算法艺术创作
algorithmic-art
通过代码和可调参数创作生成艺术与交互式视觉效果。
country-india【设计与创意】India-specific architectural code and regulatory reference. Covers the National Building Code of India (NBC 2016), Energy Conservation Building Code (ECBC 2017) and ECBC for Residential Buildings (ECBC-R 2018, also called Eco-Niwas Samhita), Indian Standards for structural design (IS 456:2000 concrete, IS 800:2007 steel, IS 875 Parts 1-5 loads, IS 18…
独立 GitHub 快照 · 自动分类 · 以原作者文档为准
Architectural code and regulatory reference for projects located in any Indian state or Union Territory. Activate this skill whenever the project location is in India, when an Indian city is referenced, when Indian rupee currency or area-units like "square feet built-up" / "carpet area" / "lakh" / "crore" appear, or when codes like NBC, ECBC, or IS series are mentioned.
India operates as Archetype B (National Model + State Adoption), with significant deviation between national framework and state/municipal enforcement.
LEVEL 1 -- NATIONAL FRAMEWORK (advisory, except where state has adopted)
- Bureau of Indian Standards (BIS) -- publishes NBC 2016 + IS codes
- Ministry of Housing and Urban Affairs (MoHUA) -- urban policy
- Bureau of Energy Efficiency (BEE) -- ECBC 2017, ECBC-R 2018
- Ministry of Environment, Forest and Climate Change (MoEFCC) -- EIA notifications
- National Disaster Management Authority (NDMA) -- guidelines
- Directorate General of Civil Aviation (DGCA) -- height NOC near aerodromes
LEVEL 2 -- STATE FRAMEWORK (legally binding)
- State Town & Country Planning Department -- planning laws
- State Fire Services -- Fire NOC, periodic renewal
- State Pollution Control Board -- Consent to Establish/Operate
- State Electricity Regulatory Commission -- electrical sanction
LEVEL 3 -- LOCAL FRAMEWORK (legally binding, project-specific)
- Municipal Corporation OR Development Authority -- Building Permit
+ MCGM (Greater Mumbai), MCD (Delhi), BBMP (Bangalore), GCC (Chennai),
GHMC (Hyderabad), KMC (Kolkata), PMC (Pune), AMC (Ahmedabad),
MCC (Chandigarh), etc.
+ MMRDA, DDA, BDA, CMDA, HMDA, KMDA -- jurisdictional Development Authorities
- District Magistrate / Collector -- land use, NA conversion
- Local Fire Services -- on-site NOC
LEVEL 4 -- PROJECT-SPECIFIC CLEARANCES
- EC (Environmental Clearance) for >20,000 sqm built-up (EIA 2006 + amendments)
- Aviation NOC if within 20-km of aerodrome reference point
- Heritage NOC if within heritage precinct (ASI/SHA)
- Coastal Regulation Zone (CRZ) clearance per CRZ 2019
- Forest clearance if on forest land
- Defence/Army NOC if within designated zones
- RERA registration if >500 sqm or >8 apartments (RERA Act 2016)
The National Building Code of India 2016 (NBC 2016, BIS SP 7:2016, two volumes, ~3,500 pages) is advisory at the national level. It becomes binding only when:
NBC 2016 is organized in 12 Parts (P1 to P12), with several Parts subdivided into Sections:
| Part | Title | Content |
|---|---|---|
| Part 1 | Definitions | Glossary, references |
| Part 2 | Administration | Permit process, sanctioning authority duties |
| Part 3 | Development Control Rules + General Building Requirements | Setbacks, FAR, open spaces, common requirements |
| Part 4 | Fire and Life Safety | Compartmentation, exits, fire ratings, sprinklers (the most-cited Part) |
| Part 5 | Building Materials | IS-spec material requirements |
