ncr-punch-writerWrite a construction NCR, punch item, or defect notice with clause or drawing reference, evidence required, disposition, and close-out status. Use when the user says NCR, non-conformance, punchlist, snag, defect, defective work, or close-out item.
Independent GitHub snapshot · Automated classification · Original documentation governs
Defect first. Money later. Disposition is a status machine, not a vibe.
OPEN → DISPOSITION SET → REWORK / USE-AS-IS / REJECT → VERIFY → CLOSED
Do not jump to CLOSED without a listed verification record.
variation-eot-draft if backcharge is the path.Follow assets/ncr-template.md. For a punch walk, also emit the register table at the top of that file.
HOLD POINT — not issued / not closed
Only if asked. Quality control + corrective action + lessons learned. No competency claim.