界面已本地化;技能介绍与说明文档按所选语言由 AI 自动翻译,代码、命令、路径和专业术语保留原文,以原作者文档为准。
探索技能
开发与工程 · SKILL.md

value-at-risk-calculator

value-at-risk-calculator

【开发与工程】Value at Risk (VaR) and related risk metrics calculation skill for financial and operational risk assessment

独立 GitHub 快照 · 自动分类 · 以原作者文档为准

技能说明

GitHub

name: value-at-risk-calculator description: Value at Risk (VaR) and related risk metrics calculation skill for financial and operational risk assessment allowed-tools:

  • Read
  • Write
  • Glob
  • Grep
  • Bash metadata: specialization: decision-intelligence domain: business category: risk priority: medium tools-libraries:
    • scipy.stats
    • numpy
    • arch
    • riskfolio-lib graph: domains: [domain:business-intelligence] skillAreas: [skill-area:quantitative-modeling, skill-area:financial-risk-modeling, skill-area:statistical-analysis] roles: [role:quantitative-analyst, role:risk-analyst, role:financial-analyst]

Value at Risk Calculator

Overview

The Value at Risk Calculator skill provides comprehensive capabilities for calculating VaR and related risk metrics using multiple methodologies. It supports financial risk assessment, operational risk quantification, and regulatory compliance through parametric, historical, and simulation-based approaches.

Capabilities

  • Historical simulation VaR
  • Parametric VaR (variance-covariance)
  • Monte Carlo VaR
  • Conditional VaR (CVaR/Expected Shortfall)
  • Incremental and component VaR
  • Stress testing
  • Backtesting and validation
  • Regulatory reporting support

Used By Processes

  • Monte Carlo Simulation for Decision Support
  • Risk Assessment
  • Decision Quality Assessment

Usage

Historical Simulation VaR

# Historical VaR configuration
historical_var_config = {
    "method": "historical_simulation",
    "data": {
        "returns": portfolio_returns,  # historical return series
        "period": "daily",
        "history_length": 252  # 1 year of trading days
    },
    "confidence_levels": [0.95, 0.99],
    "holding_period": 1,  # days
    "options": {
        "age_weighting": {
            "enabled": True,
            "decay_factor": 0.97
        }
    }
}

Parametric VaR

# Parametric (variance-covariance) VaR
parametric_var_config = {
    "method": "parametric",
    "portfolio": {
        "positions": {
            "Asset_A": {"value": 1000000, "weight": 0.4},
            "Asset_B": {"value": 750000, "weight": 0.3},
            "Asset_C": {"value": 750000, "weight": 0.3}
        }
    },
    "parameters": {
        "volatilities": {"Asset_A": 0.20, "Asset_B": 0.15, "Asset_C": 0.25},
        "correlation_matrix": [
            [1.0, 0.3, 0.2],
            [0.3, 1.0, 0.5],
            [0.2, 0.5, 1.0]
        ]
    },
    "confidence_level": 0.99,
    "holding_period": 10  # days
}

Monte Carlo VaR

# Monte Carlo VaR configuration
monte_carlo_var_config = {
    "method": "monte_carlo",
    "simulations": 100000,
    "model": {
        "type": "geometric_brownian_motion",
        "parameters": {
            "drift": "historical",
            "volatility": "garch"
        }
    },
    "portfolio_valuation": "full_revaluation",
    "confidence_levels": [0.95, 0.99],
    "holding_period": 10
}

Conditional VaR (Expected Shortfall)

CVaR represents the expected loss given that VaR is exceeded:

  • CVaR at 95% = Average loss in worst 5% of scenarios
  • Required by Basel III/IV for market risk capital
  • More coherent risk measure than VaR

Stress Testing

# Stress test scenarios
stress_tests = {
    "scenarios": [
        {
            "name": "2008 Financial Crisis",
            "shocks": {"equity": -0.40, "credit_spreads": 0.03, "rates": -0.02}
        },
        {
            "name": "COVID-19 March 2020",
            "shocks": {"equity": -0.30, "volatility": 0.50, "credit_spreads": 0.02}
        },
        {
            "name": "Interest Rate Spike",
            "shocks": {"rates": 0.03, "equity": -0.15}
        }
    ],
    "output": ["portfolio_loss", "position_contributions"]
}

Input Schema

{
  "method": "historical|parametric|monte_carlo",
  "portfolio": {
    "positions": "object",
    "total_value": "number"
  },
  "data": {
    "returns": "array or path",
    "period": "string"
  },
  "parameters": {
    "confidence_levels": ["number"],
    "holding_period": "number",
    "volatility_model": "string"
  },
  "stress_testing": {
    "scenarios": ["object"]
  },
  "backtesting": {
    "enabled": "boolean",
    "test_period": "string"
  }
}

Output Schema

{
  "var_results": {
    "confidence_level": {
      "VaR": "number",
      "VaR_percent": "number",
      "CVaR": "number",
      "CVaR_percent": "number"
    }
  },
  "component_var": {
    "position": {
      "marginal_var": "number",
      "component_var": "number",
      "contribution_percent": "number"
    }
  },
  "stress_test_results": {
    "scenario_name": {
      "portfolio_loss": "number",
      "loss_percent": "number"
    }
  },
  "backtesting": {
    "exceptions": "number",
    "exception_rate": "number",
    "traffic_light": "green|yellow|red",
    "kupiec_test": "object",
    "christoffersen_test": "object"
  },
  "risk_attribution": "object"
}

Best Practices

  1. Use multiple methods and compare results
  2. Validate with backtesting regularly
  3. Include fat tails (t-distribution or historical for parametric)
  4. Update parameters (volatility, correlations) frequently
  5. Complement VaR with stress testing
  6. Report CVaR alongside VaR for tail risk
  7. Document all assumptions and limitations

VaR Interpretation

MetricMeaning
VaR 95% = $1M95% confident loss won't exceed $1M
CVaR 95% = $1.5MIf loss exceeds VaR, average loss is $1.5M
Incremental VaRChange in portfolio VaR from adding position
Component VaRPosition's contribution to total VaR

Backtesting Standards

Exceptions (250 days)ZoneInterpretation
0-4GreenModel is acceptable
5-9YellowModel may have issues
10+RedModel needs review

Integration Points

  • Receives simulations from Monte Carlo Engine
  • Connects with Risk Register Manager for risk assessment
  • Supports Risk Analyst agent
  • Integrates with Decision Visualization for risk charts
我的收藏