协作头脑风暴
brainstorming
在实现前澄清需求、探索设计选择,并形成清晰的开发方向。
jop-rebuttal【开发与工程】Use when writing the response to a The Journal of Politics (JOP) revise-and-resubmit. The response must convert each reviewer without alienating the editor, stay within JOP's page budget, keep the manuscript double-blind, and preserve replicability so the eventual JOP replication-analyst check passes. Structures the response letter; it does not fabri…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
A JOP R&R is a strong signal — the editor sees a path to publication. The response letter must move every reviewer toward yes while keeping the editor confident the revision is convergent, and it must do so without blowing the page budget, breaking double-blind anonymity, or breaking replicability that the analyst will later check.
jop-replication-and-data-policy).For each reviewer comment:
> [Quoted reviewer comment]
Response: [What we did / why we respectfully disagree].
Change: [Section/page/table-figure number; note if it moved to the Online Appendix].
Open with a short summary of the main changes to the editor; group by reviewer; end each entry with the location of every change so the editor can verify quickly.
Not every demand deserves the same response. Sort each comment by cost and by whether it threatens the contribution, and let the editor's letter set priority. The page budget caps new main-text material, so most additions land in the Online Appendix.
| Demand type | Default response | Where the change lands |
|---|---|---|
| Decisive point the editor flagged | Do it; lead the letter with it | Main text, with the new exhibit number |
| Reasonable robustness request | Run it and report | Online Appendix, cited in one main-text line |
| Demand that breaks the argument | Push back respectfully with a reason | Letter only; explain the tradeoff |
| Two reviewers want opposite things | Choose a principled path, name the conflict | Letter, addressed to the editor |
A hypothetical R&R on the AVR-turnout study draws three demands. R1 wants the staggered-DID estimator made heterogeneity-robust — decisive, so the author re-estimates and the new event-study figure becomes Figure 2. R2 wants 30 added specifications; the author runs a focused subset in the appendix and explains the full grid would blow the page budget. R3 wants a structural model the data cannot support; the author declines respectfully and flags it as future work. Each new number is regenerated by deposited code.
【Editor's decisive points】addressed first? [list]
【Coverage】every reviewer comment answered? [Y/N]
【Concede vs rebut】each tagged with evidence + change location
【Reviewer conflicts】reconciled and explained to editor? [Y/N]
【Page budget】revision still within 35 / 10 pp (overflow → appendix)? [Y/N]
【Anonymity + replicability】preserved in revised manuscript + package? [Y/N]
【Next】resubmit via Editorial Manager
../../resources/official-source-map.md — JOP review/decision process, page limits, replicability-contingent acceptance