算法艺术创作
algorithmic-art
通过代码和可调参数创作生成艺术与交互式视觉效果。
regression-test-plan【设计与创意】Design and prioritize a regression test suite so changes don't break what worked. Use when asked to plan regression testing, build a regression suite, decide what to re-test after a change, or trim a bloated regression pack. Produces a risk-based regression plan — what to re-test and why, prioritised tiers (smoke → full), automation candidates, and a…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Regression testing protects what already works — but re-running everything every time is slow and wasteful, and testing too little ships breakage. The answer is risk-based: re-test what changed, what it touches, and what hurts most if it breaks. This skill builds that prioritised plan and a run strategy, so coverage tracks risk and the suite doesn't balloon.
Given "we're shipping a checkout change, what should we regression-test?", produce the plan anyway — infer the impacted areas and a sensible prioritisation, labelling assumptions. Tie scope to change-impact and risk. Never hand back a question instead of a plan.
Ask for these only if they aren't already provided (else infer and label):
1. Impact analysis — what changed, the areas directly and indirectly affected, and the high-risk zones (shared components, recent bugs, complex logic).
2. Prioritised scope — what to re-test, in tiers:
| Tier | When to run | Scope | Why |
|---|---|---|---|
| Smoke / sanity | every build | critical paths only (login, checkout, save) | fast fail |
| Targeted | this change | the changed area + its direct dependencies | change-impact |
| Full regression | major release / risky change | broad core coverage | safety net |
3. What to skip (and the risk) — explicitly de-scope low-risk, unchanged areas, and name the residual risk.
4. Automation candidates — which cases are stable, high-value, and repetitive enough to automate first (and which to keep manual).
5. Run strategy — when each tier runs (per-commit / per-release), order (critical first), and the entry/exit criteria for sign-off.
Risk-based regression practice — change-impact analysis, tiered smoke/targeted/full suites, automation prioritisation, and release-fit run strategy.