Clean or approved PR waiting for merge: check about every 12 hours.
  • Merged PR: reduce to daily lightweight observation for CI, release, or regression signals, and stop making code changes unless asked.

Report

Always report PR state, actions taken, cross-review verdict, accepted or rejected findings, validation run, commits pushed, skipped checks with reasons, remaining risks, and next step.

我的收藏