brainstorming
brainstorming
You MUST use this before any creative work - creating features, building components, adding functionality, modifying behavior, or planning anything new, in software or out of it (a talk, a business, a renovation).
isca-workflowUse when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.
Independent GitHub snapshot · Automated classification · Original documentation governs
An ISCA year has one gate. Miss mid-November and the next identical opportunity is
twelve months away, which is why experienced groups treat the ISCA calendar as an
engineering schedule with the deadline as tape-out. This skill lays out that
schedule using the verified ISCA 2026 dates as the template; as of 2026-07-08 the
ISCA 2027 CFP was not yet posted, so every 2027 date below is an expectation to
confirm against iscaconf.org/isca2027/ the moment it exists (待核实).
| Milestone | ISCA 2026 date (verified) | What it means operationally |
|---|---|---|
| Abstract registration | November 10, 2025 | Title, abstract, authors, conflicts locked in HotCRP; paper content still fluid |
| Full paper | November 17, 2025 | The reviewed PDF — one week after abstracts, so the abstract week is a writing week, not a buffer |
| Round 1 reviews due | December 19, 2025 | First reviewer wave completes before the holidays |
| Round 2 reviews due | February 13, 2026 | Additional reviews on papers that advanced |
| Rebuttal + revision | February 16 - March 6, 2026 | Authors see reviews, respond, and may revise — a three-week working window |
| Conference | June 27 - July 1, 2026 (Raleigh, NC) | Presentation; artifact badges resolved before publication |
Industry-track submissions ran about a month behind (abstracts December 5, papers December 12, 2025). Final notification date for 2026 was not captured in this pack's verification — 待核实.
Count in weeks from the expected paper deadline (call it P, likely mid-November 2026 for ISCA 2027):
isca-topic-selection);
simulation or prototype infrastructure chosen and validated
(isca-experiments); the one-sentence claim written on the whiteboard.isca-submission, then freeze the artifact snapshot that
matches the submitted numbers (isca-reproducibility).Between November and mid-February the authors' only jobs are (a) keep the
evaluation environment resurrectable and (b) pre-build rebuttal ammunition: the
five most likely objections, each with a ready experiment or a pointer into the
submitted PDF. The 2026 cycle then opened a combined rebuttal/revision period
(February 16 - March 6) — unusually long by conference standards precisely because
ISCA lets authors change the paper, not just argue about it. Staff those three
weeks like a sprint: compute reserved, coauthors on call, no conference travel
booked. Details of what to do inside the window live in isca-author-response.
isca-camera-ready), voluntary artifact submission (isca-artifact-evaluation),
talk and travel for late June.isca-topic-selection honestly — the
committee may have told you the paper's true venue.Keep a single tracking file in the paper repo; every risk has one owner.
# isca-campaign.yaml
target: ISCA 2027 # 54th by arithmetic - ordinal 待核实
gate:
abstract: TBD-2026-11 # confirm on iscaconf.org/isca2027 when live
paper: TBD-2026-11
source: "not yet posted as of 2026-07-08"
owners:
claim_and_story: <name> # one sentence, defended weekly
simulation_infra: <name> # versions pinned, configs archived
baselines: <name> # frozen P-10w, independently reproduced
writing: <name> # draft complete P-4w
submission_admin: <name> # HotCRP, conflicts, template, metadata
rebuttal_reserve: <name> # compute + calendar hold, mid-Feb to early Mar
checks:
- abstract written for reviewer bidding, not filler
- artifact snapshot tagged at submission commit
- mock-PC read completed and objections filed
- fallback venue named with trigger condition
| When you are at... | Open... |
|---|---|
| Venue decision (P-16w) | isca-topic-selection, exemplars library |
| Infrastructure setup | isca-experiments, isca-reproducibility |
| Drafting (P-6w to P-1w) | isca-writing-style, isca-related-work, isca-supplementary |
| Upload week | isca-submission (twice: abstract step, paper step) |
| Winter wait | isca-review-process |
| February window | isca-author-response |
| Post-decision | isca-camera-ready, isca-artifact-evaluation, or the retarget branch |
All dates above are the 2026-cycle record
(../../resources/official-source-map.md, checked 2026-07-08). Confirm the 2027
calendar, page rules, and review mechanics on the official site before acting on
any of them.