| Part 6 | Structural Design | Section 1 Loads; 2 Soils & Foundations; 3 Timber; 4 Masonry; 5 Concrete; 6 Steel; 7 Prefab; 8 Glass |
| Part 7 | Construction Management, Practices and Safety | Site safety, scaffolding, demolition |
| Part 8 | Building Services | Section 1 Lighting; 2 Electrical; 3 Air-conditioning; 4 Acoustics; 5 Plumbing/Drainage; 6 Lifts/Escalators |
| Part 9 | Plumbing Services | Section 1 Water Supply; 2 Drainage; 3 Solid Waste; 4 Gas Supply |
| Part 10 | Landscape, Signs and Outdoor Display | Streetscape requirements |
| Part 11 | Approach to Sustainability | NBC's sustainability framework (predates GRIHA mandate) |
| Part 12 | Asset and Facility Management | Operations & maintenance |
| State / UT | NBC 2016 Adoption | ECBC 2017 Mandated | Notes |
|---|---|---|---|
| Maharashtra | Full (UDCPR 2020) | Yes, since 2018 | Mumbai uses MCGM DCPR 2034; rest of state uses Unified DCPR 2020 |
| Delhi NCT | Full via MPD 2041 + Building Bye-Laws 2016 | Yes, since 2017 | DDA/MCD apply NBC + DUAC review for heritage areas |
| Karnataka | Full via KMBBL 2003 (updated) | Yes, since 2018 | Bangalore zoning regs under BDA + BBMP bye-laws |
| Tamil Nadu | Full via TNCDBR 2019 | Yes, since 2018 | Chennai under CMDA Master Plan-II + TN Combined DCR & Building Rules 2019 |
| Telangana | Full via GO 168/2012 + updates | Yes, since 2017 | HMDA / GHMC bye-laws + 2020 amendments |
| Andhra Pradesh | Full via APBBR 2017 + 2020 amendments | Yes | APCRDA for Amaravati / VMRDA Vizag |
| West Bengal | Full via KMC Building Rules 2009 + amendments | Yes, since 2019 | Kolkata under KMC + KMDA; rest of state under state PWD rules |
| Gujarat | Full via GDCR 2017 (Comprehensive General Development Control Regulations) | Yes, since 2018 | Ahmedabad AUDA, Surat SUDA, Vadodara VUDA |
| Rajasthan | Full via Rajasthan Building Bye-Laws 2020 | Yes | JDA for Jaipur, AUIT for Ajmer, JODA for Jodhpur |
| Uttar Pradesh | Full via UPABBR 2008 + amendments | Yes, since 2018 | Lucknow LDA, NOIDA, Greater NOIDA Authorities |
| Kerala | Full via KMBR/KPBR 2019 (revised 2024) | Yes, since 2019 | Local Self Government Department supervises |
| Punjab | Full via PMBBR 2018 | Yes | Each Municipal Corporation has variation |
| Haryana | Full via HBC 2017 + 2019 amendments | Yes, since 2017 | HUDA / HSVP for new sectors, GMDA for Gurugram |
| Madhya Pradesh | Full via MPBBL 2012 + amendments | Yes | TPS schemes prevail in larger cities |
| Bihar | Partial; State Building Bye-Laws 2014 | Partial (large commercial only) | BMC Patna; older infrastructure |
| Odisha | Full via OBBL 2018 | Yes, since 2019 | BDA Bhubaneswar, CDA Cuttack |
| Assam | Partial; ABBL 2014 | Limited | GMDA Guwahati; northeastern states often follow Assam by reference |
| All NE States | Variable; most defer to NBC + Assam pattern | Limited | Variable adoption |
| Jammu & Kashmir | Reorganised 2019; JK Building Bye-Laws under revision | -- | UT administration; J&K Master Plan 2035 in force |
| Chandigarh UT | Chandigarh Building Rules (Urban) 2017 | Yes | Le Corbusier zoning preserved |
| Goa | GTCP Act 1974 + Regulations 2010 + 2020 amendments | Partial | Coastal restrictions paramount |
When advising on a specific project, always confirm: (i) which state, (ii) which city's Municipal Corporation or Development Authority, (iii) date of pending Building Permit application (as code version in force depends on application date).
