L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Design et création · SKILL.md

dvp-test-plan

dvp-test-plan

Design Verification Plan and Report (DVP&R) — build or review a test plan that links each DFMEA failure mode to a specific test, pass/fail criterion, sample size, and timing. Use when creating a DVP for a new design, reviewing a supplier's DVP for completeness, or auditing whether all design risks are covered by validation testing. Covers IATF 16949 §8.3.4.…

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: dvp-test-plan description: >- Design Verification Plan and Report (DVP&R) — build or review a test plan that links each DFMEA failure mode to a specific test, pass/fail criterion, sample size, and timing. Use when creating a DVP for a new design, reviewing a supplier's DVP for completeness, or auditing whether all design risks are covered by validation testing. Covers IATF 16949 §8.3.4.3 and AIAG APQP Phase 2. license: MIT metadata: author: RBraga01 version: "1.1" iso-9001: "8.3.4" iatf-16949: "8.3.4.3" domain: quality-engineering subdomain: planning industries: automotive,electronics,aerospace,medical,general status: approved created: "2026-06-06" last_updated: "2026-06-06" updated_by: migmcc reviewed_by: RBraga01 standard_edition: "IATF 16949:2016 §8.3.4.3 / AIAG APQP 2nd Edition"

Design Verification Plan and Report (DVP&R)

When to use

Use this skill when:

  • Creating a DVP for a new part design during APQP Phase 2
  • Reviewing a supplier's DVP for completeness and DFMEA alignment
  • Determining which tests are required for a specific failure mode or design characteristic
  • Tracking test completion and recording results (the "R" in DVP&R)
  • Assessing whether a design change requires additional validation testing

Prerequisites

  • DFMEA with all failure modes identified and AP ratings assigned
  • Engineering drawing with all characteristics defined
  • Customer design specifications and performance requirements
  • List of applicable standards and test methods (customer spec, ISO, SAE, etc.)

Workflow

Step 1 — Understand the DVP structure

The DVP&R is a table with one row per test. Each test must address at least one failure mode or design characteristic from the DFMEA.

The linkage rule: Every H-AP (High Action Priority) failure mode in the DFMEA must have at least one corresponding test in the DVP. If a failure mode has no test, document why (e.g., analysis-only justification with sign-off).

Step 2 — Build each DVP row

ColumnWhat to enter
Test numberSequential reference (e.g., DVP-001)
DFMEA referenceFailure mode number(s) this test addresses
Test name / descriptionSpecific name of the test (not "durability test" — use "salt spray 240h per ASTM B117")
Test specificationStandard or specification number with version (e.g., ASTM B117-19, SAE J2530, customer spec DS-XYZ)
Pass/fail criteriaExact acceptance criteria (e.g., "no rust after 240h", "burst pressure > 150 bar", "dimension within ±0.05 mm")
Sample sizeNumber of parts to test
Who performsInternal lab, external accredited lab, customer lab
PhaseP = Prototype, PL = Pre-launch, PR = Production
Planned dateDate test is scheduled to complete
Actual dateDate test was completed
ResultPass / Fail / In progress
Report referenceLab report number or document reference
CommentsFailures, deviations, re-test requirements

Step 3 — Determine required tests

For each DFMEA failure mode, identify the test category:

Functional / performance tests:

  • Tests that verify the product performs its intended function
  • Examples: burst pressure, tensile strength, electrical resistance, flow rate
  • Must demonstrate the product meets its design intent specifications

Environmental / durability tests:

  • Tests that simulate the product's operating environment over its design life
  • Examples: thermal cycling, salt spray, vibration, UV exposure, humidity
  • Duration and cycles must represent the design life or accelerated equivalent

Safety / regulatory tests:

  • Tests required by law, regulation, or homologation
  • Examples: ECE R10 (EMC), FMVSS standards, ECE R94/R95 (crash), REACH, RoHS
  • Must be performed by accredited lab; results must accompany PPAP

