executing-plans
executing-plans
Use when executing an implementation plan in the current session as the implementer yourself — your human partner chose inline execution, or no subagent tool is available
imc-submissionUse when auditing an ACM IMC submission for HotCRP readiness, covering the paper-registration step, the acmart template with BBL upload, the full/short page limits, double-blind anonymity including vantage-point details, the mandatory Ethics section, the artifact-availability declaration, cycle choice, and desk-reject triage before the AoE cutoff.
Independent GitHub snapshot · Automated classification · Original documentation governs
Run this audit before uploading to the IMC HotCRP site. IMC — the ACM Internet Measurement
Conference, sponsored by ACM SIGCOMM — judges a submission on what it measured about the real
Internet and how, so the mechanics below are where good measurement work is needlessly lost.
Every number was read from the IMC 2026 call and submission instructions and the IMC 2025 call on
2026-07-09 via search renderings (see resources/official-source-map.md); treat them as a
one-cycle snapshot and reopen the live pages first.
IMC runs two deadlines a year (cycle 1 ~20 Nov 2025, cycle 2 ~29 Apr 2026). This is a real choice, not a formality:
acmart template, in the required review format, unmodified. This is the ACM path — do
not carry an IEEE two-column habit across from a sibling networking venue.IMC uses double-blind review: no author names or affiliations, no identifying grant numbers, and third-person references to your own prior work. Measurement papers leak identity in ways a generic checklist misses:
# Mechanical pass on the submission PDF
pdfinfo paper.pdf | grep -Ei 'author|creator|producer'
pdftotext paper.pdf - | grep -nEi 'github\.com/[a-z0-9-]+|zenodo\.org/record|acknowledg|grant|@[a-z0-9.]*\.edu' | head
The measurement-specific leaks: a vantage point or testbed that only your group operates, an AS number or probe hostname that names your institution, a RIPE Atlas measurement ID tied to your account, a released-dataset URL on a personal or lab domain, and acknowledgements to the operators who gave you access. Anonymize the infrastructure description, not just the byline.
IMC requires a clearly marked Ethics section or appendix; a paper without one may be rejected. This is not boilerplate:
Write this section early (see imc-experiments); ethics approvals cannot be retrofitted at the
deadline.
Every submission carries a declaration: full, partial, or no availability.
| Finding at audit time | Severity | Real fix |
|---|---|---|
| Body over the page limit / appendix smuggling decision-critical content | Desk-reject-grade | Cut or restructure; the body must be self-contained |
Template altered or wrong acmart format | Named desk-reject ground | Recompile clean; recover space editorially |
| Missing BBL upload | Processing failure | Generate and upload the BBL |
| Identity leak in PDF, dataset link, or vantage-point description | Anonymity violation | Re-anonymize infrastructure and links; scrub PDF metadata |
| No Ethics section | Named rejection ground | Add a real Ethics section; document IRB/disclosure |
| Human-subjects work without IRB documentation | Ethics failure | Obtain/attach the IRB determination |
| Not registered by the cycle's registration date | No submission slot | Nothing fixes this post-cutoff — calendar it now |
acmart variant.[IMC submission status] ready / blocked / needs work
[Cycle] deadline 1 / deadline 2, registered by the cutoff? yes/no
[Format] pages used (body/refs), acmart compliance, BBL uploaded?
[Anonymity] clean / leaks: <where, incl. vantage points>
[Ethics] section present? IRB/disclosure documented? yes/no
[Availability] declaration full/partial/none + justification if none
[Fix queue] <ordered, with owners and dates before the AoE cutoff>