brainstorming
brainstorming
You MUST use this before any creative work - creating features, building components, adding functionality, modifying behavior, or planning anything new, in software or out of it (a talk, a business, a renovation).
pace-planBuild, coordinate, operate, troubleshoot, exercise, and improve an authorized Primary, Alternate, Contingency, and Emergency communications plan. Use for resilient emergency-communications paths and their ownership, triggers, check-ins, tests, and corrective actions. Do not use for generic incident status messaging, frequency or channel planning, radio prog…
Independent GitHub snapshot · Automated classification · Original documentation governs
PACE means Primary, Alternate, Contingency, and Emergency. Use this skill to make a group's communications fallbacks operable, testable, and reviewable without inventing local facts or authority.
This skill can support live activation, transmission, or tests that change external state. Read-only discovery and document drafting may proceed without confirmation.
Before the first real transmission, activation, live-system test, or other external mutation:
Confirm the target, scope, and rollback path before acting. Read-only discovery may proceed without confirmation.
Also confirm the named activation authority permits the operational action under the applicable procedure. Plan approval by a decision-maker does not by itself authorize activation. Never infer authority from urgency, role labels, access to equipment, or possession of plan details. Destructive actions and irreversible cleanup require an explicit user directive.
Do not invent frequencies, channels, talkgroups, call signs, contacts, infrastructure, regulatory permission, medical or public-safety instructions, or authority to transmit or activate. Defer to authorized operating procedures, applicable regulation, and incident leadership.
PLAN -> COORDINATE -> OPERATE -> TROUBLESHOOT -> EXERCISE -> IMPROVE
Evaluate every proposed P/A/C/E path against these CISA-derived questions:
Different applications are not demonstrably independent merely because their names differ. When paths share a device, network, power source, provider, site, or other critical dependency, identify whether the anticipated failure would disable both and record the owner's risk decision. Do not declare independence from technology names alone.
If four feasible paths do not exist, preserve missing tiers as explicit gaps. A truthful incomplete plan is safer than invented redundancy.
Never fill a missing plan-local fact with a plausible value. Record:
VALUE: UNKNOWN
OWNER: [person or role responsible for resolving it]
VALIDATION ACTION: [observable check that will establish the value]
An unknown authority, trigger, endpoint capability, or required contact blocks approval of the affected path. It does not block documenting the rest of the plan.
| Need | Load | File |
|---|---|---|
| Design a plan or audit path completeness and independence | Plan design method | references/plan-design.md |
| Assign authority, align endpoints, or define activation and handoff | Coordination and operation | references/coordination-and-operation.md |
| Diagnose a failed or degraded path | Troubleshooting method | references/troubleshooting.md |
| Design a drill, after-action review, or improvement cycle | Exercise and improvement | references/exercise-and-improvement.md |
| Audit the domain claims or source limitations behind this skill | Evidence base | references/evidence-base.md |
| Test description boundaries outside portable output evals | Trigger probes | references/trigger-probes.md |
| Artifact | Use when | File |
|---|---|---|
| PACE plan worksheet | Creating or auditing all four paths for one mission or function | templates/pace-plan-worksheet.md |
| Communications check-in card | Giving participants a concise, approved operating aid | templates/communications-check-in-card.md |
| Exercise and after-action review | Planning a bounded test and converting observations into corrective actions | templates/exercise-and-after-action-review.md |
| Troubleshooting decision log | Diagnosing a failure and preserving evidence, decisions, and handoffs | templates/troubleshooting-decision-log.md |
The work is complete only when:
This skill is technology-neutral and host-neutral. It organizes plan-local facts and decisions; it does not replace local procedures, licenses, regulations, equipment manuals, or incident authority.