Dimensional / material tests:

  • Verification that design dimensions and material properties are achieved
  • Examples: 3D scan, CMM, tensile test, hardness test, chemical composition
  • Must reference the specific drawing characteristic or material specification

Reliability / life tests:

  • Tests that verify the product meets its reliability target (e.g., B10 life)
  • Examples: fatigue testing, accelerated aging, wear testing
  • Test plan must include correlation between accelerated test and field life

Step 4 — Populate timing per APQP phase

PhaseTests due
Prototype (P)Tests on design concept — functional, dimensional, preliminary environmental
Pre-launch (PL)Tests on tooled parts — full environmental, durability, all safety/regulatory
Production (PR)Confirmation tests on production parts — dimensional, safety, any tests with production-specific requirements

Not all tests need to run in all phases. Focus safety and regulatory tests on Pre-launch or Production parts.

Step 5 — Track completion (the "R" in DVP&R)

Update the DVP after each test:

  • Record actual completion date
  • Record Pass/Fail result
  • For any Fail: log a DFMEA action (or open an 8D if failure escapes to customer)
  • Re-test after corrective action — reference the re-test as a new row with the original DVP number + suffix (e.g., DVP-012-R1)

At PPAP submission: all DVP tests must show "Pass" or have a documented customer-approved deviation. If a test is still in progress at PPAP submission (e.g., a long-duration life test), a formal customer deviation request must be submitted with: the test in progress, the expected completion date, the interim risk assessment, and the customer's written acceptance. The PPAP approval will be conditional until the test completes with a Pass result.

Engineering changes: If the DFMEA is updated during the design phase and adds new H-AP failure modes, the DVP must be updated to cover them before the next gate review. A DVP revision that is behind the current DFMEA revision is a gap — the DVP&R revision must match or exceed the DFMEA revision at PPAP submission.

Step 6 — Audit an existing DVP

When reviewing a supplier's or internal DVP, check:

  • Every H-AP DFMEA failure mode has at least one corresponding test
  • Test specifications reference a specific standard or document (not "internal test")
  • Pass/fail criteria are objective and measurable (not "acceptable appearance")
  • Sample sizes are adequate (not "1 sample" for durability/life tests)
  • Safety and regulatory tests are assigned to an accredited external lab
  • All results show "Pass" (or documented deviations with customer approval)
  • Failed tests have a corresponding DFMEA update or corrective action reference
  • DVP revision is aligned with the current DFMEA revision

Validation criteria

A complete DVP&R for PPAP submission must:

  • Reference every H-AP failure mode from the DFMEA
  • Have specific, standard-referenced test methods (not "per engineering judgement")
  • Show Pass results for all tests (or customer-approved deviations)
  • Have accredited lab reports for all safety/regulatory tests
  • Be signed off by design engineering and quality

Common mistakes

  • DVP created with generic tests not linked to specific DFMEA failure modes
  • Pass/fail criteria defined as "meets spec" without stating what the spec is
  • All tests assigned to internal lab when regulatory tests require external accreditation
  • DVP not updated when DFMEA adds new H-AP failure modes during design reviews
  • Re-tests after failures not documented — original Fail result erased
  • Sample size of 1 for durability or life tests (statistically meaningless)
  • DVP not updated to "Report" status at PPAP — submitted as plan, not results

Output Format

At the start of each use, ask the user:

"How would you like to receive the output? A — Structured Markdown (formatted tables and sections, ready to copy) B — Plain tables (simplified structure for Excel or Word) C — Narrative report (flowing text for a formal document or email)

Default: A."

Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.

Changelog

VersionDateAuthorChange
1.02026-06-06@RBraga01Initial release
1.12026-06-06@migmccAdded guidance for tests in-progress at PPAP submission (customer deviation process); added DVP revision synchronisation with DFMEA requirement
Skills enregistrées