name: regression-test-plan
description: "Design and prioritize a regression test suite so changes don't break what worked. Use when asked to plan regression testing, build a regression suite, decide what to re-test after a change, or trim a bloated regression pack. Produces a risk-based regression plan — what to re-test and why, prioritised tiers (smoke → full), automation candidates, and a run strategy per release — so coverage matches risk and the suite stays fast."
Regression Test Plan Skill
Regression testing protects what already works — but re-running everything every time is slow and wasteful, and
testing too little ships breakage. The answer is risk-based: re-test what changed, what it touches, and what
hurts most if it breaks. This skill builds that prioritised plan and a run strategy, so coverage tracks risk and
the suite doesn't balloon.
Working from a brief
Given "we're shipping a checkout change, what should we regression-test?", produce the plan anyway — infer
the impacted areas and a sensible prioritisation, labelling assumptions. Tie scope to change-impact and risk.
Never hand back a question instead of a plan.
Required Inputs
Ask for these only if they aren't already provided (else infer and label):
- The change — what's being released/modified, and what it touches (and integrates with).
- Critical paths — the flows that must never break (revenue, auth, data integrity).
- Existing coverage — current regression cases/automation, if any, and how long a full run takes.
- Constraints — time/resources per release, and manual vs. automated capacity.
Output Format
Regression Plan: [release/change]
1. Impact analysis — what changed, the areas directly and indirectly affected, and the high-risk zones (shared components, recent bugs, complex logic).
2. Prioritised scope — what to re-test, in tiers:
| Tier | When to run | Scope | Why |
|---|
| Smoke / sanity | every build | critical paths only (login, checkout, save) | fast fail |
| Targeted | this change | the changed area + its direct dependencies | change-impact |
| Full regression | major release / risky change | broad core coverage | safety net |
3. What to skip (and the risk) — explicitly de-scope low-risk, unchanged areas, and name the residual risk.
4. Automation candidates — which cases are stable, high-value, and repetitive enough to automate first (and which to keep manual).
5. Run strategy — when each tier runs (per-commit / per-release), order (critical first), and the entry/exit criteria for sign-off.
Quality Checks
Anti-Patterns
Based On
Risk-based regression practice — change-impact analysis, tiered smoke/targeted/full suites, automation prioritisation, and release-fit run strategy.
Example Trigger Phrases
- "Plan regression testing."
- "Build a regression suite."
- "Decide what to re-test after a change."
- "Trim a bloated regression pack."