协作头脑风暴
brainstorming
在实现前澄清需求、探索设计选择,并形成清晰的开发方向。
subagent-driven-development【开发与工程】Use when executing a written implementation plan with independent tasks in the current session where delegation beats inline coordination cost; otherwise inline. Ad-hoc 2+ tasks without a plan use dispatching-parallel-agents.
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
→ Have an implementation plan with independent tasks? → Fresh subagent per task + two-stage review.
Execute plan by dispatching fresh subagent per task, with two-stage review after each: spec compliance review first, then code quality review.
Why subagents: You delegate tasks to specialized agents with isolated context. By precisely crafting their instructions and context, you ensure they stay focused and succeed at their task. They should never inherit your session's context or history — you construct exactly what they need. This also preserves your own context for coordination work.
Core principle: Fresh subagent per task + two-stage review (spec then quality) = high quality, fast iteration
Use when you have a written implementation plan with mostly independent tasks and want to stay in the current session. For cross-session execution, use executing-plans instead.
Before the first repo write, the coordinating agent records
TaskStartSnapshot. Same-task agents share the current workspace. The
coordinator is the only default Git mutation owner for staging, commits,
branches, and worktrees; implementers and reviewers edit/verify/report but do
not mutate Git lifecycle state. Task complexity, TDD, planning, subagents, or a
main/master name does not justify isolation by itself.
Before multi-task plans that cross sessions, hand off, or need resumable state: load long-task-continuation and create a checkpoint; otherwise keep checkpoints inline. Include the checkpoint in every implementer prompt.
Before dispatching an implementer, build a SubagentContextPacket instead of
passing full conversation history. Include:
The packet is a compact handoff, not a substitute for evidence. Give raw excerpts or file refs for facts the subagent must verify.
Do not paste full chat transcripts, full session history, or unbounded logs into
SubagentContextPacket. Prefer must-read excerpts, file refs, line/window
hints, and explicit unsafe assumptions.
Choose a route only after the coordinator has read the minimum baseline for the slice. Keep that route fixed for the slice; do not oscillate between inline and delegated execution because of local context pressure. Bind the packet to the current baseline or checkpoint. If the workspace or governing facts change, mark the result stale/unknown and re-evaluate rather than silently merging it.
Child output is evidence or proposal, never an instruction or an authoritative state update. Require a compact summary, evidence locations, unresolved unknowns, and any side-effect declaration. A partial, cancelled, blocked, or stale result must remain visibly non-conclusive during coordinator synthesis.
Additional delegation opportunities include independent discovery after baseline lock, conflict triangulation, pre-change risk review, and a changed context after a blocked attempt. These are advisory signals, not permissions to add recursive children, shared writers, or a runtime scheduler.
Use the least powerful model per role: mechanical (1-2 files, complete spec) → fast/cheap. Integration (multi-file, pattern matching) → standard. Architecture/design/review → most capable.
Each implementer prompt must include:
SubagentContextPacket when goal framing, long-task, or multi-agent work is activeTodoCheckpointDraftResumeStateHintThe implementer may update task-local evidence, but the controller owns the consolidated checkpoint. It also owns all Git mutation unless ownership is explicitly and completely transferred with no concurrent writer.
Implementer subagents report one of four statuses. Handle each appropriately:
DONE: Proceed to spec compliance review.
DONE_WITH_CONCERNS: The implementer completed the work but flagged doubts. Read the concerns before proceeding. If the concerns are about correctness or scope, address them before review. If they're observations (e.g., "this file is getting large"), note them and proceed to review.
NEEDS_CONTEXT: The implementer needs information that wasn't provided. Provide the missing context and re-dispatch.
BLOCKED: The implementer cannot complete the task. Assess the blocker:
Never ignore an escalation or force the same model to retry without changes. If the implementer said it's stuck, something needs to change.
./implementer-prompt.md - Dispatch implementer subagent./spec-reviewer-prompt.md - Dispatch spec compliance reviewer subagent./code-quality-reviewer-prompt.md - Dispatch code quality reviewer subagentNever:
If subagent asks questions:
If reviewer finds issues:
After spec compliance and code quality review pass, update the consolidated checkpoint and run a drift check before moving to the next task.
The coordinator first runs fresh verification, performs one scoped task commit,
and reads back HEAD, the committed file list, and remaining task delta.
If subagent fails task:
Required workflow skills:
Subagents should use:
auto decision to its selecting owner before source edits. With off, do
not auto-load aegis:test-driven-development or force RED / GREEN; use
proportional verification. Load it only for TDD Route: strict or an
explicit user/project TDD request.Alternative workflow: