算法艺术创作
algorithmic-art
通过代码和可调参数创作生成艺术与交互式视觉效果。
cyber-physical【设计与创意】Cyber-physical / industrial control system (ICS-SCADA) architecture in general: the Purdue model levels, control loops, IT/OT convergence, OT security (IEC 62443, segmentation, zero-trust for OT), safety, determinism, and redundancy. Architect-level, beyond any specific DCS/PLC product. USE WHEN: designing/evaluating industrial control, SCADA, robot…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
name: cyber-physical description: | Cyber-physical / industrial control system (ICS-SCADA) architecture in general: the Purdue model levels, control loops, IT/OT convergence, OT security (IEC 62443, segmentation, zero-trust for OT), safety, determinism, and redundancy. Architect-level, beyond any specific DCS/PLC product.
USE WHEN: designing/evaluating industrial control, SCADA, robotics, energy, automotive, or IoT-at-scale systems, "OT security", "Purdue model", "PLC/RTU/ SCADA architecture", "IT/OT convergence", "IEC 62443", "control loop", safety instrumented systems.
industrial/* skills); pure RTOS scheduling (use embedded-rtos); app
security (use security-architecture).
allowed-tools: Read, Grep, GlobGeneralizes the product-specific industrial/* skills (DCS, IEC 61131, ISA) into
engine-agnostic control-system design. A cyber-physical system couples
computation with physical processes through sensors and actuators in
closed control loops, where a software fault can have physical consequences.
L5/4 Enterprise / MES / ERP (IT)
------------------- IT/OT boundary (DMZ) -------------------
L3 Operations / historians / engineering workstations
L2 SCADA / HMI / supervisory control
L1 Controllers: PLC / RTU / DCS
L0 Field devices: sensors, actuators, drives (physical process)
Architecture is organized by these levels; the IT/OT boundary is the critical trust boundary to design and defend.
embedded-rtos); jitter degrades control.security-architecture.Treat the IT/OT boundary as the primary trust boundary; segment by Purdue level; keep safety functions independent and redundant; design for determinism and availability first; and assume connectivity — secure it (IEC 62443) rather than relying on isolation.