L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

trade-show-budget-planner

trade-show-budget-planner

Model exhibition costs, contingency, revenue scenarios, and margin-based break-even from explicit assumptions.

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: trade-show-budget-planner description: Model exhibition costs, contingency, revenue scenarios, and margin-based break-even from explicit assumptions. license: MIT metadata: version: 0.5.0 stage: pre-show category: planning homepage: https://github.com/LensmorOfficial/trade-show-skills/tree/main/trade-show-budget-planner

Trade Show Budget Planner

Build realistic trade show budgets and ROI projections — based on actual cost benchmarks, not wishful thinking.

When this skill triggers:

  • Use it when the team is deciding whether a show budget is realistic, oversized, or too thin to justify
  • Use it after trade-show-finder identifies a target event, or before final internal approval for a booth
  • If the user mainly needs task sequencing rather than cost planning, continue with exhibitor-checklist-generator

Example Requests

  • Plan our trade show budget
  • 帮我做展会预算
  • Messebudget planen
  • 展示会の予算を作る
  • planificar presupuesto de feria

Workflow

Step 1: Determine Scope

Extract from the user's request:

Required:

  • Show name (or type: "major international" vs "regional niche")
  • Participation type: exhibiting (with booth) vs. attending only vs. sponsoring

Helpful:

  • Booth size they're considering (sqm or sqft)
  • Team size traveling
  • Location (affects travel/hotel costs significantly)
  • What they're trying to achieve (leads, brand awareness, partnerships, product launch)
  • Previous show experience (first-timer vs. veteran)
  • Budget range if they have one in mind
  • Currency, whether quotes include tax, and quote date
  • Gross margin for profit-based ROI (if unknown, keep revenue recovery separate from ROI)

If the team has not decided between exhibit vs. attend, model the most likely exhibit scenario and add a lean attend-only alternative rather than blocking.

Step 2: Build the Budget

Use this framework. Adapt categories based on participation type.

For Exhibitors (Booth)

## Trade Show Budget: [Show Name] [Year]

### 1. Space & Infrastructure
| Item | Estimate | Notes |
|------|----------|-------|
| Booth space rental | $X | [sqm × rate; estimate rate if unknown] |
| Booth design & build | $X | [shell scheme vs custom; rule of thumb: 2-3x space cost for custom] |
| Furniture rental | $X | [tables, chairs, displays, storage] |
| Electrical & internet | $X | [often surprisingly expensive at venues] |
| Signage & graphics | $X | |
| **Subtotal** | **$X** | |

### 2. Travel & Accommodation
| Item | Estimate | Notes |
|------|----------|-------|
| Flights (X people) | $X | [book 2-3 months ahead for shows] |
| Hotel (X nights × X people) | $X | [show hotels are premium; budget 1.5-2x normal rates] |
| Ground transport | $X | [airport transfers, daily commute to venue] |
| Meals & entertainment | $X | [client dinners, team meals] |
| **Subtotal** | **$X** | |

### 3. Marketing & Collateral
| Item | Estimate | Notes |
|------|----------|-------|
| Pre-show marketing | $X | [email campaigns, social ads, invite printing] |
| Printed materials | $X | [brochures, business cards, handouts] |
| Giveaways / swag | $X | |
| Lead capture system | $X | [badge scanner rental or app] |
| **Subtotal** | **$X** | |

### 4. Staffing & Operations
| Item | Estimate | Notes |
|------|----------|-------|
| Staff time (opportunity cost) | $X | [days × people × daily rate] |
| Booth staff training | $X | [if applicable] |
| Shipping & logistics | $X | [samples, equipment, booth materials] |
| Insurance | $X | |
| **Subtotal** | **$X** | |

### Total Estimated Budget: $X

## Budget Decision Snapshot
- Participation mode: [Exhibit / Attend / Sponsor]
- Budget confidence: [High / Medium / Low]
- Largest cost drivers: [top 2-3]
- Biggest unknowns: [what still needs confirmation]

Cost estimation rules:

  • If the user gives a specific show, search for actual booth rental rates if possible
  • If rates unknown, use industry benchmarks and mark every figure as [EST]:
    • Space: $300–600/sqm [EST 2023–2024, US/EU major shows] — verify with organizer; rates for 2025+ shows may be higher
    • Space: $150–300/sqm [EST 2023–2024, regional/Asia shows]
    • Custom booth build: $1,500–3,000/sqm [EST 2023–2024]
    • Shell scheme: $500–1,000/sqm [EST 2023–2024]
  • Hotels near major show venues: 1.5-2x normal city rates during show week
  • Always note which figures are estimates vs. confirmed rates
  • Show the base subtotal and a separate 10% contingency line before the total. State which costs the contingency covers; do not silently omit it or count it twice
  • Separate cash outlay from staff opportunity cost. Use one stated currency; label any currency conversion with its source and date

What to confirm with the venue (include as a checklist if the user is in early planning):

  • Exact booth space rate and what's included (bare space vs. shell scheme)
  • Electrical/internet connection fees and lead times
  • Move-in/move-out schedule and overtime labor rates
  • Mandatory services (cleaning, security, carpet) that may be billed separately
  • Early bird registration deadlines and cancellation policies

For Attendees Only

Simpler budget — travel, hotel, registration fee, meals, and opportunity cost.

