协作头脑风暴
brainstorming
在实现前澄清需求、探索设计选择,并形成清晰的开发方向。
pom-review-process【开发与工程】Use when understanding or planning for Production and Operations Management (POM) review — Department Editor screening, double-blind review, the rigor-and-practice evaluation, and the strict no-resubmission-after-rejection rule. Explains the process and reads decisions; it does not draft the response (pom-rebuttal).
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
POM routes each submission to a Department, where a Department Editor owns the paper end to end — this department/college structure is a defining POMS norm, distinct from a single central editor. The Department Editor screens for fit and contribution, then manages double-blind peer review. Founder & Editor-in-Chief Kalyan Singhal (University of Baltimore) leads the journal, with Subodha Kumar as Co-Editor-in-Chief (verified via POMS / SAGE, 2026-06-22; re-check the masthead before relying on it).
POM applies a twin standard: scholarly rigor and significant interest to practicing operations managers. Expect two lenses:
The practice-relevance gate is real and is reinforced by POMS's award culture (e.g., Wickham Skinner, Martin K. Starr, the J. George Shanthikumar Best Data Science and eOperations Paper, and the Cheryl Gaimon Best Innovation Paper), which honor papers tied to specific departments at the POMS Annual Conference.
POM is stricter than most peers: a paper rejected in one department may not be resubmitted to the same or a different department of the journal unless the decision letter explicitly invited resubmission. Read the letter carefully — only an explicit invitation reopens the door. An R&R ("revise and resubmit") is such an invitation; a reject is not, and reframing a reject as a new submission risks a desk reject and reputational cost.
pom-rebuttal; keep the same Department Editor across rounds. Revised manuscripts still respect the 32-page main-document cap.Use this as a second-pass capability check. First lock the operational decision, the performance metric, and the implementable lever; then test whether the manuscript addresses POM reviewers who want operational insight tied to production, service, supply-chain, or platform decisions.
claim / evidence / blocker / next edit rows so the next pass can patch the manuscript directly.resources/official-source-map.md for volatile rules and name the one unresolved fact that could change the recommendation.【Decision type】R&R (major/minor) / reject / reject-with-invitation
【Department】<department + editor>
【Concern axes】fit / contribution / method / practice relevance / presentation
【Resubmission allowed?】yes (invited) / no
【Best action】revise via pom-rebuttal / move to another OM venue
【Next step】pom-rebuttal (if R&R)