writing-plans

writing-plans

【开发与工程】A discipline for writing a short, reviewed plan before any non-trivial implementation. Plans live under a configurable plans directory (default `docs/plans/`) and follow a prescribed shape — problem, approach, tradeoffs, steps, open questions. Use when the user says "write a plan", "plan this", or "let's plan".

独立 GitHub 快照 · 自动分类 · 以原作者文档为准

技能说明

GitHub

name: writing-plans description: A discipline for writing a short, reviewed plan before any non-trivial implementation. Plans live under a configurable plans directory (default docs/plans/) and follow a prescribed shape — problem, approach, tradeoffs, steps, open questions. Use when the user says "write a plan", "plan this", or "let's plan". compatibility: Designed for Claude (claude.ai, Claude Code, or similar). Requires git for plan-directory resolution; no other runtime dependencies. metadata: author: gregoryfoster version: "1.1" triggers: write a plan, plan this, let's plan

Writing Plans

A discipline for writing a short, reviewed plan before non-trivial implementation. Plans capture problem, approach, tradeoffs, steps, and open questions in a prescribed structure so reviewers can react to a concrete artifact instead of an intent.

Activation triggers: "write a plan", "plan this", "let's plan".

The Iron Law

NO NON-TRIVIAL IMPLEMENTATION WITHOUT A WRITTEN, REVIEWED PLAN

If the work is non-trivial (see Phase 1) and there is no plan committed to the plans directory and acknowledged by the user, you cannot start implementing. Write the plan first.

Rationalization prevention

ThoughtReality
"I'll plan as I go — the structure will emerge"Mid-stream replanning is more expensive than upfront planning, and the user can't review what isn't written. Write the plan first.
"The GitHub issue description is the plan"Issues capture what and why; plans capture how, tradeoffs considered, and steps. They are not interchangeable — write the plan even when the issue is detailed.
"This is small enough to skip"Phase 1 exists to make that call deliberately. If you're tempted to skip because typing the plan feels slow, you're skipping for the wrong reason.

Parameterized invocation

Trigger phrases may include the plan topic inline — e.g., write a plan for auth rotation, plan this migration, let's plan the index rebuild. Apply the appended topic as the explicit subject; skip the "what should we plan?" fallback.

Script path resolution

The skill's scripts/ directory is not at the project root — it ships inside the skill. Resolve its script once, then substitute the printed path wherever <resolve-plans-dir.sh> appears below (#63):

N=writing-plans
for S in resolve-plans-dir.sh; do SD=
  for d in scripts ".claude/skills/$N/scripts" "$HOME/.claude/skills/$N/scripts"; do
    [ -f "$d/$S" ] && { SD="$d"; break; }
  done
  [ -n "$SD" ] || echo "$S not found in scripts/, .claude/skills/$N/scripts/, or ~/.claude/skills/$N/scripts/" >&2
  echo "<$S>=${SD:?}/$S"
done

A project-local scripts/resolve-plans-dir.sh wins if one exists. <resolve-plans-dir.sh> is a placeholder for the literal path printed here, not an inherited shell variable — each Bash invocation runs in a fresh shell. The list resolves per script so that a second script cannot inherit the first one's directory (#301).

Plans directory resolution

Every plan write resolves the target directory in this order (first match wins):

  1. PLANS_DIR env var (highest priority) — explicit override for one-off invocations
  2. .skills/plans_dir file — single-line file under the repo root; project's persistent default
  3. <repo-root>/docs/plans/ — fallback when neither of the above is set

Invoke bash "<resolve-plans-dir.sh>" to print the resolved directory. The plan filename is YYYY-MM-DD-<topic-slug>.md, where <topic-slug> is the topic lowercased with non-alphanumerics replaced by -.

Procedure

Phase 1 — Decide whether a plan is appropriate

A plan is appropriate when at least one applies:

  • The work spans multiple files or modules, or won't fit in one sitting
  • Two or more reasonable approaches exist and the user should choose
  • The change touches shared state (DB schema, public API, deploy config, auth)
  • The operation is hard to reverse (migrations, deletions, force-pushes, third-party calls)
  • The change crosses a stack boundary the user has not yet inspected (e.g., backend touching frontend assumptions)

A plan is not required for:

  • One-file bug fixes with obvious causes
  • Mechanical renames, formatting passes, doc typo fixes
  • Following an existing plan's prescribed steps (the plan itself is the plan)

If none apply, stop. Just do the work. Don't write a plan because the trigger phrase fired.

Phase 2 — Draft the plan

Copy assets/plan-template.md to <plans-dir>/YYYY-MM-DD-<topic-slug>.md and fill in:

  • Problem — what is broken / missing / unclear, and why it matters. One short paragraph. Not how you'll fix it.
  • Approach — the chosen path, in one paragraph. Concrete enough that a reviewer can disagree.
  • Tradeoffs / alternatives — the realistic alternatives considered, each with one line on why it was rejected. If there are no alternatives, say so explicitly and explain why this is the only path.
  • Steps — a numbered list. Each step independently verifiable (a reader should be able to tell, mid-execution, whether step N is done). Aim for 3–10 steps; if you have 20, the plan is too granular or the work is too large.
  • Open questions / risks — anything the user must decide before or during execution. Empty is fine; pretending none exist is not.

Keep the plan short. A reader should consume it in under 5 minutes. If it doesn't fit, split the work.

Phase 3 — Request review

Commit the plan (don't wait for implementation), then surface it to the user with a one-line pointer (amend the commit if review demands changes; new plan only on pivot — see Phase 4):

Plan written: <plans-dir>/YYYY-MM-DD-<topic-slug>.md — review before I start.

Wait for explicit acknowledgment. "Looks good", "proceed", or directed edits all count. Silence does not.

Phase 4 — Execute against the plan

Work through the steps in order. If a step reveals the plan is wrong:

  • Small revision (one step's mechanics changed, no scope change): edit the plan inline, commit the edit, mention it in the next response.
  • Pivot (approach or scope changed): stop. Write a new plan with a Supersedes: <old-plan-path> line in the frontmatter. The old plan stays in the directory as a record.

Never silently diverge from a plan the user reviewed. Either revise it or replace it.

When the user pushes back on the plan itself

Treat plan-review feedback as first-class. The plan is the artifact under review in Phase 3 — not the code that follows. Edits requested at this phase are cheap; the same edits after implementation are not.

Notes

  • Plans are commit-able artifacts. They survive the work that follows them and form a record of why the codebase looks the way it does.
  • The plans directory is project-configurable precisely because some projects keep plans alongside other design docs (docs/plans/), others under a tooling-vendored path. Use the resolution order; don't hardcode.
  • Supersedes: chains let a topic's planning history be reconstructed without git archaeology. Use them on pivot, not on every minor edit. The template's frontmatter exposes this as a lowercase YAML key — set supersedes: <relative path to prior plan> on the new plan.

Self-budget: held to a 6,000-token ratchet (estimate and exact) by tests/structural/test_skill_self_budget.py — both readings must clear it, so no choice of measurement can loosen it.