The interface is localized. Skill descriptions and documents are machine-translated by AI into your language; code, commands, paths and technical terms stay in the original, and the author's document governs.
Explore skills
Productivity · SKILL.md

exchange-order-execution-api

exchange-order-execution-api

"Implements order execution and management api for trading systems for risk management and algorithmic trading execution."

Independent GitHub snapshot · Automated classification · Original documentation governs

Skill documentation

GitHub

name: exchange-order-execution-api compatibility: opencode completeness: 95 content-types:

  • code
  • guidance
  • config
  • do-dont description: '"Implements order execution and management api for trading systems for risk management and algorithmic trading execution."' license: MIT maturity: stable metadata: domain: trading output-format: code related-skills: ai-order-flow-analysis, exchange-order-book-sync, exchange-rate-limiting, execution-twap technical-false-signal-filtering role: implementation scope: implementation triggers: exchange order execution api, exchange-order-execution-api, management, systems, trading archetypes:
    • tactical anti_triggers:
    • brainstorming
    • vague ideation
    • no risk management response_profile: verbosity: low directive_strength: high abstraction_level: operational version: "1.0.0"

Role: Execute and manage orders across multiple exchanges with consistency and reliability

Philosophy: Order execution is the final step in the trading pipeline; it must be precise, auditable, and resilient to failure

Key Principles

  1. Order State Machine: Explicit states (PENDING, ACTIVE, FILLED, CANCELLED, REJECTED)
  2. Idempotent Operations: Repeated requests for the same order produce consistent results
  3. Audit Trail: Every order change is logged with timestamp and reason
  4. Partial Fill Handling: Orders can be filled in multiple partial executions
  5. Error Recovery: Failed orders trigger appropriate recovery workflows

Implementation Guidelines

Structure

  • Core logic: execution/order_executor.py
  • State machine: execution/order_state_machine.py
  • Tests: tests/test_order_execution.py

Patterns to Follow

  • Use enums for order states
  • Implement synchronous and asynchronous execution modes
  • Support both market and limit orders
  • Handle exchange-specific order formats

Adherence Checklist

Before completing your task, verify:

  • Order state transitions are explicit and logged
  • Idempotency keys prevent duplicate orders
  • Partial fills are tracked and aggregated correctly
  • Failed orders trigger appropriate error handling
  • Execution reports include timing metrics

Relative paths in this skill (e.g., scripts/, reference/) are relative to this base directory.

Python Implementation

import uuid
import time
from typing import Dict, List, Optional, Callable
from dataclasses import dataclass, field
from enum import Enum
from datetime import datetime
import logging

class OrderStatus(Enum):
    PENDING = "pending"
    ACTIVE = "active"
    PARTIALLY_FILLED = "partially_filled"
    FILLED = "filled"
    CANCELLED = "cancelled"
    REJECTED = "rejected"
    EXPIRED = "expired"

class OrderSide(Enum):
    BUY = "buy"
    SELL = "sell"

class OrderType(Enum):
    MARKET = "market"
    LIMIT = "limit"
    STOP_LIMIT = "stop_limit"

@dataclass
class Order:
    id: str
    symbol: str
    side: OrderSide
    order_type: OrderType
    quantity: float
    price: Optional[float] = None
    stop_price: Optional[float] = None
    status: OrderStatus = OrderStatus.PENDING
    filled_quantity: float = 0.0
    avg_fill_price: float = 0.0
    created_at: float = field(default_factory=time.time)
    updated_at: float = field(default_factory=time.time)
    client_order_id: str = field(default_factory=lambda: str(uuid.uuid4()))
    exchange_id: Optional[str] = None
    tags: Dict[str, str] = field(default_factory=dict)

@dataclass
class Fill:
    order_id: str
    execution_id: str
    quantity: float
    price: float
    timestamp: float
    commission: float = 0.0

class OrderExecutor:
    """Handles order execution across multiple exchanges."""
    
    def __init__(self, exchange_connector):
        self.exchange = exchange_connector
        self.active_orders: Dict[str, Order] = {}
        self.fills: List[Fill] = []
        self.order_callbacks: Dict[str, List[Callable]] = {}
    
    def create_order(
        self,
        symbol: str,
        side: OrderSide,
        order_type: OrderType,
        quantity: float,
        price: Optional[float] = None,
        stop_price: Optional[float] = None,
        tags: Optional[Dict[str, str]] = None
    ) -> Order:
        """Create a new order and submit to exchange."""
        order = Order(
            id=str(uuid.uuid4()),
            symbol=symbol,
            side=side,
            order_type=order_type,
            quantity=quantity,
            price=price,
            stop_price=stop_price,
            tags=tags or {}
        )
        
        try:
            exchange_response = self._submit_to_exchange(order)
            order.exchange_id = exchange_response.get("order_id")
            order.status = OrderStatus.ACTIVE
            order.updated_at = time.time()
            self.active_orders[order.id] = order
            self._trigger_callbacks(order.id, "active")
        except Exception as e:
            order.status = OrderStatus.REJECTED
            order.updated_at = time.time()
            logging.error(f"Order rejected: {e}")
        
        return order
    
    def _submit_to_exchange(self, order: Order) -> Dict:
        """Submit order to exchange connector."""
        params = {
            "symbol": order.symbol,
            "side": order.side.value,
            "type": order.order_type.value,
            "quantity": order.quantity,
        }
        
