L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

executing-plans

executing-plans

Use when executing an existing implementation plan, tracking dependencies, adapting outdated steps, and verifying acceptance checks.

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: executing-plans description: 'Use when executing an existing implementation plan, tracking dependencies, adapting outdated steps, and verifying acceptance checks.' zh_description: "用于按既定实现计划逐步执行任务,并在关键节点进行审查和完成验证。" version: "1.0.7" author: "seaworld008" source: "github:obra/superpowers" source_url: "https://github.com/obra/superpowers/blob/main/skills/executing-plans/SKILL.md" license: MIT tags: '["plans", "execution", "workflow"]' created_at: "2026-04-13" updated_at: "2026-09-22" quality: 3 complexity: "intermediate"

Executing Plans

Overview

Load plan, review critically, execute all tasks, report when complete.

Announce at start: "I'm using the executing-plans skill to implement this plan."

Use subagents only when supported, permitted, and useful for independent tasks. Otherwise execute the plan directly; no extra runtime setup is needed.

The Process

Step 1: Load and Review Plan

  1. Inspect workspace ownership; reuse a clean task branch or isolate work if necessary
  2. Read plan file
  3. Review critically - identify any questions or concerns about the plan
  4. Resolve routine concerns from repository evidence; ask about material unresolved decisions
  5. If no concerns: Create todos for the plan items and proceed

Step 2: Execute Tasks

For each task:

  1. Mark as in_progress
  2. Preserve the intended outcome; adapt obsolete implementation details from current evidence
  3. Run verifications as specified
  4. Mark as completed

Step 3: Complete Development

After all tasks complete and verified:

  • Inspect the requested delivery target and repository completion checks
  • Use an available finishing workflow when its methods are needed
  • Verify required checks and execute the delivery path already requested; ask only if it is unresolved

When to Stop and Ask for Help

STOP executing immediately when:

  • Required access or a consequential user decision is unavailable after investigation
  • Plan has critical gaps preventing starting
  • A material scope conflict cannot be resolved from current instructions or evidence
  • Verification reveals an external blocker that cannot be repaired within the authorized scope

Investigate test failures and missing local dependencies first; repair routine blockers within scope. Ask for the specific missing input only when it is necessary.

When to Revisit Earlier Steps

Return to Review (Step 1) when:

  • Partner updates the plan based on your feedback
  • Fundamental approach needs rethinking

Don't force through blockers - stop and ask.

Remember

  • Review plan critically first
  • Follow acceptance criteria and update the plan when current evidence requires a change
  • Don't skip verifications
  • Reference skills when plan says to
  • Stop when blocked, don't guess
  • Never start implementation on main/master branch without explicit user consent

Task Evidence Ledger

Track results against the actual work revision:

Task: Implement retry policy
Input: Existing plan, current error contract, caller tests
Files: Client implementation and focused retry tests
Acceptance: Bounded attempts; cancellation propagates
Evidence: Test command, exit status, revision
Next: Integration check after the dependent caller changes

Reuse passing evidence while its relevant inputs are unchanged. Invalidate the affected check when a dependency or implementation changes. Keep failed checks visible until their causes are resolved. A skipped external integration is not a passing integration test.

Plan Drift and Recovery

Compare each step with current repository files before executing it. When a command or file moved, update the plan from observed evidence. Keep unfinished user tasks separate from newly discovered follow-up work. For an unavailable dependency, complete independent tasks first. Report the precise missing access or decision needed for blocked work.

Completion Example

Implemented: Tasks 1-4, with dependency order preserved.
Validated: Focused tests and required repository checks.
Delivery: PR created and merged when that was requested.
Unverified: External staging flow requires a configured environment.
Skills enregistrées