算法艺术创作
algorithmic-art
通过代码和可调参数创作生成艺术与交互式视觉效果。
mobicom-experiments【设计与创意】Use when designing or auditing the evaluation of a MobiCom submission — building real-device testbeds, choosing RF and channel measurement methodology, injecting realistic mobility and interference, profiling energy on hardware, picking tuned baselines, and reporting distributions so wireless reviewers see where the mechanism wins and breaks.
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
MobiCom's evidence culture is physical: a mobile/wireless mechanism is believed when it is measured over the air, on real hardware, under conditions that resemble deployment. A simulation-only or single-run evaluation reads as under-done here. Design the evaluation as a set of questions about the mechanism, then build the smallest measurement campaign that answers them on real radios.
Write the evaluation's subsection titles as questions first — Does the mechanism hold under mobility? What does it cost in energy at rest? When does the channel defeat it? — then design one experiment per question. The inverted approach (run everything, narrate the survivors) produces the benchmark tour that MobiCom reviews call unfocused.
A minimal matrix for a wireless-mechanism paper:
| Question | Experiment | Metrics that answer it |
|---|---|---|
| Does it work in the motivating condition? | over-the-air run under the target channel/mobility | delivery rate, goodput, SNR/BER distribution |
| What does it cost when idle? | baseline with no stress | energy-per-bit, power draw, CPU/airtime overhead |
| Why does it work? | component breakdown / ablation | per-mechanism contribution |
| Does it scale? | node / distance / density sweeps | knee location, per-node or per-meter curve |
| When does it break? | interference, deep fades, high mobility | the regime where baselines win |
| Does it hold over time? | multi-hour or multi-day runs | drift, stability, tail behavior |
Battery and harvested-energy claims are common at MobiCom and are held to instrument-level scrutiny:
Energy report checklist:
instrument: power monitor / shunt + DAQ, sampling rate
quantity: energy-per-bit or per-operation, not just average power
boundary: what is inside the measured envelope (radio only? whole tag?)
budget: for harvested/batteryless designs, the source and the duty cycle
An energy claim that cannot be re-derived from a described measurement setup should not survive your own audit.
mobicom-writing-style).mobicom-artifact-evaluation).[Evidence form] over-the-air testbed / deployment / trace / simulation (claimed vs actual)
[Question map] question -> experiment -> metric (gaps flagged)
[RF+channel] setup and conditions specified? y/n per headline experiment
[Energy] measured, with instrument and boundary? y/n
[Baseline audit] incumbent tuned? do-less present?
[Break condition] regime where the mechanism loses: <named or MISSING>
[Priority additions] ordered by review-risk reduction per testbed-week