meeting-minutes-actions

meeting-minutes-actions

Turn a construction site, PCG, toolbox, kick-off, or client meeting into minutes plus an action register with owner and due date. Use when the user says minutes, toolbox talk, PCG, kick-off, site meeting, coordination meeting, or extract actions from a transcript or notes.

Independent GitHub snapshot · Automated classification · Original documentation governs

スキルの説明

GitHub

name: meeting-minutes-actions description: Turn a construction site, PCG, toolbox, kick-off, or client meeting into minutes plus an action register with owner and due date. Use when the user says minutes, toolbox talk, PCG, kick-off, site meeting, coordination meeting, or extract actions from a transcript or notes. metadata: type: workflow version: "1.0" pack: construction-office-skills domain: construction-pm

Meeting minutes + action register

Produce minutes the office can file and an action table a PM can chase. Do not write a narrative essay.

Inputs required

Collect before drafting. Mark anything missing as UNKNOWN.

  • Meeting type (toolbox / site coord / PCG / kick-off / client / other)
  • Date, time, location or call link
  • Project name + number
  • Chair
  • Attendees (name + company + role)
  • Apologies
  • Source (transcript, notes, recording summary, email chain)
  • Prior action register if supplied

Refuse list

  • Do not invent attendees, decisions, or commitments.
  • Do not assign an owner unless the source names one. Use OWNER UNASSIGNED.
  • Do not set a due date unless spoken or already in the register. Use DATE UNASSIGNED.
  • Do not send the minutes. Stop at draft.
  • Do not convert a commercial claim into a "decision" unless someone with authority said it.

Method

  1. Separate the source into decisions, information, and actions. Drop small talk.
  2. One decision = one bullet. Include who decided if stated.
  3. One action = one row. Verb + object + object location (drawing / area / spec) if given.
  4. Carry forward open actions from a prior register. Mark OPEN, DONE, or SUPERSEDED. Do not silently drop them.
  5. Flag risks or programme items mentioned, even if no action was assigned — put them under Watch items.
  6. If the source is messy, list Clarifications needed instead of guessing.

Output

Follow assets/minutes-template.md. Keep it short.

After the minutes, add:

HOLD POINT — not issued
Distribution list: UNKNOWN unless supplied

Optional VET map

Only if asked. Map to BSBPMG422-style evidence — meeting record, action follow-up, quality/comms control. One line per element. No competency claim.

Done when

  • Every action row has Owner and Due columns filled with a value or UNASSIGNED.
  • Decisions and actions are not mixed.
  • No invented names or dates.