estimate【效率与协作】Estimate task effort from complexity, dependencies, velocity, risk. Structured estimate with confidence levels.
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.
Read CLAUDE.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.
Read relevant design documents from design/gdd/ if the task relates to a documented feature or system.
Identify files and modules that would need to change:
production/sprints/ for similar completed tasks and historical velocity.
If there is none, say so under Notes and Assumptions — "No sprint history found;
this estimate is not calibrated to the team's velocity" — and treat that as a risk
in the confidence level, not as a silent padding of the figures.Code Complexity:
Scope:
Risk:
## Task Estimate: [Task Name]
Generated: [Date]
### Task Description
[Restate the task clearly in 1-2 sentences]
### Complexity Assessment
| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, gameplay, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | |
| Existing patterns available | [Yes / Partial / No] | |
**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]
### Effort Estimate
| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises |
| Expected | [Y] | Normal pace, minor issues, one round of review |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day |
**Recommended budget: [Y days]**
### Confidence: [High / Medium / Low]
[Explain which factors drive the confidence level for this specific task.]
### Risk Factors
| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|
### Dependencies
| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|
### Suggested Breakdown
| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | |
| 2 | [Core implementation] | [X days] | |
| 3 | [Testing and validation] | [X days] | |
| | **Total** | **[Y days]** | |
### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Any caveats about scope boundaries]
Output the estimate with a brief summary: recommended budget, confidence level, and the single biggest risk factor.
This skill is read-only — no files are written. Verdict: COMPLETE — estimate generated.
/prototype) before committing./create-stories./sprint-plan update to add it to the next sprint (if the project has no sprint plan, as on the default minimal workflow, add it to the brief's build order instead).