算法艺术创作
algorithmic-art
通过代码和可调参数创作生成艺术与交互式视觉效果。
ideogram-cost-tuning【设计与创意】Govern Ideogram prepaid spend through admission budgets, route choice, output bounds, useful-result accounting, and cleanup. Use when reducing cost or designing billing controls. Trigger with "cut Ideogram spend", "budget Ideogram generations", or "audit Ideogram API cost".
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Control prepaid Ideogram consumption without embedding prices that can drift. Tie admission to an accountable budget, choose the narrowest route, bound outputs and retries, and measure durable safe results rather than HTTP success or generated candidates.
Ideogram API billing is separate from the web application, requires positive prepaid credit, and can use auto-recharge. Keys in one team share credits and billing, so per-key usage is not a separate vendor balance. Prices and recharge choices are time-sensitive and must be verified rather than copied into this skill.
Workers use server-side IDEOGRAM_API_KEY as Api-Key to https://api.ideogram.ai. Cost evidence may include team, endpoint, request, and opaque generation identifiers, but not the key, prompts, images, or URLs.
Use Read, Glob, and Grep for billing adapters, queues, metrics, and fixtures. Use Write and Edit for approved budgets, tests, or documentation. Do not add credit, enable auto-recharge, change prices, or run paid experiments by invocation alone.
Require owners for balance additions, recharge settings, budget changes, lower-quality routes, deleted queued work, paid benchmarks, and production rollout. Cost reduction cannot override safety, rights, or retention policy.
Return pricing review date, budget model, demand and waste breakdown, selected controls, expected and measured impact, quality and safety guardrails, owner, canary, and rollback. Avoid hard-coded future price claims.
submitted=100; safe=92; stored=90; duplicates=0; expired_before_submit=14; budget=within-limit.Reconcile application counts with vendor billing evidence, inject budget exhaustion, retry ambiguity, unsafe output, and storage failure, then verify admission closes. Recheck pricing immediately before approving a financial decision.