name: growth-experiment-backlog
description: "Build and prioritise a growth experiment backlog. Use when asked to plan growth experiments, prioritise growth ideas, set up a test backlog, or run a growth process/sprint. Produces a prioritised backlog — each experiment as a hypothesis with the metric it moves, an ICE/PXL score, the minimum test design, and a definition of done; plus the cadence to run it."
Growth Experiment Backlog Skill
Growth is a rate of learning, not a list of ideas. This skill turns a pile of "we should try…" into a
prioritised backlog of falsifiable experiments — each tied to a metric, scored for impact and effort,
and shaped as the smallest test that could prove it — so the team ships learning every week, not opinions.
Required Inputs
Ask for these only if they aren't already provided:
- The metric to move — the one growth metric this cycle (activation, conversion, retention, referral).
- The funnel stage / leak — where the opportunity is (pair with
marketing-funnel-plan).
- Raw ideas — any experiment ideas already on the table.
- Constraints — eng/design bandwidth and traffic volume (which caps how many tests can reach significance).
Output Format
Growth Backlog: [metric this cycle]
1. Focus — the one metric and the funnel stage, with the current baseline. A backlog without a focus metric is just a wish list.
2. Backlog table — every idea as a hypothesis, scored and sortable:
| # | Hypothesis ("If we ___, then [metric] will ___ because ___") | Stage | Impact | Confidence | Ease | ICE | Status |
|---|
(Use ICE (1–10 each) or PXL for less gameable scoring. Sort by score; the top few are this cycle's tests.)
3. Test designs (top 3) — for each top experiment: the exact change, the primary metric + guardrail metrics, the variant(s), the sample size/duration to detect the expected effect, and the definition of done (ship / iterate / kill).
4. Cadence — the weekly rhythm: pick → build → run → read → decide → document the learning back into the backlog (winners and losers both teach).
Quality Checks
Anti-Patterns
Based On
Growth-process practice — ICE/PXL prioritisation, hypothesis-driven experiments, and the build–measure–learn cadence.
Example Trigger Phrases
- "Plan growth experiments."
- "Prioritise growth ideas."
- "Set up a test backlog."
- "Run a growth process/sprint."