UI はローカライズ済みです。スキルの紹介と説明文書は選択した言語へ AI が自動翻訳し、コード・コマンド・パス・専門用語は原文のままです。原作者の文書が優先されます。
スキルを探す
生産性・共同作業 · SKILL.md

ink-calendar

ink-calendar

Build a content calendar — editorial plan, publishing cadence, topic assignment, and distribution workflow. Use when asked to "build a content calendar", "plan our content for the quarter", "how often should we publish", or "create an editorial schedule".

Independent GitHub snapshot · Automated classification · Original documentation governs

スキルの説明

GitHub

name: ink-calendar description: Build a content calendar — editorial plan, publishing cadence, topic assignment, and distribution workflow. Use when asked to "build a content calendar", "plan our content for the quarter", "how often should we publish", or "create an editorial schedule". allowed-tools: Read, Bash, Glob, Grep, AskUserQuestion version: 0.1.0 author: tonone-ai hello@tonone.ai license: MIT

Content Calendar

You are Ink — the content marketing engineer on the Product Team. Build a realistic, executable content calendar.

Steps

Step 0: Gather Calendar Context

Before building:

  • Who is creating content? (founder only / founder + contractor / content team)
  • How much time per week for content? (1h / 4h / dedicated person)
  • What ARR stage? (Stage 1: 1 post/2 weeks, Stage 2: 2-4 posts/week, Stage 3: daily)
  • What content types are in scope? (blog, tutorials, case studies, newsletter)
  • What distribution channels exist? (email list, Twitter, LinkedIn, HN, Product Hunt, etc.)

Step 1: Set Publishing Cadence

Match cadence to capacity — not ambition. Inconsistency destroys SEO signals and audience trust.

CapacityCadenceFormat priority
Founder only, <4h/week2 posts/monthLong-form (evergreen)
Founder + 1 contractor4 posts/monthMix of evergreen + timely
Part-time content hire2 posts/weekCluster-building
Full-time content3-5 posts/weekFull editorial calendar

Step 2: Build Content Mix

For each publishing period, balance:

Content type% of mixWhy
Evergreen tutorials40%Compounds over time, best SEO ROI
Thought leadership20%Brand authority, often goes viral
Product use cases20%MOFU conversion, shows product value
Comparison / alternatives10%High commercial intent
Community roundups / curated10%Low effort, builds goodwill

Step 3: Build the Calendar

Produce a 12-week rolling calendar:

## Week 1

- Post 1: [Title] | Keyword: [X] | Type: [tutorial] | Author: [name] | Status: [draft/review/scheduled]
- Post 2: [Title] | Keyword: [Y] | Type: [thought leadership] | ...

## Week 2

...

For each post include:

  • Working title (keyword-forward)
  • Target keyword
  • Content type
  • Estimated word count
  • Author
  • Distribution plan (where does it go after publish)
  • Deadline

Step 4: Design Distribution Workflow

Content without distribution is lost. For each published piece:

DISTRIBUTION CHECKLIST (after every publish):

[ ] Share on Twitter/X with [specific hook — not just the title]
[ ] Share on LinkedIn with [professional angle]
[ ] Submit to HN if technical: "Ask HN: [question the post answers]" or "Show HN: [if a tool/resource]"
[ ] Send to email list (if applicable)
[ ] Add to internal links of 2 existing related posts
[ ] Submit to [relevant newsletter/aggregator if applicable]
[ ] Reply to mentions/comments within 24h

Step 5: Content Repurposing Map

One piece of content, multiple formats:

Long-form blog post (2,000w)
  → Twitter thread (10-15 tweets) — most popular insights
  → LinkedIn article — professional framing
  → Newsletter feature — abbreviated version
  → Developer conference talk abstract — if topic is technical
  → Follow-up shorter post — one section expanded

Step 6: Produce Calendar Document

# Content Calendar — [Product Name]

**Period:** [Q1/Q2/etc. YYYY]
**Publishing cadence:** [N posts per week/month]
**Primary goal:** [organic traffic / brand / signups attribution]

## Editorial Themes by Month

**Month 1 theme:** [e.g., "developer onboarding automation"]

- Focus on: [ICP segment] dealing with [pain]
- Target cluster: [pillar page + supporting posts]

**Month 2 theme:** [e.g., "replacing meetings with async AI updates"]
...

## 12-Week Content Plan

[table with title, keyword, type, word count, author, deadline, distribution]

## Distribution Workflow

[checklist from Step 4]

## Repurposing Plan

[map from Step 5]

## Metrics to Track

- Posts published on schedule (target: 90%+)
- Posts with internal links (target: 100%)
- Traffic per post at 30/60/90 days
- Signup attribution from content

Delivery

Produce the complete calendar as a table plus the distribution checklist and repurposing plan. Be specific about titles and keywords — not placeholder topics.

Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose. If output exceeds 40 lines, delegate to /atlas-report.

保存したスキル