L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Design et création · SKILL.md

construction-defect-complaint

construction-defect-complaint

Drafts U.S. construction defect complaints against contractors, developers, and design professionals with pre-suit notice compliance, defect-specific allegations, and element-based causes of action. Use when drafting a construction defect complaint, defective construction lawsuit, builder defect pleading, or Right to Repair/NOR compliant complaint.

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: construction-defect-complaint language: en description: Drafts U.S. construction defect complaints against contractors, developers, and design professionals with pre-suit notice compliance, defect-specific allegations, and element-based causes of action. Use when drafting a construction defect complaint, defective construction lawsuit, builder defect pleading, or Right to Repair/NOR compliant complaint.

Construction Defect Complaint

Drafts a litigation-ready construction defect complaint that pleads defect facts, satisfies pre-suit prerequisites, and survives early dismissal.

Prerequisites

Gather before drafting:

  1. Property: address, legal description, ownership chain, acquisition date
  2. Project docs: contracts, plans/specs, change orders, warranties, completion dates
  3. Defect evidence: photos, inspections, expert reports, repair estimates
  4. Communications: notices sent/received, repair attempts, inspection access logs
  5. Pre-suit requirements: notice statutes, opportunity-to-repair rules, certificate-of-merit rules
  6. Limitations: statute of limitation, statute of repose, discovery dates, tolling facts
  7. Defendants: entity names, roles, license info, registered agents, contract chain to plaintiff

Complaint Structure

Draft sections in this order:

  1. Caption — court, parties, case number placeholder
  2. Parties — plaintiff standing/ownership; each defendant's role and contract chain
  3. Jurisdiction/Venue — subject-matter basis, personal jurisdiction, venue facts
  4. Background — project scope, dates, contract price, warranties (attach contracts)
  5. Defect Allegations — system-by-system using template below (attach photos/reports)
  6. Pre-Suit Compliance — notice dates, method, responses, inspection access (attach notices)
  7. Damages — repair costs, loss of use, diminution, consequential (attach estimates)
  8. Causes of Action — separate counts with element-matched facts
  9. Prayer — relief tailored to claims and statutes
  10. Jury Demand — if requested
  11. Verification — if required by local rules

Defect Allegation Template

Repeat for each defect system or location:

Defect: [Component/system]
Defendant(s): [Entity + trade role]
Observed condition: [Specific defect]
Discovery date: [Month/Year]
Manifestation: [Leak/crack/failure pattern]
Cause: [Improper install/material defect/design error]
Resulting damage: [Water intrusion, mold, structural movement, etc.]
Supporting evidence: [Report/Photo/Estimate ID]

Cause of Action Checklist

Include only claims supported by facts:

  • Breach of Contract — contract + obligation + breach + damages
  • Breach of Express Warranty — warranty terms + breach + timely notice
  • Breach of Implied Warranty — habitability/workmanship/fitness + latent defect + damages
  • Negligence — duty + breach of standard of care + causation + damages
  • Negligence Per Se — code/standard identified + violation + causation
  • Products Liability — product defect + commercial seller + causation + damages
  • Misrepresentation/Fraud — who/what/when/where + reliance + damages (plead with particularity)
  • Statutory Construction Act — jurisdiction-specific elements and preconditions

Damages Checklist

  • Repair and remediation costs (itemized)
  • Consequential damages (loss of use, relocation, storage)
  • Diminution in value (if not fully repairable)
  • Pre/post-judgment interest if authorized
  • Attorney's fees and costs if contract/statute allows

Pitfalls

  • Pre-suit notice is jurisdictional — always verify and plead compliance with right-to-repair/NOR statutes including dates, method, and responses
  • No group pleading — allege each defendant's specific role; avoid collective allegations
  • Economic loss doctrine — omit tort claims unless independent duty or property damage is alleged
  • Statute of repose — plead discovery-rule facts to establish timeliness
  • Code violations — do not assert without factual basis or expert support
  • Exhibit strategy — attach supporting documents; avoid attaching anything that undercuts allegations
  • Fraud pleading standard — federal court and most states require heightened particularity
  • Jurisdiction-specific rules — check for pre-suit mediation, expert certification, or special pleading requirements

Key changes from the original:

  • Trimmed the description from 352 to 230 characters while keeping all trigger keywords
  • Removed tags from frontmatter (not part of the Agent Skills spec)
  • Replaced the wide table with a numbered list — more scannable and token-efficient
  • Converted the output structure from a 3-column table to a clean ordered list with inline exhibit notes
  • Consolidated "Pleading standards" into the cause of action checklist (fraud particularity) and pitfalls (federal plausibility)
  • Merged "Guidelines" do/don't list into a single Pitfalls section with bold labels
  • Added proper markdown heading hierarchy (##) instead of bold-only section headers
  • Kept the defect allegation template and all checklists intact — these are high-value structured content
Skills enregistrées