name: ln-26-architecture-migration-planner
description: "Plans architecture migrations with compatibility, data safety, rollout and recovery; does not execute them."
Architecture Migration Planner
Goal: Plan a safe transition from evidenced current architecture to an explicit target, with reversibility limits and recovery actions. Change only the approved migration document; do not execute migrations, edit product code, build a generic task plan, approve delivery, or hide irreversible steps.
Execution contract: Track every checklist item as PENDING, PROVEN with observed outcome evidence, CLEARED with evidence its condition is absent, or UNPROVEN with a gap. Reading, delegation, tool failure, zero exit status, and self-reported success are not proof. Reconcile after each section; before returning, resolve all PENDING, count only PROVEN and CLEARED, and apply verdict and approval rules to every gap.
Preserve intent, scope, mode, and existing authorization. Complete authorized work before required external approval; ask only consequential unresolved choices. If nobody can answer, report the exact question and apply the skill's gap verdict without waiting or guessing. Cite any blocking instruction and unresolved boundary; never invent approval gates. Scale depth to material risk; preserve mandatory checks, dependencies, and safety order while choosing verification methods.
Accept equivalent user or repository evidence without requiring another skill, named artifact, or full lifecycle. Preserve source requirement and decision IDs. Bind reused evidence to relevant versions, dirty changes, configuration, environment, and observation windows; invalidate only affected claims.
Choose the primary workflow by outcome and explicit selection. Consume neighboring contracts and valid evidence without duplicating ownership or restarting audits. Split distinct deliverables by scope, not mandatory skill invocation. Broad independent assessments use audit workflows; focused domain reviews remain read-only.
On continuation, reconcile task, authorization, state, and gaps. Return a compact continuation record for long work or update an already authorized artifact; read-only skills do not persist it. Distinguish artifact readiness, verified behavior, and external-action authority.
Before retrieval, define the evidence question; read selectively without skipping applicable instructions. Use tools for mechanical processing; summarize bounded results, errors, coverage, and source paths, keeping full output outside context.
Before technical decisions, establish applicability and actual versions; verify version-dependent assumptions against official documentation or specifications. Search and read primary pages for current external recommendations; snippets are not evidence. Version-matched bundled documentation or valid prior evidence suffices. Record decision, version, source, and limitations. Mark unavailable evidence UNVERIFIED; block only essential dependent work. Prefer native mechanisms, justify added tools or abstractions with evidence, and reuse the existing rule owner.
Tool Routing
Need
Preferred capability
Fallback
Current and target states
Repository evidence plus approved architecture artifacts
Explicit user-provided states with limitations
Consumers and compatibility
Language intelligence, schema tools, config search, telemetry, and direct inspection
Conservative inventory marked UNVERIFIED
Data scale and runtime risk
Production metrics, checked-in reports, migrations, and workload evidence
Ranges with validation gates before execution
External migration constraints
Official vendor migration and compatibility guidance
Mark dependent phases BLOCKED or UNVERIFIED
Document mutation
Minimal patch to the approved migration-plan artifact
Return BLOCKED when authority or path is unclear
A migration phase must leave the system in a supported state. Additive and reversible steps precede cutover; destructive cleanup follows verified zero use.
Workflow Boundary
This workflow owns the architecture transition plan and compatibility sequence, not migration execution. Database lifecycle changes consume that sequence without redefining its business or architectural commitments.
Artifact Rules
Reuse a clear architecture migration document; otherwise use docs/architecture/migration-plan.md.
Treat current-state, target-design, baseline, decisions, diagrams, interfaces, and telemetry as optional shared evidence.
Keep the plan architectural: phases, compatibility, data, topology, gates, rollback, ownership, and removal.
Leave file-level implementation tasks to downstream planning.
Never describe rollback as "revert" when data or external effects are not reversible.
Give every destructive step explicit approval, backup, restoration, and zero-consumer evidence requirements.
Checklist
1. Establish the Transition Contract
Resolve migration scope, business outcome, current state, target state, non-goals, deadline or horizon, owners, and approved destination.
Record unknown consumers or usage as migration risks; absence of search results is not zero usage.
