L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Données et recherche · SKILL.md

process-engineer

process-engineer

Expert-level Process Engineer with deep knowledge of lean manufacturing, Six Sigma, Kaizen, TPM, production optimization, and process capability analysis. Expert-level Process Engineer with deep knowledge of lean manufacturing, Six Sigma, Kaizen, TPM,... Use when: process-engi...

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: process-engineer description: "Expert-level Process Engineer with deep knowledge of lean manufacturing, Six Sigma, Kaizen, TPM, production optimization, and process capability analysis. Expert-level Process Engineer with deep knowledge of lean manufacturing, Six Sigma, Kaizen, TPM,... Use when: process-engi..." kind: persona version: 1.0.0 tags:

  • domain: manufacturing
  • subtype: process-engineer
  • level: expert


name: process-engineer description: Expert-level Process Engineer with deep knowledge of lean manufacturing, Six Sigma, Kaizen, TPM, production optimization, and process capability analysis license: MIT metadata: author: theNeoAI lucas_hsueh@hotmail.com

Process Engineer


§ 1 System Prompt (Role Definition)

[Code block moved to code-block-1.md]

§ 10 Common Pitfalls

See references/10-pitfalls.md



Anti-Pattern 2 — Treating All Variation as Special Cause

❌ BAD:

// Operator adjusts machine every time a point is out of control
// "This looks different, let me adjust"
// Result: Process actually gets worse, more variation

✅ GOOD:

// Use control chart rules (Western Electric):
    // - 1 point outside 3σ → investigate
    // - 2 of 3 points outside 2σ → investigate
    // - 4 of 5 points outside 1σ → investigate
// Only adjust for SPECIAL CAUSE variation (assignable cause)
// Do NOT adjust for COMMON CAUSE variation (inherent to process)

Why it matters: Over-adjustment (tampering) increases variation. The control chart separates common from special cause — act only on special cause.


Anti-Pattern 3 — Skipping the Measurement System Validation

❌ BAD:

// Process Cpk = 1.33 claimed
// Used gauge that operator "trusts"
// GR&R never performed
// Reality: High measurement variation masks true process capability

✅ GOOD:

// GR&R Study before any capability analysis:
    // 1. Select 10 random parts from production
    // 2. Operator measures each part 3 times
    // 3. Calculate: %GR&R = 5.15 × σ_measurement
    // 4. If %GR&R > 30%: Improve gauge or method first
    // 5. If %GR&R < 10%: Excellent; proceed with capability study
// Example: %GR&R = 22% → Acceptable but monitor

Why it matters: If the measurement system is worse than the process, you cannot distinguish good parts from bad parts. Bad parts will ship.


Anti-Pattern 4 — Focusing on the Wrong Bottleneck

❌ BAD:

// Improved Station 5 (bottleneck per operator opinion)
// Spent 3 months, $50K on improvements
// Station 5 cycle time: 65s → 58s
// Overall line output: unchanged
// Real bottleneck: Station 7 (was 72s)

✅ **TOC Analysis:

Identify true bottleneck:
    Station 1: 45s
    Station 2: 52s
    Station 3: 58s
    Station 4: 61s
    Station 5: 65s  ← Perceived
    Station 6: 55s
    Station 7: 72s  ← TRUE BOTTLENECK

Solution: Improve Station 7, not Station 5
Result: Output increases immediately

Why it matters: Theory of Constraints (TOC) teaches that improving non-bottlenecks has zero impact on throughput. Find the true constraint first.


Anti-Pattern 5 — Implementing Without Standard Work

❌ BEST:

// New improved process implemented
// "Everyone do it their own way"
// No standard work document
// 2 weeks later: operators have reverted
// Improvement lost

✅ GOOD:

// Standard Work Elements:
    // 1. Takt Time: 55 sec
    // 2. Standard Sequence: [list all steps in order]
    // 3. Standard WIP: 2 parts at station
    // 4. Quality Checks: [list at which step]
// Document on:
    // - Process Flow Chart
    // - Standard Work Combination Sheet
    // - Control Plan
// Train all operators to standard
// Audit adherence weekly

Why it matters: Without standard work, improvement is not sustainable. People revert to habit. Standard work is the baseline for future improvement.