NBC defines 9 Occupancy Groups (A through I):
| Group | Occupancy | Subdivisions | Examples |
|---|---|---|---|
| A | Residential | A-1 Lodging; A-2 One-family/Two-family; A-3 Dormitories; A-4 Apartment houses; A-5 Hotels; A-6 Starred Hotels | Apartments, hostels, hotels |
| B | Educational | B-1 Schools up to senior secondary; B-2 All others (colleges, universities) | Schools, colleges |
| C | Institutional | C-1 Hospitals/sanatoria; C-2 Custodial institutions; C-3 Penal institutions | Hospitals, jails, orphanages |
| D | Assembly | D-1 (>1000 persons); D-2 (>300, <=1000); D-3 (>100, <=300); D-4 (<=100); D-5 Outdoor assembly; D-6 Cinemas/theatres; D-7 Stadia | Theatres, halls, marriage halls |
| E | Business | E-1 Offices; E-2 Laboratories; E-3 Research; E-4 Tele-call centres | Offices, IT parks |
| F | Mercantile | F-1 Retail (small); F-2 Wholesale; F-3 Super markets/Department stores | Shops, malls |
| G | Industrial | G-1 Low hazard; G-2 Moderate; G-3 High hazard | Factories, mills |
| H | Storage | H-1 (low); H-2 (moderate) | Warehouses |
| I | Hazardous | (specially regulated) | Chemical plants, magazines, oil/gas |
NBC 2016 has no single height-vs-construction-type table equivalent to IBC Table 504; instead, height/area limits are embedded in Part 4 (Fire), Part 3 (Development), and state DCRs.
Critical thresholds:
| Threshold | Trigger | Source |
|---|---|---|
| High-Rise Building | >= 15 m height (residential, hotel) OR >= 18 m (other occupancies) -- from average ground level | NBC 2016 Part 4, 3.1.40 |
| Special Building | Group D-1/D-2/D-6 (assembly), Group E factories with hazardous material, Group H, hotels with floor area >500 sqm + height >9 m, hospitals >9 m, schools >9 m, basement >300 sqm | NBC 2016 Part 4, 3.1.84 |
| EIA Threshold | >20,000 sqm built-up area (per EIA Notification 2006 + 2014 amendment + January 2020 amendment) -- Category B2 with State EIA Authority; >150,000 sqm or specific industries -- Category A with national MoEFCC | EIA Notification 2006 (and amendments) |
| Fire NOC Required | All high-rise buildings, special buildings, hospitals, hotels with >= 20 rooms; some states require below these thresholds too | NBC 2016 Part 4 + state Fire Services rules |
| RERA Registration | Project on >500 sqm OR >8 apartments | RERA Act 2016 Sec. 3 |
| Aviation NOC | Buildings within 20 km of aerodrome reference point (varies by airport classification) | DGCA NOCAS 2.0 portal; per aircraft operator restrictions |
FAR (Floor Area Ratio) in India is computed differently across states. Some include balconies/lifts, others exclude. Always confirm with the local DCR.
| City | Typical Residential FAR | Typical Commercial FAR | Notes |
|---|---|---|---|
| Mumbai (MCGM DCPR 2034) | Base 1.33, Permissible 3.0 (with premium FSI + TDR), up to 5.0 in TOD | Base 1.33, up to 5.0 with premium | Distinction: "Built-up FSI" vs "Composite FSI"; transit-oriented zones higher |
| Delhi (MPD 2041 + Unified Building Bye-Laws 2016) | 200-350% (varies by plot size); up to 400% mixed-use | 200-450% | "FAR" used, includes mezzanine; balconies excluded if <=10% |
| Bangalore (BBMP Bye-Laws 2003) | 1.75 (up to 3.25 for big plots), TDR-augmented | 1.75-3.25 | RMP 2031 increased FAR with road width |
| Chennai (CMDA Second Master Plan) | 1.5-2.0 (special buildings up to 2.5) | 2.0-3.5 | Premium FSI 50% extra on payment |
| Hyderabad (GO 168 + GHMC) | Unlimited (subject to setback + height + insurance), within Master Plan | Unlimited subject to same | Insurance premium based on height |
