视觉画布设计
canvas-design
基于设计原则创作静态视觉作品,用于海报与品牌图形。
data-processing-addendum【文档与办公】Drafts a GDPR Article 28-compliant Data Processing Addendum (DPA) between data controllers and processors. Extracts party details, processing scope, and service terms from uploaded documents. Produces an execution-ready DPA with all mandatory Art. 28(3) elements and four schedules. Use when supplementing a service agreement with data protection terms…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
name: data-processing-addendum language: en description: Drafts a GDPR Article 28-compliant Data Processing Addendum (DPA) between data controllers and processors. Extracts party details, processing scope, and service terms from uploaded documents. Produces an execution-ready DPA with all mandatory Art. 28(3) elements and four schedules. Use when supplementing a service agreement with data protection terms, negotiating processor contracts, or establishing GDPR-compliant EU data processing relationships. tags:
Drafts an Art. 28-compliant DPA as a standalone addendum to an underlying service agreement, covering all mandatory processor obligations and four execution-ready schedules.
Extract from uploaded documents before drafting:
Produce a numbered, cross-referenced document: recitals, operative provisions (Sections 1–11), signature block, and four schedules (A–D). Draft schedules in parallel with their corresponding sections.
| Element | Requirement |
|---|---|
| Party identification | Full legal name, address, registration number, DPO details |
| Hierarchy | DPA prevails over main agreement on data protection matters |
| Effective date | Specify; note retroactive application if processing already underway |
| Integration | DPA forms integral part of main agreement |
Schedule C minimum domains:
| Domain | Scope |
|---|---|
| Pseudonymization & encryption | At-rest, in-transit, key management |
| Confidentiality & integrity | Access controls, least-privilege, logging |
| Availability & resilience | Redundancy, DR, RTO/RPO |
| Testing & evaluation | Pen-test cadence, vulnerability management |
| Personnel | Confidentiality obligations for all authorized personnel |
Reference existing certifications (ISO 27001, SOC 2 Type II, TISAX) as baseline evidence.
| Parameter | Position |
|---|---|
| Notice | 30 days (routine); shorter for cause |
| Frequency | Annual unless cause exists |
| Auditor | Controller team or independent third party (under NDA) |
| Remote audits | Permitted |
| Alternative evidence | Art. 42/40 certification, SOC 2 Type II, ISO 27001 (current and comprehensive) |
| Costs | Controller bears routine; processor bears remediation costs for non-compliance |
| Remediation | Specified timeline; escalation; controller may suspend or terminate for material breach |
| Schedule | Contents |
|---|---|
| A | Approved sub-processors: name, address, processing location, activity |
| B | Processing description: subject matter, duration, nature/purpose, data types, data subject categories |
| C | Technical and organizational security measures (by domain per Section 4) |
| D | Certifications, audit reports, compliance documentation |
Flag any schedule where source documents lack sufficient detail; note required information for completion.