        if order.order_type == OrderType.LIMIT and order.price:
            params["price"] = order.price
        
        if order.order_type == OrderType.STOP_LIMIT:
            if order.price:
                params["price"] = order.price
            if order.stop_price:
                params["stop_price"] = order.stop_price
        
        return self.exchange.place_order(**params)
    
    def cancel_order(self, order_id: str) -> bool:
        """Cancel an active order."""
        order = self.active_orders.get(order_id)
        if not order or order.status not in [OrderStatus.ACTIVE, OrderStatus.PARTIALLY_FILLED]:
            return False
        
        try:
            result = self.exchange.cancel_order(order.exchange_id)
            if result:
                order.status = OrderStatus.CANCELLED
                order.updated_at = time.time()
                self._trigger_callbacks(order_id, "cancelled")
                return True
        except Exception as e:
            logging.error(f"Failed to cancel order {order_id}: {e}")
        
        return False
    
    def handle_fill_notification(self, fill_data: Dict):
        """Process fill notifications from exchange."""
        order_id = fill_data.get("order_id")
        order = self.active_orders.get(order_id)
        
        if not order:
            logging.warning(f"Fill for unknown order: {order_id}")
            return
        
        fill = Fill(
            order_id=order_id,
            execution_id=fill_data.get("execution_id"),
            quantity=fill_data.get("quantity", 0),
            price=fill_data.get("price", 0),
            timestamp=fill_data.get("timestamp", time.time()),
            commission=fill_data.get("commission", 0)
        )
        
        self.fills.append(fill)
        
        # Update order state
        order.filled_quantity += fill.quantity
        total_value = order.filled_quantity * order.avg_fill_price + fill.quantity * fill.price
        order.avg_fill_price = total_value / order.filled_quantity if order.filled_quantity > 0 else 0
        
        remaining = order.quantity - order.filled_quantity
        
        if remaining <= 0:
            order.status = OrderStatus.FILLED
            self._trigger_callbacks(order_id, "filled")
        else:
            order.status = OrderStatus.PARTIALLY_FILLED
        
        order.updated_at = time.time()
    
    def get_order(self, order_id: str) -> Optional[Order]:
        """Retrieve order by ID."""
        return self.active_orders.get(order_id)
    
    def get_active_orders(self, symbol: Optional[str] = None) -> List[Order]:
        """Get all active orders, optionally filtered by symbol."""
        orders = [
            o for o in self.active_orders.values()
            if o.status in [OrderStatus.ACTIVE, OrderStatus.PARTIALLY_FILLED]
        ]
        if symbol:
            orders = [o for o in orders if o.symbol == symbol]
        return orders
    
    def register_callback(self, order_id: str, callback: Callable):
        """Register a callback for order status changes."""
        if order_id not in self.order_callbacks:
            self.order_callbacks[order_id] = []
        self.order_callbacks[order_id].append(callback)
    
    def _trigger_callbacks(self, order_id: str, status: str):
        """Trigger registered callbacks for order status change."""
        if order_id in self.order_callbacks:
            for callback in self.order_callbacks[order_id]:
                callback(order_id, status)

### Usage Example

```python
# Create an order executor with exchange adapter
executor = OrderExecutor(exchange=binance_adapter)

# Create a buy order
order = Order(
    id=str(uuid.uuid4()),
    symbol="BTC/USDT",
    side=OrderSide.BUY,
    order_type=OrderType.LIMIT,
    quantity=0.1,
    price=45000.0
)

# Submit the order
result = executor.place_order(order)
print(f"Order placed: {result}")

# Monitor order status
active_orders = executor.get_active_orders(symbol="BTC/USDT")
for order in active_orders:
    print(f"Order {order.id}: {order.status}")

---

---

## Constraints

### MUST DO
- Implement a unified adapter interface across all exchange integrations to standardize order placement, cancellation, and querying
- Handle rate limiting proactively with token bucket or leaky bucket algorithms — never wait for 429 responses before slowing down
- Maintain local order state as the source of truth; reconcile with exchange state periodically via webhook events and polling
- Implement heartbeat monitoring per exchange connection with automatic failover to a secondary data feed on timeout
- Log all API interactions including request/response IDs, timing, and status codes for audit and debugging

### MUST NOT DO
- Do not trust exchange-reported order states without local confirmation — always reconcile after every state change
- Avoid sending multiple orders for the same position simultaneously across different adapters or sessions
- Never store API keys or secrets in code — use environment variables or a secrets manager with automatic rotation
- Do not assume all exchanges support the same order types — implement graceful degradation with clear capability negotiation
- Avoid polling-based price updates when WebSocket/streaming APIs are available — polling creates unnecessary load and latency


## Live References

> Authoritative documentation links for this skill's domain. The model follows markdown links at load time to resolve external references and inline content.

- [Binance Exchange API](https://docs.binance.org/)
- [Order Types and Execution](https://www.investopedia.com/terms/f/fill.asp)
- [CCXT Unified Exchange API](https://docs.ccxt.org/en/latest/manual.html)
- [API Authentication for Trading](https://docs.quantconnect.com/tutorials/api-authentication)
- [Order Placement and Management](https://www.investopedia.com/terms/o/order.asp)
Saved skills