| Kolkata (KMC Building Rules 2009) | Varies by ward; 1.5-3.5 | 2.0-4.0 | "FAR" computed on plot area + 25% road area |
| Pune (Maharashtra UDCPR 2020) | 1.1-2.5 base, premium up to 3.5 | Same | Aligned with MCGM concept of permissible vs base |
| Ahmedabad (Gujarat GDCR 2017) | Up to 2.7 (RC), 4.0 (CBD) | Up to 5.0 in CBD/TOD | Aligned with state CGDCR |
| Gurugram (HBC 2017) | 1.45-1.75 (varies by zone) | 1.75-3.5 | Floor-Area-Ratio + ground coverage limits |
| NOIDA (UP) | 2.75-3.5 (group housing) | 4.0 (mixed-use) | NOIDA Building Regulations 2010 + amendments |
Indian DCRs typically also limit:
NBC 2016 Part 4 Table 7:
| Occupancy | Without Sprinkler (m) | With Sprinkler (m) |
|---|---|---|
| Group A Residential | 22.5 | 30.0 |
| Group B Educational | 22.5 | 30.0 |
| Group C Institutional | 22.5 (limited single-storey) | 30.0 |
| Group D Assembly | 22.5 (max with smoke detection) | 30.0 |
| Group E Business | 30.0 | 45.0 |
| Group F Mercantile | 22.5 | 37.5 |
| Group G Industrial | varies by hazard | varies |
| Group H Storage | varies | varies |
| Group I Hazardous | 18.0 | 22.5 |
(Cross-reference: IBC 2024 allows 76.2 m for sprinklered business. India is significantly more restrictive.)
NBC 2016 Part 4 Table 22:
| Building Type / Height | Required Fire Rating |
|---|---|
| Non-high-rise, non-special | 2-hour structural, 2-hour compartment walls |
| High-rise residential (15-45 m) | 2-hour |
| High-rise residential (>45 m) | 3-hour |
| High-rise non-residential (18-45 m) | 2-hour |
| High-rise non-residential (>45 m) | 3-hour |
| Special buildings | 4-hour (large assemblies, hospitals) |
| Basement (>= 2 levels) | 4-hour external; sprinklered |
Compartment size limits: maximum 750 sqm per compartment in basement; 2,000 sqm above grade for office (E); 1,500 sqm assembly (D); 1,000 sqm hospital (C).
Sprinkler systems are designed per IS 15105:2002 (sprinklers) + TAC (Tariff Advisory Committee) Rules for fire insurance purposes. NFPA 13 is sometimes referenced for fire engineering.
The Energy Conservation Building Code 2017 (BEE, MoP) applies to:
It applies to all new commercial buildings in 21 states that have adopted (as of 2025). Aimed at 25-50% reduction over base case.
Three compliance levels:
| Level | Energy Savings vs Base | Mark |
|---|---|---|
| ECBC | 25% | ECBC-compliant |
| ECBC+ | 35% | ECBC+ |
| SuperECBC | 50% | SuperECBC |
Five Climate Zones (ECBC 2017 + IS 3792:1978):
| Zone | HDD (base 21C) + CDH (base 25C) | Cities |
|---|---|---|
| Hot-Dry | CDH > 6000 K-h, HDD low | Ahmedabad, Jaipur, Nagpur, Jodhpur |
| Warm-Humid | High humidity (>= 75%), CDH > 6000 | Mumbai, Chennai, Kolkata, Goa, Vizag |
| Composite | Mixed extremes | Delhi, Lucknow, Kanpur, Allahabad |
| Temperate | Moderate temperatures year-round | Bangalore, Pune, Hyderabad (margin), Coimbatore |
| Cold | HDD > 3000 | Shimla, Srinagar, Leh, Gangtok, Darjeeling |
ECBC 2017 prescriptive U-value targets (W/m2K):
| Element | Hot-Dry | Warm-Humid | Composite | Temperate | Cold |
|---|---|---|---|---|---|
| Roof (24-hr use) | 0.33 | 0.33 | 0.33 | 0.33 | 0.33 |
| Wall (24-hr use) | 0.40 | 0.40 | 0.40 | 0.40 | 0.40 |
| Wall (daytime use) | 0.85 | 0.85 | 0.85 | 0.85 | 0.55 |
| Glass U-factor (max) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 |
| Glass SHGC (max, WWR <= 40%) | 0.27 | 0.27 | 0.27 | 0.27 | 0.62 (heating) |
(ECBC+ and SuperECBC tighten these. Cold zone allows higher SHGC for solar heating.)
