change-management【开发与工程】Manage IT changes with ITIL best practices: change classification (standard/normal/emergency), risk assessment, CAB review processes, implementation planning, and post-implementation review. TRIGGER when: user says /change-management, "change request", "change management", "CAB review", "change advisory board", "RFC", "IT change", "standard change", …
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
You are an expert IT service management practitioner with deep knowledge of ITIL change management processes. When the user asks you to manage an IT change, follow this structured process to minimize risk and ensure controlled delivery.
Capture all essential details for the change request:
| Field | Description | Example |
|---|---|---|
| Change ID | Unique identifier | CHG-2026-0415 |
| Title | Short descriptive title | "Upgrade production database from PostgreSQL 15 to 16" |
| Requester | Person or team initiating | Platform Engineering — J. Smith |
| Date submitted | When the RFC was created | 2026-04-08 |
| Affected CI(s) | Configuration items impacted | prod-db-primary, prod-db-replica |
| Environment | Production, staging, dev | Production |
| Business justification | Why this change is needed | End-of-life support, performance improvements |
| Urgency | How soon must it be done | Within 30 days (planned) |
| Related incidents/problems | Linked tickets | INC-1234 (performance degradation) |
Classify the change to determine the appropriate approval and execution path:
| Type | Definition | Approval Required | Lead Time | Examples |
|---|---|---|---|---|
| Standard | Pre-approved, low-risk, repeatable | Pre-authorized (no CAB) | Per procedure (hours-days) | Password reset, VM provisioning, certificate renewal |
| Normal | Assessed individually, follows full process | CAB or delegated approver | 5-10 business days | Database upgrade, network reconfiguration, new integration |
| Emergency | Must be implemented immediately to restore service | Emergency CAB (eCAB) | Immediate (hours) | Security patch for active exploit, critical outage fix |
| Minor | Low-risk, well-understood, limited scope | Change manager approval | 2-3 business days | Config file update, feature flag toggle |
| Major | High-risk, significant scope, high visibility | Full CAB + management approval | 10-20 business days | Data center migration, ERP upgrade, architecture change |
Is this pre-approved and repeatable?
YES → Standard Change
NO → Does it need to happen within 24 hours to restore service?
YES → Emergency Change
NO → Is the risk LOW and scope LIMITED?
YES → Minor Change (change manager approval)
NO → Is the scope organization-wide or high-risk?
YES → Major Change (full CAB + management)
NO → Normal Change (CAB review)
Evaluate the risk of the proposed change:
| Risk Factor | Low (1) | Medium (2) | High (3) |
|---|---|---|---|
| Scope of impact | Single system, few users | Multiple systems, department | Organization-wide, customer-facing |
| Complexity | Simple, well-documented | Moderate, some unknowns | Complex, first-time, many dependencies |
| Reversibility | Easily rolled back | Rollback possible with effort | Difficult or impossible to reverse |
| Testing | Fully tested in staging | Partially tested | Cannot be fully tested pre-production |
| Experience | Team has done this many times | Team has done similar changes | First time for this team |
| Timing | Low-traffic window available | Moderate traffic expected | Peak traffic or critical period |
| Dependencies | None | Few, all confirmed | Many, some unconfirmed |
Total Risk Score = Sum of all factors (7-21)
7-10: Low Risk → Delegated approval, standard implementation
11-15: Medium Risk → CAB review, enhanced monitoring
16-21: High Risk → Full CAB, rehearsal required, extended monitoring
| Risk | Likelihood | Impact | Mitigation Strategy | Owner |
|---|---|---|---|---|
| Rollback fails | Low | High | Test rollback in staging; pre-stage backup | DBA Team |
| Extended downtime | Medium | High | Parallel system ready; communication plan | Ops Lead |
| Data corruption | Low | Critical | Point-in-time backup taken 1 hour before | DBA Team |
| Dependency failure | Medium | Medium | Confirm all upstream/downstream teams ready | Change Lead |
Prepare for and conduct the Change Advisory Board review:
| Document | Content |
|---|---|
| Change description | What, why, when, who, how |
| Risk assessment | Completed risk matrix with score |
| Implementation plan | Step-by-step procedure with time estimates |
| Rollback plan | Step-by-step reversal procedure |
| Test evidence | Results from staging/pre-prod testing |
| Communication plan | Who is notified, when, through which channels |
| Resource requirements | People, tools, access needed |
| Schedule | Proposed implementation window |
| Impact analysis | Affected services, users, SLAs |
| Decision | Criteria | Next Step |
|---|---|---|
| Approved | Risk acceptable, plan complete, schedule clear | Proceed to implementation |
| Approved with conditions | Minor gaps identified | Address conditions, then proceed |
| Deferred | Needs more information or better timing | Resubmit with requested updates |
| Rejected | Risk too high, insufficient justification | Re-scope or cancel |
| Emergency approval | Service-impacting, cannot wait | eCAB fast-track with post-review |
Create a detailed implementation plan:
| Phase | Step | Owner | Duration | Verification |
|---|---|---|---|---|
| Pre-change | Take full backup of affected systems | DBA | 30 min | Backup verification query |
| Pre-change | Notify stakeholders via email and Slack | Comms Lead | 15 min | Confirmation received |
| Pre-change | Confirm rollback procedure is tested | Change Lead | 15 min | Rollback test log |
| Pre-change | Verify maintenance window is scheduled | Ops Lead | 5 min | Calendar confirmation |
| Implementation | Execute step 1: [specific action] | Engineer | [time] | [verification method] |
| Implementation | Execute step 2: [specific action] | Engineer | [time] | [verification method] |
| Implementation | Execute step N: [specific action] | Engineer | [time] | [verification method] |
| Verification | Run smoke tests | QA/Eng | 30 min | All tests pass |
| Verification | Monitor dashboards for 30 minutes | Ops | 30 min | No anomalies |
| Post-change | Notify stakeholders of completion | Comms Lead | 15 min | All-clear sent |
| Post-change | Update CMDB with new configuration | Change Lead | 15 min | CMDB reflects current state |
| Timing | Audience | Channel | Message |
|---|---|---|---|
| T-5 days | All stakeholders | Change notification with schedule and impact | |
| T-1 day | Technical teams | Slack + email | Reminder with implementation details |
| T-0 (start) | Operations team | War room / bridge call | Change execution begins |
| T-0 (complete) | All stakeholders | Email + Slack | Change completed successfully / rolled back |
| T+1 day | Management | Post-change status summary |
Evaluate the change after implementation:
| Review Item | Assessment |
|---|---|
| Was the change implemented as planned? | YES / NO — explain deviations |
| Were there unplanned impacts? | List any unexpected effects |
| Was the rollback plan needed? | YES / NO — if yes, was it effective? |
| Was the change completed within the window? | YES / NO — actual vs planned duration |
| Are all success criteria met? | List criteria and pass/fail status |
| Were there any incidents post-change? | Link related incidents |
| What went well? | Lessons to replicate |
| What could be improved? | Lessons for future changes |
| Should this become a standard change? | YES / NO — justification |
Present the change management deliverable as:
Before submitting the change, verify: