Development Lifecycle
Overview
Every development task follows mandatory phases. No phase can be skipped. No work is "done" until all gates pass with evidence. This is a rigid process skill — follow it exactly.
The Lifecycle
PLAN → IMPLEMENT → TEST → SECURE → DOCUMENT → REVIEW → DONE
Every task passes through these phases. Small tasks may combine phases but never skip them.
Phase 1: PLAN
Gate: Plan exists before code is written.
| Task Size | Planning Requirement |
|---|
| Trivial (config change, typo fix) | Mental plan stated in response |
| Small (single file, clear approach) | Brief description of approach |
| Medium (multiple files, design choice) | Written plan (forge design doc or inline) |
| Large (architecture, multi-day) | Full design doc via forge, user-approved |
Evidence: The plan (or statement of approach) must exist in the conversation before any implementation begins.
Phase 2: IMPLEMENT
Gate: Code follows project conventions and skill guidance.
Before writing code:
- Check for applicable skills (forge step 4 — skill gap detection)
- Invoke domain skills for the work type
- Follow security patterns from relevant skills (never optional)
During implementation:
- One concern per commit
- Backup files before editing (per project rules)
- Respect session_control.md file locks
- Follow the coding patterns in loaded skills
Pre-Test Discovery
Before running tests, identify the project's test infrastructure:
- Check PROJECT.md ## Testing section -> use documented commands
- If not documented, scan:
- package.json scripts (test, test:unit, test:e2e, lint)
- pyproject.toml [tool.pytest], [tool.ruff], [tool.mypy]
- Makefile/Taskfile targets (test, lint, check)
- CI config (.github/workflows/, .gitlab-ci.yml, Jenkinsfile)
- Test directories (tests/, test/, tests/, spec/)
- Record the commands you'll use before running them
- If no test infrastructure found: note in evidence, suggest creating tests
Phase 3: TEST
Gate: Tests pass and output is shown.
Contract-Driven Sub-Phases (when a contract map exists)
For any WP whose component is tracked in progress/contract-map.yaml, Phase 3 is split into four sub-phases that correspond to the integration ledger's stages. Each sub-phase has its own gate and ledger transition. See ledger-mapping.yaml in this skill directory for the machine-readable SDLC-to-ledger contract.
| Sub-phase | Gate | Evidence | Ledger transition |
|---|
| 3a: SCAFFOLD | sample-data-scaffolding produced fixtures | tests/fixtures/<component>/manifest.yaml exists, hashes match, produced_by: skill:sample-data-scaffolding | PLANNED → SCAFFOLDED |
| 3b: UNIT | Unit tests pass via trusted_runner.run_trusted_test_suite | Audit bundle at .ledger/evidence/<component>/unit-test-bundle.json, produced_by: bob-trusted-runner | SCAFFOLDED → UNIT_TESTED |
| 3c: INTEGRATION | integration-flow-testing generated per-point tests AND they pass via bob's trusted runner | Integration-test audit bundle, produced_by: bob-trusted-runner | UNIT_TESTED → INTEGRATED |
| 3d: FLOW | Declared flow tests pass AND metacognitive audit approves (cold Claude + Codex via audit_spawn.py, ≥3 structured disagreements) | Flow-test audit bundle + audit JSON record (both verdicts) | INTEGRATED → VERIFIED |
Backwards compatibility: WPs without a contract map continue to run the traditional Phase 3 (single TEST gate). The sub-phases apply ONLY when progress/contract-map.yaml exists for the WP's component.
Authoritative precedence: when the SDLC phase and the integration ledger disagree, the ledger wins. Consult ~/.claude/skills/development-lifecycle/ledger-mapping.yaml to translate between SDLC and ledger states.
| Change Type | Minimum Testing |
|---|
| PHP/theme template | Load the page, verify no errors (browser or curl) |
| CSS changes | Visual verification (screenshot or browser check) |
| Python code | Run the test suite, show output |
| API changes | Call the endpoint, show response |
| Database changes | Run migration, verify schema |
| Config changes | Restart service, verify it starts |
| Any change | Verify the specific behavior that was changed works |
Testing Checklist
Evidence required: Test command + output pasted or referenced. Not "tests pass" — show it.
Performance Dimension (conditional)
Applies when the change touches: API endpoints, database queries, UI rendering, batch processes, or hot-path code identified by context-detection.
Does NOT apply to: config-only changes, documentation, CSS/copy, test-only changes.
| Change Type | Performance Check |
|---|
| New/modified API endpoint | Response time at expected concurrency (hey, k6, wrk) |
| Database query change | EXPLAIN ANALYZE output, execution time |
| Frontend page/component | LCP measurement (Lighthouse or CWV) |
| Batch process/worker | Throughput (items/sec) + peak memory |
| Hot-path code (per context-detection) | Profile before and after |
Evidence: tool command + numeric output shown. "It loads fast" is not evidence.
If component has performance budget: compare against budget.
If no budget: record measurement as initial baseline.
Phase 4: SECURE
Gate: Security checklist completed for the change type.
Universal Security Checks (All Changes)
Web/PHP Security (WordPress/WooCommerce)
Python Security
API Security
Payment/Financial
Evidence required: Completed checklist with each item checked or marked N/A with reason.
Not applicable? If a section doesn't apply (e.g., no Python in a CSS change), mark it N/A — but the Universal checks ALWAYS apply.
Phase 5: DOCUMENT
Gate: Changes are documented proportional to their impact.
Contract-mapped components: the DOCUMENT phase now requires the component to be at stage VERIFIED in progress/integration-ledger.md. Advancing to DOCUMENTED increments the ledger status VERIFIED → DOCUMENTED. DOCUMENTED is a prerequisite for DONE. History.md and index.md entries may be written ONLY at the DOCUMENTED transition — writing them earlier desynchronizes human-readable docs from the ledger state.
| Change Impact | Documentation Required |
|---|
| Trivial (typo, config) | Commit message sufficient |
| Small (single feature/fix) | Commit message + brief inline comments if logic isn't obvious |
| Medium (new feature, API change) | Update relevant docs (README, API docs, project instructions file if conventions changed) |
| Large (architecture, new system) | Design doc + updated docs + migration guide if applicable |
What to Document
- Why the change was made (not just what changed — git diff shows what)
- How to use new features or APIs
- Breaking changes and migration steps
- Configuration changes needed
- Dependencies added and why
Project Documentation Updates (per project-documentation skill)
- Update
history.md with what was done (date, action, files, reason)
- Update
index.md if new files were created
- Update subfolder
INDEX.md if files added to documented folders
- If these files don't exist, create them from templates in the
project-documentation skill
Evidence required: Documentation exists and is referenced. For trivial changes, the commit message IS the documentation.
Phase 6: REVIEW
Gate: Another agent or the user has reviewed the work.
| Context | Review Method |
|---|
| Forge team task | Challenger/QA agent reviews (built into forge) |
| Solo task (no team) | Present summary to user with: what changed, test results, security checklist |
| Production deployment | User approval required before deploy |
Review Checklist
Evidence required: Review completed — either by challenger agent or user acknowledgment.
Phase 7: DONE
Work is DONE when:
- All applicable gates have evidence
- Review is complete
- Changes are committed (if requested)
- User is informed of what was done
"Done" means provably done, not probably done.
Quick Reference — Minimum Evidence Per Phase
| Phase | Evidence |
|---|
| PLAN | Approach stated before coding |
| IMPLEMENT | Code written following skills and conventions |
| TEST | Test command + output shown |
| SECURE | Security checklist completed (checked or N/A) |
| DOCUMENT | Docs updated or commit message covers it |
| REVIEW | Challenger reviewed or user informed |
Integration with Forge
When forge is running a team, this lifecycle applies to every specialist task:
- Manager assigns task → specialist plans approach
- Specialist implements → follows domain skills
- Specialist tests → shows output
- Specialist runs security checklist → completes applicable items
- Specialist documents → updates relevant docs
- Challenger reviews → checks all gates
- Only THEN is the task marked complete
Forge's existing quality gates map directly:
- Code Review = Phase 6 (REVIEW)
- UX Review = Phase 3 (TEST — visual verification)
- Regression Testing = Phase 3 (TEST — regression)
- Design Compliance = Phase 6 (REVIEW — matches plan)
Red Flags — STOP
These thoughts mean you're about to skip a gate:
| Thought | Reality |
|---|
| "This change is too small to test" | Small changes break things. Test it. |
| "Security doesn't apply to CSS" | Universal checks always apply (no secrets, no sensitive data) |
| "I'll document it later" | Later never comes. Document now. |
| "The tests would be trivial" | Then they'll take 30 seconds. Write them. |
| "I already know it works" | Prove it. Show the output. |
| "It's just a refactor, nothing changed" | Then tests should pass. Run them and show it. |
| "The user didn't ask for tests" | Tests aren't optional. The lifecycle requires them. |
| "Skipping review to save time" | Reviews catch bugs. Skipping costs more time. |
All of these mean: STOP. Complete the gate.
Anti-Patterns
| Don't | Why |
|---|
| Say "tests pass" without showing output | No evidence = no verification |
| Skip security checklist on "simple" changes | Simple changes introduce vulnerabilities too |
| Leave TODO comments as "documentation" | TODOs are debt, not documentation |
| Mark work done before review | Review is the final gate, not optional |
| Batch all testing to the end | Test each piece as you build — catches issues early |
| Skip planning for "obvious" tasks | Obvious tasks have hidden complexity. State the plan. |
| Combine security + testing into "it works" | Separate concerns — working ≠ secure |