The interface is localized. Skill descriptions and documents are machine-translated by AI into your language; code, commands, paths and technical terms stay in the original, and the author's document governs.
Explore skills
Development · SKILL.md

pr-feedback-quality-gate

pr-feedback-quality-gate

Safely track pull request feedback, resolve review comments or merge conflicts, validate fixes, and use a read-only cross-review before committing or pushing follow-up changes.

Independent GitHub snapshot · Automated classification · Original documentation governs

Nnexu-io / open-designApache-2.0

Skill documentation

GitHub

name: pr-feedback-quality-gate description: | Safely track pull request feedback, resolve review comments or merge conflicts, validate fixes, and use a read-only cross-review before committing or pushing follow-up changes. triggers:

  • "PR feedback"
  • "review comments"
  • "merge conflicts"
  • "cross-review"
  • "Claude CLI review"
  • "monitor PR" od: mode: utility

PR Feedback Quality Gate

Use this when a PR has review feedback, merge conflicts, pending checks, or needs a monitored follow-up after a fix.

Workflow

  1. Inspect PR state first: comments, reviews, mergeability, checks, branch, and local worktree status. Keep unrelated local changes out of the PR.
  2. Use an isolated worktree for review fixes or conflict resolution when the main checkout is dirty, behind remote, or being used by another agent.
  3. Make the smallest safe fix. Preserve the original bug invariant and any newer upstream structure introduced by main.
  4. Run the narrow validation first, then the repository-required gates. For this repo, include pnpm guard; add package typechecks/builds/tests when touched files require them.
  5. Before commit or push, run a read-only cross-review of the staged or proposed diff. Forbid file edits and git write or coordination commands.
  6. Treat cross-review as evidence, not authority. Accept only findings grounded in the diff, repository rules, user goal, or validation results. Downgrade or reject style preferences, broad scope expansion, and suggestions that conflict with safety or ownership boundaries; record the reason briefly.
  7. If accepted blockers remain, fix them, rerun validation, and repeat the review. Commit and push only after validation passes and there are no accepted blockers.

Monitoring cadence

  • Active review or failing checks: check often enough to unblock quickly.
  • Clean or approved PR waiting for merge: check about every 12 hours.
  • Merged PR: reduce to daily lightweight observation for CI, release, or regression signals, and stop making code changes unless asked.

Report

Always report PR state, actions taken, cross-review verdict, accepted or rejected findings, validation run, commits pushed, skipped checks with reasons, remaining risks, and next step.

Saved skills