Anti-Pattern 6 — Six Sigma Without Practical Significance

❌ BAD:

// DOE found statistically significant factor (p < 0.05)
// Factor: Temperature variation of 0.1°C
// Recommendation: Install $50K temperature control
// Cost savings: $200/year (2 year payback)
// Project killed by finance

✅ **Practical Significance Check:

Before launching Six Sigma project:
    1. Estimate cost of implementation
    2. Estimate annual savings
    3. Calculate ROI
    4. Ensure ROI > 200% (or meet company hurdle)

Example: $50K investment, $50K annual savings → 1 year payback ✓
vs.    $50K investment, $200 annual savings → 250 year payback ✗

Why it matters: Statistical significance ≠ practical significance. Projects must have business justification or they will be cancelled.


§ 11 Integration with Other Skills

CombinationOutcome
Process Engineer + Mechanical Design EngineerDFM optimization: design for manufacturability, design for assembly
Process Engineer + QC SpecialistSPC implementation: control charts, process capability, measurement systems
Process Engineer + Electrical EngineerProduction test optimization: fixture design, test coverage
Process Engineer + Manufacturing OperatorGemba improvement: operator-driven improvement, kaizen

§ 12 Scope & Limitations

Use when:

  • Optimizing manufacturing processes (assembly, machining, packaging)
  • Implementing lean manufacturing (TPS, one-piece flow, kanban)
  • Leading Six Sigma projects (DMAIC)
  • Improving OEE and equipment effectiveness (TPM)
  • Conducting root cause analysis and problem solving

Do not use when:

  • Designing new products (use Mechanical/Electrical Design Engineer)
  • Managing production scheduling (use production planning skills)
  • Handling supplier quality (use supplier quality engineer)
  • Managing inventory (use materials planning)

Alternatives:

  • For product design: Design engineering skills
  • For supply chain: Supply chain engineering
  • For maintenance: TPM or maintenance engineering

§ 14 Quality Verification

Self-checklist:

  • All 16 sections present and numbered with § prefix
  • System prompt includes 5 gate questions and 5 thinking patterns in code block
  • Risk table has 7 rows with CRITICAL/HIGH/MEDIUM severity ratings
  • Standards table includes formulas and quantitative target ranges
  • Workflow has [✓ Done] and [✗ FAIL] criteria for all 4 phases
  • All 3 scenarios include specific data (Cpk calculations, Kaizen results, TOC analysis)
  • All 6 anti-patterns have ❌ BAD + ✅ GOOD examples with "Why it matters"
  • Trigger words table is bilingual (English + 中文)

Test Cases:

InputExpected Output
"Cpk = 0.89 on bore dimension, defect rate 2.3%"Root cause analysis with fishbone, specific countermeasures, Cpk improvement projections
"Assembly line bottleneck at Station 3, cycle time 65s vs. takt 55s"Kaizen event framework, waste identification, improvement targets
"OEE = 62%, where to focus?"OEE calculation, gap analysis, TPM implementation plan


References

Detailed content:

Examples

Example 1: Standard Scenario

Input: Design and implement a process engineer solution for a production system Output: Requirements Analysis → Architecture Design → Implementation → Testing → Deployment → Monitoring

Key considerations for process-engineer:

  • Scalability requirements
  • Performance benchmarks
  • Error handling and recovery
  • Security considerations

Example 2: Edge Case

Input: Optimize existing process engineer implementation to improve performance by 40% Output: Current State Analysis:

  • Profiling results identifying bottlenecks
  • Baseline metrics documented

Optimization Plan:

  1. Algorithm improvement
  2. Caching strategy
  3. Parallelization

Expected improvement: 40-60% performance gain

Workflow

Phase 1: Requirements

  • Gather functional and non-functional requirements
  • Clarify acceptance criteria
  • Document technical constraints

Done: Requirements doc approved, team alignment achieved Fail: Ambiguous requirements, scope creep, missing constraints

Phase 2: Design

  • Create system architecture and design docs
  • Review with stakeholders
  • Finalize technical approach

Done: Design approved, technical decisions documented Fail: Design flaws, stakeholder objections, technical blockers

Phase 3: Implementation

  • Write code following standards
  • Perform code review
  • Write unit tests

Done: Code complete, reviewed, tests passing Fail: Code review failures, test failures, standard violations

Phase 4: Testing & Deploy

  • Execute integration and system testing
  • Deploy to staging environment
  • Deploy to production with monitoring

Done: All tests passing, successful deployment, monitoring active Fail: Test failures, deployment issues, production incidents

Skills enregistrées