Applies to residential buildings. Two parts:
RETV targets:
| Climate Zone | RETV Limit (W/m2) |
|---|---|
| Composite | 15 |
| Hot-Dry | 15 |
| Warm-Humid | 15 |
| Temperate | 15 |
| Cold | -- (U-thermal transmittance limit instead: Uroof <= 1.2, Uwall <= 1.8) |
| System | Operator | Building Types | Levels |
|---|---|---|---|
| GRIHA (Green Rating for Integrated Habitat Assessment) | TERI + MNRE | New construction, large built-up | 1-5 star |
| GRIHA SVA Griha | Same | Small homes (<= 2,500 sqm) | -- |
| GRIHA EB | Same | Existing buildings | -- |
| IGBC LEED India | CII Indian Green Building Council | All types | Certified / Silver / Gold / Platinum |
| IGBC Green New Buildings | Same | India-specific frame | Same |
| EDGE | IFC (World Bank) | Affordable / SME | Certified / Advanced / Zero Carbon |
| LEED v4.1 | USGBC (international) | All | Certified / Silver / Gold / Platinum |
GRIHA is mandatory for all CPWD (Central Public Works Department) projects since 2014. Many State PWDs follow.
| Element | Required Dimension |
|---|---|
| Accessible route width | 1.2 m clear (1.5 m preferred); passing space at 60 m intervals |
| Door clear width | 900 mm minimum (entrance); 850 mm internal |
| Ramp gradient | Max 1:12 for 760 mm rise; 1:15 preferred; 1:20 for tactile contrast required |
| Ramp landing | 1.5 x 1.5 m at top/bottom; intermediate at every 9.0 m horizontal |
| Lift cabin | Minimum 1100 mm wide x 1300 mm deep (one wheelchair + attendant); for hospitals 1100 x 2100 mm (stretcher access) |
| Lift door | 900 mm clear |
| Accessible WC | 1.5 m x 2.2 m minimum; 1.5 m turning circle; grab rails at 850 mm AFL |
| Accessible parking | 3.6 m x 4.8 m + 1.2 m access aisle |
| Signage | Tactile + Braille; high contrast (>= 70% LRV difference); height 1.2-1.6 m for reading |
| Tactile flooring | At all level changes, doorways, ramps, stair edges, lift entries |
| Counter height | 800 mm max for accessible service counters |
| Type | Reference Standard |
|---|---|
| Dead loads | IS 875 (Part 1):1987 |
| Imposed loads | IS 875 (Part 2):1987 |
| Wind loads | IS 875 (Part 3):2015 -- 6 wind zones (33-55 m/s basic wind speed) |
| Snow loads | IS 875 (Part 4):1987 -- limited applicability |
| Special loads (impact, vibration etc.) | IS 875 (Part 5):1987 |
| Seismic | IS 1893 (Part 1):2016 |
| Load combinations | IS 875 Pt 5 + IS 1893; aligned to limit state |
| Zone | Zone Factor Z | Intensity (MMVI/MSK) | Cities |
|---|---|---|---|
| II | 0.10 | VI | Bangalore, Hyderabad, Chennai (margin), Pune, Mumbai, Trivandrum |
| III | 0.16 | VII | Mumbai (Greater), Kolkata, Lucknow, Bhubaneswar, Ahmedabad, Surat, Jaipur |
| IV | 0.24 | VIII | Delhi, Jammu, Patna, Dehradun, Faridabad, Chandigarh |
| V | 0.36 | IX or more | Srinagar, Guwahati, Shillong, Aizawl, Imphal, Port Blair, Kutch (Bhuj), Sikkim |
Ductile detailing (IS 13920:2016) mandatory for all buildings in Zone III, IV, V and important structures in II.
