视觉画布设计
canvas-design
基于设计原则创作静态视觉作品,用于海报与品牌图形。
gmp-sop【文档与办公】Drafts inspection-ready GMP standard operating procedures for regulated manufacturing. Covers document control, role accountability, process controls, deviation/CAPA handling, and records management aligned to FDA CGMP (21 CFR 210/211), Part 11, ICH Q7/Q9/Q10, WHO GMP, PIC/S, and EU GMP. Use when creating or overhauling a GMP SOP, preparing for audit…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Produces a GMP-compliant SOP that is inspection-ready and operationally executable.
[VERIFY].Collect before drafting:
| Field | Content |
|---|---|
| SOP Title | Precise scope (process/area) |
| SOP ID | Site numbering convention |
| Version | Numeric or semantic |
| Effective Date | Approved use date |
| Supersedes | Prior SOP ID/version |
| Prepared By | Name, role, date |
| Reviewed By | QA, SMEs |
| Approved By | QA/Management |
| Distribution | Controlled locations |
| Related SOPs | IDs and titles |
| Electronic Signatures | Part 11 status |
Purpose:
This SOP establishes controlled steps for [process] to ensure GMP compliance under [reg citations].
Scope:
Applies to [areas, equipment, product types, personnel]. Excludes [exclusions with rationale].
Interfaces: [related SOP IDs].
List only applicable regulations. Use [VERIFY] for unconfirmed citations.
| Authority | Citation |
|---|---|
| FDA CGMP | 21 CFR Parts 210/211 |
| Electronic records | 21 CFR Part 11 |
| ICH | Q7 (API), Q9, Q10 |
| WHO | TRS GMP guidance |
| PIC/S | GMP Guide |
| EU | EU GMP Guide + Annexes |
Provide GMP-aligned definitions consistent with site QMS. Minimum set: CPP, CQA, deviation, OOS, OOT, batch record, validation, qualification, calibration.
| Role | Duties | Decisions/Approvals | Records Owned |
|---|---|---|---|
| Production | Execute SOP steps | Stop work for deviations | Batch records |
| QA | Approve SOP, review deviations | Release/closure authority | QA review logs |
| QC | Testing, sampling | OOS disposition | Lab records |
| Engineering | Maintenance/calibration | Equipment readiness | PM/calibration logs |
| Management | Resource allocation | Final approval | Training matrix |
| Item | ID/Spec | Qualification | Calibration/PM | Acceptance Criteria |
|---|---|---|---|---|
| Equipment | Asset ID | IQ/OQ/PQ status | Frequency | Tolerance |
| Materials | Grade/spec | Supplier status | Storage | COA required |
| Utilities | Water/HVAC/gases | Monitoring | Limits | Action levels |
Each step must specify role, action, records, and acceptance criteria.
| Step | Role | Action | CPP/CQA | Hold Point | Records |
|---|---|---|---|---|---|
| 1 | Production | [imperative action] | [range] | QA if required | [record] |
| 2 | QC | [sample/test] | [spec] | QA review | [record] |
| 3 | QA | [verification] | N/A | Release | [record] |
Step rules:
| Control | Frequency | Method | Acceptance | Action if OOR |
|---|---|---|---|---|
| [Control] | [per batch/time] | [method] | [spec] | [action] |
| Record | Owner | System | Review Timeline | Retention |
|---|---|---|---|---|
| Batch record | Production | Paper/eQMS | [timeframe] | Per 21 CFR 211.180 [VERIFY] |
| Calibration log | Engineering | Paper/eQMS | [timeframe] | [policy] |
| Training record | QA/HR | LMS/eQMS | [timeframe] | [policy] |
If electronic: require validation, audit trails, access control, e-signatures per Part 11.
| Version | Effective Date | Change Summary | Rationale | Approvers |
|---|---|---|---|---|
| 1.0 | [date] | Initial release | [reason] | [names] |
List all cited standards with version/date. Mark uncertain items [VERIFY].
Include controlled templates: SOP execution checklist, batch record template, deviation report template, in-process control log, equipment cleaning log.
[VERIFY]