L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

rice-prioritisation

rice-prioritisation

Scores and ranks product initiatives using the RICE framework. Use when asked to prioritise features, rank a backlog using RICE, score initiatives for quarterly planning, or apply an objective framework to a list of competing ideas. Produces a ranked RICE table with scores, quick wins and moonshot flags, dependency notes, and a recommended sequencing order.

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: rice-prioritisation description: "Scores and ranks product initiatives using the RICE framework. Use when asked to prioritise features, rank a backlog using RICE, score initiatives for quarterly planning, or apply an objective framework to a list of competing ideas. Produces a ranked RICE table with scores, quick wins and moonshot flags, dependency notes, and a recommended sequencing order."

RICE Prioritisation Skill

Apply consistent, criteria-based RICE scoring to a list of features or initiatives to produce an objective prioritisation ranking.

Reads from / Writes to the Brain

If a professional-brain (brain/) exists, ground in it instead of re-asking for what you already know:

  • Read first: knowledge/strategy.md (so the ranking serves the direction), the items as entities/, and impact hypotheses/. Run python3 ../professional-brain/scripts/brain_query.py ./brain "<initiative theme>" and carry each fact's provenance tag through — an impact estimate is usually a [hunch], not [data].
  • 📥 Propose to the Brain: after producing, propose recording the ranking decision to decisions/ and the reach/impact estimates as hypotheses/ tagged by evidence strength. Show them, get a yes, then write with ../professional-brain/scripts/brain_write.py … --commit (append-only, dry-run by default).

Required Inputs

Work from what is given. If any of these is missing, still produce the complete output: fill each gap with a reasonable assumption marked (assumed, confirm) and list those assumptions at the end. Ask a question first only when the core subject itself is missing (there is nothing to write about).

  • List of initiatives or features to score (names and brief descriptions)
  • Reach estimates (users affected per quarter — from analytics if available)
  • Impact estimates (use the standard scale below)
  • Effort estimates (person-months — from engineering if available)
  • Quarter or planning period

RICE Definitions (adapt to your context)

  • Reach: Number of users affected per quarter (use actual DAU/MAU data where available)
  • Impact: Effect on your primary metric — use scale: 3=massive, 2=high, 1=medium, 0.5=low, 0.25=minimal
  • Confidence: How certain are we about R and I estimates? 100%=high, 80%=medium, 50%=low
  • Effort: Person-months required across all functions

RICE Formula

RICE Score = (Reach × Impact × Confidence) / Effort

Programmatic Helper

This skill ships with a stdlib-only Python script that calculates and ranks RICE scores so the maths is consistent and the quick-win / moonshot flags are applied by rule, not by feel. Feed it the initiatives once R, I, C, and E are gathered.

# From a JSON file (confidence accepts 0.8 or 80)
python3 scripts/rice_calculator.py initiatives.json

# Or from a CSV with header: name,reach,impact,confidence,effort
python3 scripts/rice_calculator.py initiatives.csv --format csv

# Or piped in
echo '[{"name":"Onboarding","reach":5000,"impact":2,"confidence":0.8,"effort":3}]' \
  | python3 scripts/rice_calculator.py -

It outputs a ranked table with computed RICE scores and auto-flags quick-win (strong score, low relative effort), moonshot (high impact, high effort), and low-confidence (≤50%) items. Use the computed ranking as the starting point, then apply the validation step below — never accept a surprising top rank without checking the estimates behind it.

Deeper Materials

  • references/estimate-calibration.md — how to anchor each of the four estimates (reach sources, the impact scale with reserve-it-for examples, evidence-based confidence, cross-functional effort) and the cross-checks to run on the finished ranking. Apply it when challenging the user's inputs.
  • templates/scoring-worksheet.md — a fill-in worksheet whose evidence columns force each score to name its source. Offer it when a team wants to score together rather than have the ranking generated.