| Wind Zone | Basic Wind Speed Vb (m/s, 50-year return) | Cities |
|---|---|---|
| Zone 1 | 33 | Trivandrum, Bangalore, Hyderabad |
| Zone 2 | 39 | Pune, Mumbai (inland), Chennai (margin) |
| Zone 3 | 44 | Mumbai (coastal), Kolkata, Delhi (margin) |
| Zone 4 | 47 | Bhubaneswar, Visakhapatnam |
| Zone 5 | 50 | Most coastal Tamil Nadu, Andhra coast |
| Zone 6 | 55 | Cyclone-prone Odisha, AP coast, Bay of Bengal islands |
| Material | Code |
|---|---|
| Plain & Reinforced Concrete | IS 456:2000 (under revision; draft IS 456:2024) |
| Working stress concrete (where used) | IS 456 Annex N |
| High-performance concrete | IS 456 + IS 1199 + special provisions |
| Pre-stressed concrete | IS 1343:2012 |
| Steel general | IS 800:2007 (limit state) |
| Cold-formed steel | IS 801:1975 + IS 811:1987 |
| Composite | IS 11384:1985 |
| Timber | IS 883:2016 + IS 4983 |
| Masonry | IS 1905:1987 |
| Foundations | IS 1904:1986 (general), IS 6403 (allowable bearing), IS 2950 (raft), IS 2911 (piles, 4 parts) |
| Aluminium | IS 8147 |
| Glass | IS 16231 (4 parts) |
| Curtain Wall | IS 17277:2019 |
For projects within 500 m of high tide line:
| Threshold | Category | Authority |
|---|---|---|
| Built-up >= 20,000 sqm AND <1,50,000 sqm | B2 | State EIA Authority (SEIAA) |
| Built-up >= 1,50,000 sqm | A | MoEFCC (Central) via EAC |
| Township projects >= 50 hectare OR >= 1,50,000 sqm built-up | A | MoEFCC |
Required: Form 1, Form 1A, Conceptual Plan, baseline studies, EIA report (Category A only with public hearing), EMP, EC validity 7 years.
Online portal (nocas2.aai.aero). Required if building exceeds height limits computed from distance to nearest aerodrome:
Height limits use a conical surface (slope varies by airport).
| Parameter | Value | Source |
|---|---|---|
| Floor-to-floor height residential (standard) | 3.0 m | NBC Part 4 4.7.3.1 (min 2.75 m clear) |
| Floor-to-floor height office | 3.6 m | ECBC + NBC; min 2.75 m clear |
| Minimum room size (habitable, residential) | 9.5 sqm (single occupancy); 13.93 sqm (family room) | NBC Part 3 4.2 |
| Minimum kitchen size | 5.5 sqm | NBC Part 3 4.2.5 |
| Minimum bathroom | 1.8 sqm with min dim 1.2 m | NBC Part 3 4.2.5 |
| Minimum balcony depth | 0.9 m (varies by state DCR) | Local DCR |
| Corridor width residential | 1.0 m (1.2 m for high-rise) | NBC Part 4 4.4.3 |
| Corridor width hospital | 2.4 m | NBC Part 4 + FGI-derived |
| Corridor width office | 1.5 m | NBC Part 4 |
| Stair width residential (high-rise) | 1.5 m | NBC Part 4 4.4.3 + 4.5 |
| Stair width hospital | 2.0 m | NBC Part 4 |
| Tread/riser comfort | 250 mm tread; 175 mm riser (residential); 300/150 institutional | NBC Part 4 4.4.3 |
| Lift capacity (residential, basic) | 6-person (408 kg) | NBC Part 8 Sec 6 |
| Lift capacity (high-rise residential) | 13-person (884 kg) + fire lift 545 kg | Same |
| Parking ECS (Equivalent Car Space) | 25 sqm (covered including drive); 23 sqm uncovered + 5 sqm circulation | State DCR (varies) |
| Two-wheeler parking | 1.5 sqm per | NBC + local DCR |
| Bicycle parking (TOD) | Per local DCR; Mumbai DCPR mandates 1 per 100 sqm GFA |
When advising on a project in India:
Cross-references within this plugin: load building-codes for IBC comparison; fire-life-safety for general egress principles; building-sustainability for LEED/Passive House comparison; structural-systems for material-system selection within IS framework; building-envelope for envelope detailing in Indian climate zones.