L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

oce-geo-coordination

oce-geo-coordination

Portfolio mapping and model coordination in OpenConstructionERP: the 3D geo hub (Cesium), the coordination hub with clash AI, and geo-anchored projects. Use for multi-project portfolio views and BIM clash workflows.

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: oce-geo-coordination description: "Portfolio mapping and model coordination in OpenConstructionERP: the 3D geo hub (Cesium), the coordination hub with clash AI, and geo-anchored projects. Use for multi-project portfolio views and BIM clash workflows."

Geo Hub & Coordination in OpenConstructionERP

Geo Hub (portfolio map)

  • Projects anchored to real locations on a 3D globe (Cesium 3D Tiles).
  • Each project card carries site map, BIM/DWG/PDF badges and live value.
  • Multi-currency totals grouped by currency — never blended.

Workflow: create a project → set location/region/currency → the globe shows it; drill into the project for BOQ/BIM.

Coordination Hub (clash AI)

  • Combine models (RVT/IFC/DWG/DGN) in one coordination space.
  • Clash detection: automatic clash report between disciplines (structure vs MEP vs architecture).
  • Each clash becomes a task/punch item linked to the model elements — track until resolved.

Workflow: upload models → run clash detection → review clash list → convert clashes to issues → fix and re-run.

Point clouds in the viewer

  • Upload LAS/LAZ/COPC scans (E57 via optional extra) — decimated client-side for smooth viewing.
  • Compare scan vs model for as-built verification.

API patterns

GET /api/v1/geo-hub/projects                # portfolio map data
POST /api/v1/coordination/models            # add model to coordination space
GET /api/v1/coordination/clashes            # clash report

(Endpoint names may vary by module version — check backend/app/modules/*/router.py.)

Best practices

  1. Anchor every project geographically — the portfolio view is the fastest status board.
  2. Run clash detection early (design stage), not after procurement.
  3. Convert clashes to issues immediately; an unowned clash list decays into noise.
  4. Keep currency groups separate in portfolio totals.
Skills enregistrées