ci-speedup【开发与工程】Cuts the wait from push to green by measuring a pipeline's critical path from run timestamps, then splitting, sharding, trimming setup and sharing test module state, with a before/after ledger. Use when asked to "speed up CI", "CI is slow", "why does a PR take 15 minutes", "CI is the bottleneck", or when agents merge faster than checks finish.
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Make the wait from push to green shorter, measured, and written down.
pr-babysitter), writing a pipeline for a package that has none (scaffold-cli), deleting low-value tests (test-audit), or general repository hygiene.Wall-clock is the slowest chain of dependent jobs, not their sum. The number is push to green for one pull request, median and p90 over recent runs. Around five minutes an agent loop stops waiting on checks and the bottleneck moves to deploy and review. A lever that saves runner minutes off the critical path is a cost saving, and the ledger records it as one.
Three ratios decide what to do next:
| File | Read when |
|---|---|
references/measuring.md | Step 1: run, job, and step timings; percentiles; the critical path; test-runner duration lines; the baseline table. Step 4: the rules that decide whether the after-run credits a lever |
references/levers.md | Step 2: the lever catalogue by class, what each needs to be true, expected gain, how each has failed |
references/ledger.md | Step 5: the ledger, its trend table, and the instruction-file lines that stop the layout regressing |
scripts/ci-timings.sh | Step 1: one run's jobs, steps and critical path, or --runs N for median and p90 per job; --help gives the forms |
evals/evals.json holds scenarios and the with-versus-without comparison for changing this skill; it never loads during a task.
Copy this checklist to track progress:
CI speedup progress:
- [ ] Step 1: Baseline (median and p90 over recent runs, per-step table for the longest job, critical path)
- [ ] Step 2: Choose levers by gain on the critical path, with a predicted chain
- [ ] Step 3: Change the pipeline; re-time locally what can be re-timed
- [ ] Step 4: Push, read the branch's own runs as the after-measurement, iterate
- [ ] Step 5: Ledger with trend, instruction-file lines, and the queue of what is left
Done means a mergeable pipeline change, a ledger whose after column comes from runs on the branch, and instruction-file lines for the layout and the test defaults. Reading runs, re-timing locally, and pushing to the working branch need no check-in; spending money (paid runners, more parallel jobs on a metered plan) and merging are the user's.
Use the run and job API, never memory or the workflow file. scripts/ci-timings.sh --runs 20 --workflow ci.yml --branch main gives median and p90 per job; the single-run form on one default-branch run and one pull request gives the steps and the chain. Name the critical path in a sentence: which jobs, in what order, minutes from run start to the last job's end. Pull the slowest test step's log for the runner's own breakdown, and classify every minute on the path as toolchain, gating, setup, or execution before proposing anything.
Pick from references/levers.md by gain on the chain from Step 1. Write the predicted new chain with its minutes; a plan without a number cannot be checked. Prefer levers the suite itself proves safe (a sharded run passes or does not) over ones that need judgement per file. Runner minutes may rise when wall-clock falls; say by roughly how much, and whether the repository pays for minutes.
Edit the workflow and test configuration in one branch. Measure locally whatever can be measured without pushing, with the current and the new configuration. A change that makes a shard fail is a finding, not a reason to skip that shard.
Keep the guards. Change detection, merge-DAG checks, concurrency groups, and deploy gates exist because of a past incident; move them, do not drop them, and keep the comment that cites the incident next to the guard.
The branch's own runs are the after-measurement. Read them as in Step 1, put the numbers beside the baseline, and apply the verification rules in references/measuring.md before crediting a lever. When predicted and measured disagree, find out why before adding another lever. Repeat until the path stops moving or the remaining levers need a decision the user owns.
Write the ledger from references/ledger.md into the repository's docs: before, changes, after with run ids, a trend row with when the next round is due, and the queue of levers not taken with what each waits on. Add the instruction-file lines for the layout and for how a new test lands in the fast path. Done when the after column comes from real runs, not the prediction.
cancel-in-progress: true on the default branch cancels the superseded run's deploy mid-rollout; cancel on pull requests only. On a pull request the same setting cancels your own measurement: a push while its run is in flight throws that run away. Hold docs-only commits until the measured run completes.node_modules is not worth trying.supabase start --workdir <dir> booted a default project under another container name and supabase status found nothing.needs a job skipped by an if skips too. Where a deploy must run past an optional job, gate on always() and the specific results.fail-fast: true; one red shard cancels the rest and hides how many are red. Set fail-fast: false on test shards.--check . on the whole tree makes docs-only commits ineligible for skipping; only extensions the formatter never matches can be skipped, and only through the changes job's job-level if (references/levers.md, Gating). A workflow-level paths: or paths-ignore: filter on a workflow with a required check leaves that check pending forever when nothing listed changes.cache-from finds a regular image. The cache ref is its own tag.RUN --mount=type=cache without an id shares one directory between parallel builds of different images and corrupts it under the default sharing=shared. Name every mount.turbo run typecheck, lerna run, and npm run -ws --if-present silently skip workspaces that lack the script; a green root command proves nothing about a workspace that never ran. Validate per workspace.pr-babysitter for a run that is red rather than slow, and for watching the pull request this work opens.pr-creator for the pull request; the ledger's before and after tables belong in its body.agents-md when the instruction-file lines from Step 5 grow into a wider AGENTS.md pass.scaffold-cli and scaffold-nextjs when the repository has no pipeline yet; this skill starts from timestamps, which a new repository lacks.