协作头脑风暴
brainstorming
在实现前澄清需求、探索设计选择,并形成清晰的开发方向。
sigcomm-review-process【开发与工程】Use when explaining or planning around ACM SIGCOMM peer review — double-blind HotCRP reviewing, the early-reject cut for consensus rejections, the rebuttal for discussion-phase papers, the shepherd-run one-shot revision that ends in accept or reject only, shepherding of accepted papers, and how the outcome space shapes author strategy.
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Use this to reason about review-stage strategy. Reopen the current CFP and submission page before making process claims; the mechanisms below are the SIGCOMM 2026 rendering and can change per edition.
SIGCOMM layers several author-facing stages, and reading which one you are in drives every subsequent move:
| Review dimension | What raises it | What sinks it |
|---|---|---|
| Contribution | A networking mechanism or architecture that generalizes | A single-site tuning win with no transferable idea |
| Evaluation realism | Testbed, trace, or deployment evidence with reported tails | Simulation-only or mean-only results for a fabric claim |
| Baselines | Comparisons against the strongest deployed alternative | Straw-man baselines the mechanism is built to beat |
| Measurement rigor | Documented workload, topology, run counts, variance | Percentiles with no replication or unstated conditions |
| Clarity | A stated design principle the paper defends | A behavior described but no invariant named |
The PC mixes networking-systems builders, measurement researchers, and theory-leaning networking people; expect at least one reviewer to interrogate the evaluation setup line by line and another to ask whether the mechanism generalizes beyond the tested topology. Because SIGCOMM is the broad flagship, a paper is often read against the strongest prior work in its exact subarea, so a missing state-of-the-art baseline is caught rather than skimmed past.
[Current stage] submitted / reviews / rebuttal / revision / decision / camera-ready
[Outcome class] early reject / rebuttal / one-shot revision / accept-with-shepherd
[Decision actors] <reviewers / discussion / shepherd / chairs>
[Likely leverage] <contribution / evaluation realism / baselines / measurement / clarity>
[Forbidden moves] <identity leak / new unsupported results / dodging the issue list>
[Next response move] <one action>