Where this sits — scoring on the spine

Third in the product-decision spine: /assumption-mapper → /prd-template → rice-prioritisation → /roadmap-narrative. It receives the success metric from each initiative's PRD — RICE's Impact is the estimated move on that baselined number, not a fresh guess — and hands /roadmap-narrative the ranked initiatives with their scores to group into themes. The four RICE terms are defined once in docs/craft/product-decisions.md; Confidence there is the honesty valve, and this skill lives or dies on using it.

The loop

RICE fails when estimates are invented to produce a desired ranking. The loop's job is to keep every score honest; Phase 2 is where that happens.

  1. Gather the four estimates per initiative. Reach (real count per period), Impact (magnitude on the PRD's success metric), Confidence (0–1), Effort (person-months). Pull Impact from the upstream PRD's metric where it exists. Done when: every initiative has all four, and each carries a provenance tag on its source.
  2. Interrogate confidence — the anti-gaming phase. For each estimate, confidence must reflect evidence, not enthusiasm: a bold impact with no data gets a low confidence, and the score self-corrects. Challenge weak inputs and name what data would raise them (the disclosed estimate-calibration reference is the how). Done when: no [hunch] estimate wears a high confidence, and the person who owns the estimate would defend each number out loud.
  3. Score, rank, and stress the top. Compute RICE, rank, flag quick wins (high score, low effort) and moonshots (high impact, high effort), note dependencies. Then the cross-check: if the top item surprises the team, an estimate is probably inflated — RICE is a tool, not a verdict. Done when: the ranking is computed and the top result has survived one honest "does this feel right, and if not, which estimate is lying?"
  4. Hand off. Pass the ranked table (with scores and dependencies) to /roadmap-narrative so it groups by theme rather than re-deriving priorities. Done when: /roadmap-narrative could theme these without re-scoring.

Output Structure

RICE Prioritisation: [Backlog/Quarter]

InitiativeReachImpactConfidenceEffortRICE ScoreNotes
[name][n][score][%][months][score][flags]

Recommended Sequence

[Top 5 initiatives with rationale]

Quick Wins (high score, low effort)

[Items to pick up alongside bigger bets]

Data Gaps to Address

[What information would most improve scoring accuracy]

Scoring Rubric (0–40)

Score any output of this skill before handing it over; 32+ is ship-quality.

Dimension0510
Estimate credibilityRound-number guesses at 100% confidence; effort estimated by PM aloneReach grounded in analytics but confidence uniform across items regardless of evidenceEach estimate names its source; anything without data sits at 50% confidence; effort comes from engineering, and the doc says so
Impact discriminationEverything scored 2–3 — the scale produces no signalSome spread across the scale but anchors undefined, so scores aren't comparableFull scale used with a stated anchor for each level; "massive" reserved for genuinely rare items
Ranking interrogationRaw sorted output accepted as the verdictQuick wins and moonshots flagged, but surprising ranks and dependencies unexaminedSurprising top ranks investigated with the inflated estimate found or defended; dependencies noted where they change sequencing
Actionable sequencingA scored table with no recommendationTable plus a top-5 list, but no rationale or data-gap follow-upsRecommended sequence with per-item rationale, quick wins slotted alongside bigger bets, and named data gaps that would sharpen the next pass

Quality Checks

  • Every initiative has all four RICE components estimated (even roughly)
  • Confidence is 50% for anything without data backing (not 100% as a default)
  • Quick wins and moonshots are explicitly called out
  • Dependencies that affect sequencing are noted
  • Any surprising ranking is investigated before accepting it

Anti-Patterns

  • Do not default to 100% confidence on estimates that lack supporting data — this inflates scores and misleads planning
  • Do not treat RICE scores as a final decision — a ranking that surprises the team must be investigated before it is accepted
  • Do not omit effort estimates from engineering — PM-only effort estimates are frequently optimistic and skew results
  • Do not forget to note dependencies that would change the sequencing even if RICE scores suggest otherwise
  • Do not score every initiative at the same impact level — if everything is "high impact," the framework produces no useful signal

Example Trigger Phrases

  • "Prioritise features."
  • "Rank a backlog using RICE."
  • "Score initiatives for quarterly planning."
  • "Apply an objective framework to a list of competing ideas."
Skills enregistrées