Step 3: ROI Projection

## ROI Projection

### Assumptions
- Expected booth visitors: [X] (based on show size and booth location)
- Meaningful conversations: [X]% of visitors = [X] qualified leads
- Conversion rate (lead → opportunity): [X]%
- Conversion rate (opportunity → deal): [X]%
- Average deal value: $[X]

### Projected Pipeline
| Stage | Count | Value |
|-------|-------|-------|
| Booth visitors | X | — |
| Qualified leads | X | — |
| Opportunities | X | $X |
| Closed deals | X | $X |

### ROI Calculation
- **Total investment**: $X
- **Projected revenue**: $X
- **Revenue recovery**: X% (revenue-based; not profit ROI)
- **Profit ROI**: X% or Not assessed (gross margin required)
- **Cost per lead**: $X
- **Revenue / profit break-even**: X deals / Y deals or Not assessed

### Sensitivity Analysis
| Scenario | Leads | Expected Deals | Revenue | Revenue Recovery | Profit ROI |
|----------|-------|----------------|---------|------------------|------------|
| Conservative | X | X | $X | X% | X% / Not assessed |
| Base case | X | X | $X | X% | X% / Not assessed |
| Optimistic | X | X | $X | X% | X% / Not assessed |

ROI rules:

  • Calculate with explicit formulas: leads = visitors × qualification rate; opportunities = leads × opportunity rate; expected deals = opportunities × win rate; revenue = expected deals × deal value. Keep fractional expected deals through the calculation; label rounded planning targets separately
  • Revenue recovery = (attributable revenue − investment) / investment. Label this a revenue-based measure, not profit ROI
  • Profit ROI = (attributable revenue × gross margin − investment) / investment. If gross margin is missing, report profit ROI and profit break-even as Not assessed
  • Revenue break-even deals = ceiling(investment / deal value); profit break-even deals = ceiling(investment / (deal value × gross margin)). State the chosen investment basis; a zero denominator is Not assessed, never a division result
  • Include contingency in every scenario's investment. Keep unsupported conversion assumptions visibly labeled as scenario inputs; do not infer booth visits from total show attendance
  • Always include a conservative scenario — trade shows often underperform first-time expectations
  • If the user hasn't exhibited before, use more conservative conversion rates
  • Note that trade show ROI often materializes over 6-12 months, not immediately
  • Include qualitative value that's hard to quantify: brand visibility, competitive intel, market feedback

Step 4: Decision and Optimization Suggestions

Start this section with a clear recommendation:

  • Go as planned
  • Re-scope (smaller booth, fewer staff, simpler build)
  • Attend only
  • Defer

Based on the budget, suggest 2-3 ways to optimize:

  • If budget-constrained: Consider a smaller booth in a better location, attend-only with scheduled meetings, or share a booth with a partner
  • If first-timer: Compare shell scheme with custom build and test pre-show marketing assumptions; do not guarantee traffic or conversion
  • Common overspends: Custom booth builds (often 40% of total), premium giveaways, over-staffing
  • Common underspends: Pre-show marketing (the #1 driver of booth traffic), lead follow-up tools, staff training
  • Pre-show research: Review current exhibitor categories and booked-meeting evidence before choosing a booth size; an exhibitor list alone does not establish booth traffic

Step 5: Exportable Format

Offer to output the budget as:

  • Markdown table (default)
  • CSV format (for spreadsheet import)
  • Executive summary (1-page version for budget approval)

Add a Next-Step Handoff section:

  • If approved, continue with exhibitor-checklist-generator
  • If traffic generation is the main risk, continue with booth-invitation-writer
  • If swag meaningfully affects spend or booth traffic, continue with booth-giveaway-planner

Quality Checks

Before delivering results:

  • Separate confirmed costs from estimated costs; do not blur them together
  • Every ROI scenario must state its conversion assumptions explicitly
  • If participation mode is undecided, include an attend-only or re-scoped alternative rather than pretending the exhibit plan is fixed
  • Budget confidence should drop when venue pricing, booth build scope, or travel assumptions are still unknown
  • Optimization advice must reflect the stated goal; do not cut pre-show marketing if meetings and booth traffic are the core objective
Skills enregistrées