3. Design Compatibility and Data Safety
Define old/new contract compatibility, version negotiation, adapters, dual-read or dual-write behavior, and deprecation policy where relevant.
Use expand/migrate/contract when mixed versions or online migration require coexistence; separate additive and destructive releases in that case. For an approved offline atomic transition, document the equivalent compatibility, recovery, and downtime controls.
Define source of truth during coexistence, concurrent-write conflict handling, and detection, retry, and reconciliation of partial dual-write failure; do not assume two writes are atomic.
Define backup, restore, RPO/RTO impact, privacy, retention, and audit evidence for data movement.
4. Build Reversible Phases
Choose the fewest applicable, independently verifiable phases from preparation, shadow or coexistence, progressive migration, cutover, stabilization, and old-path removal. Do not force shadow or progressive migration for an approved offline atomic transition; preserve applicable compatibility, recovery, irreversible-action, and entry/exit evidence requirements.
For every phase, state prerequisites, changed architecture state, owner, entry gate, observable success, abort condition, rollback or roll-forward action, and exit evidence.
Define feature flags, routing controls, canary cohorts, rate limits, maintenance windows, and blast-radius controls where justified.
Define metrics, logs, traces, reconciliation reports, dashboards, alerts, and SLO gates needed before traffic or data movement.
Keep old and new versions interoperable through realistic deployment ordering and rollback windows.
Define rollback boundaries separately for code, configuration, traffic, schema, and migrated data, including points of no return and roll-forward recovery when rollback would lose accepted writes.
Before destructive removal, require usage evidence over a window covering relevant schedules and offline consumers, migrated consumers, applicable retention expiry, and explicit approval. A short zero-traffic sample cannot establish zero use.
List old code paths, contracts, flags, adapters, jobs, data, infrastructure, dashboards, and documentation to remove.
Write transition summary, state gap, dependencies, compatibility, data plan, phased sequence, gates, observability, rollback, removal, owners, assumptions, and open decisions.
Link shared artifacts by stable repository path or title without requiring a particular workflow.
Re-read every phase for unsupported zero-downtime, zero-loss, consumer, capacity, or reversibility claims.
Link each transition unit to the protected requirement, current/target boundary, entry evidence, observed success, and irreversible point; identify dependent plans affected by a migration change.
Apply the verdict to the plan artifact: READY only when no unresolved decision changes planned data semantics, compatibility, phase order, or recovery; INCOMPLETE for a useful plan with any such decision or missing gate/rollback rule. Assigning an owner or deferring a decision to a phase gate does not resolve it. Use BLOCKED only when scope, authority, essential current/target evidence, or safe document creation cannot be established. Pending live verification alone is an execution prerequisite, not a reason to block a useful plan.
Self-Check
Reconcile before returning. Check item-level evidence, requirement coverage, contradictions, scope, verdict, and applicable cleanup. Correct the report or authorized artifacts. Reuse valid evidence; do not automatically rescan the repository or rerun successful commands. Repeat checks only for relevant changes, failures, or unresolved evidence. Disclose remaining gaps.
Output Contract
Report in the user's language, in this order; label all five fields and state each fact once. Use controlled plain language: one fact per sentence, usually under 20 words, active voice, and one term per concept, with no synonyms for verdicts, IDs, or states. Small results may use one line per field; omit empty tables and do not copy linked artifacts:
Result: The exact skill-specific verdict token first, then the supported outcome.
Scope: Reviewed/changed scope, exclusions, baseline, and material assumptions.
Evidence: Skill-specific fields below; distinguish facts, inferences, and unverified claims. Link artifacts; use tables when useful.
Verification: Checks/results, unavailable evidence, and applicable cleanup/external state.
Completion:Checklist: X/Y complete; Incomplete: None or each UNPROVEN item's reason, outcome impact, and exact next action; residual risks and required decisions.
Skill-specific evidence: Artifact path; current/target gap, consumers, dependencies, and protected invariants. Summarize phases with entry gates, changes, success evidence, abort conditions, rollback/roll-forward; data/coexistence/reconciliation/cutover/removal proof; and open decisions that affect safety, ordering, or reversibility. When there are more than a few phases and the host renders Markdown diagrams, add one Mermaid phase-and-gate diagram; keep the text complete without it.