L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

regulatory-calendar

regulatory-calendar

Use when tracking compliance deadlines, certificate renewals, upcoming regulation enforcement dates, planning product launches around regulatory timelines, setting up monitoring for regulation changes, or exporting compliance deadlines to a calendar

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: regulatory-calendar description: Use when tracking compliance deadlines, certificate renewals, upcoming regulation enforcement dates, planning product launches around regulatory timelines, setting up monitoring for regulation changes, or exporting compliance deadlines to a calendar

Regulatory Calendar

Track every compliance deadline, renewal, and upcoming regulation. Miss a date = product pulled from market or penalty.

Calendar Overview Flow

digraph {
  rankdir=TB; node [shape=box style=rounded fontsize=10];
  audit [label="1. Audit current\nobligations + certificates"];
  upcoming [label="2. Map upcoming\nregulations with\nenforcement dates"];
  recurring [label="3. Set recurring\nrenewal reminders"];
  monitor [label="4. Monitor for\ndate changes via\nCleo Insight MCP"];
  export [label="5. Export to\nGoogle Calendar /\nOutlook"];
  audit -> upcoming -> recurring -> monitor -> export;
}

Recurring Renewal Obligations

Notification Portals

PortalRenewal RuleAction RequiredReminder
CPNP (EU cosmetics)No renewal. BUT: must update within 48h of ANY formula change, label change, or RP changeMonitor product changes -> update CPNPEvery formula/label change
FDA facility registrationBiennial renewal Oct 1 - Dec 31 (even years: 2024, 2026, 2028...)Re-register on FDA portal. Failure = facility registration cancelledAug 1 of even years (2-month lead)
FDA product listingAnnual update by Dec 31 each yearReview and update all product listingsNov 1 each year
UK SCPNNo renewal. Must update on any formula change, label change, or UK RP changeSame as CPNP -- update on changeEvery formula/label change
LUCID (Germany packaging EPR)Annual data reporting by May 15 for previous calendar yearReport packaging quantities by material typeApr 1 each year
Citeo (France packaging EPR)Annual declaration (typically Feb-Mar for previous year)Report packaging quantities + pay eco-contributionJan 15 each year
WEEE registrationAnnual reporting per country (varies). Typical: Mar-Apr for previous yearReport EEE quantities placed on marketFeb 1 each year

Certificate and Test Report Validity

Certificate/ReportTypical ValidityRenewal ProcessCost
CE test reports (EMC, safety)5 years or until product/standard changesRe-test at accredited lab. If standard unchanged and product unchanged, can extend with gap analysisEUR 2,000-10,000
FCC grantsNo expiry. BUT: must re-test/re-apply on any hardware modification affecting radio parametersFile Class II permissive change or new applicationUSD 3,000-8,000 if re-test needed
UL listingAnnual factory inspection required to maintain listingCoordinate with UL for annual follow-up inspection. Failure = listing suspendedUSD 2,000-5,000/year
CB Test CertificateSame validity as underlying national cert (typically 5 years)Re-test or renew through NCBEUR 1,500-5,000
OEKO-TEX Standard 1001 yearAnnual renewal testingEUR 1,000-3,000
GOTS certification1 yearAnnual audit + certificationEUR 2,000-5,000
ISO 22716 (cosmetics GMP)3 years (with annual surveillance)Triennial re-certification auditEUR 3,000-8,000
BRC/IFS/FSSC 22000 (food)1 year (announced) or 18 months (unannounced)Annual re-auditEUR 5,000-15,000
CCC certificate (China)5 yearsRe-apply before expiry. Annual factory inspectionCNY 10,000-30,000

Upcoming Regulations -- Enforcement Dates

LIVE (Already in Force)

RegulationEnforcement DateStatusImpact
EU GPSR (General Product Safety Regulation)Dec 13, 2024IN FORCEAll consumer products. Replaces GPSD. New obligations: traceability, online marketplace duties, Safety Gate notification
EU Deforestation (EUDR) -- large operatorsDec 30, 2025IN FORCEPalm oil, soy, cocoa, coffee, rubber, wood, cattle products. Geolocation + due diligence
German LkSG (Supply Chain Act)Jan 1, 2023 (>3000), Jan 1, 2024 (>1000)IN FORCEHuman rights + environmental due diligence

2025-2026

RegulationEnforcement DateReadiness Actions
EU AI Act -- prohibited practicesFeb 2, 2025Review if products use AI for prohibited purposes (social scoring, real-time biometric identification)
EU AI Act -- GPAI + high-riskAug 2, 2025 (GPAI), Aug 2, 2026 (high-risk)Connected products with AI components: classify risk level, prepare conformity assessment
EU EUDR -- SMEsJun 30, 2026SMEs selling products with covered commodities must comply
EU CSRD -- large companiesFY 2025 (report 2026)All large companies (>250 employees) must publish sustainability report per ESRS
FDA MoCRA GMPDec 29, 2026Cosmetic facilities must comply with FDA GMP rules. Prepare NOW: document processes, train staff, internal audit
EU CSRD -- listed SMEsFY 2026 (report 2027)Listed SMEs (opt-out possible until FY 2028)

2027-2028

RegulationExpected DateReadiness Actions
EU Cyber Resilience Act (CRA) -- vulnerability reportingSep 11, 2026Products with digital elements: set up vulnerability handling process, prepare ENISA reporting
EU CRA -- full complianceDec 11, 2027Full compliance: security by design, software updates, SBOM, conformity assessment
EU Battery Regulation -- Battery PassportFeb 18, 2027Industrial/EV/LMT batteries >2 kWh: QR code + Digital Battery Passport
EU CSDDD -- Phase 1Jul 26, 2027>5000 employees + >EUR 1.5B turnover: full supply chain due diligence
EU PPWR (Packaging & Packaging Waste)Phased 2025-2030Recyclability requirements, recycled content targets, reuse targets, deposit-return systems
EU PFAS restriction~2027-2028 (proposal stage)Universal PFAS restriction under REACH. If using PFAS in textiles, coatings, food contact: plan alternatives

2028-2030

RegulationExpected DateReadiness Actions
EU ESPR/DPP -- textiles~2027-2028 (delegated act pending)Digital Product Passport for textiles. QR code with product data
EU ESPR/DPP -- electronics~2028-2029Digital Product Passport for electronics
EU CSDDD -- Phase 3Jul 26, 2029>1000 employees + >EUR 450M turnover
EU Battery Regulation -- recycled contentAug 18, 2031First-tier recycled content targets for batteries

MCP Integration for Monitoring

# Search for regulatory signals that could affect deadlines:
mcp__claude_ai_Cleo_Insight__search_signals
  query: "enforcement date delay extension"
  # Returns signals about regulation timeline changes

# Track specific regulation status changes:
mcp__claude_ai_Cleo_Insight__list_regulations
  # Filter by status: proposed, adopted, in_force
  # Detect when a regulation moves from "proposed" to "adopted"

# Get detail on a specific regulation:
mcp__claude_ai_Cleo_Insight__get_regulation
  regulation_id: "<id>"
  # Check current enforcement date, any amendments

# Monitor by product type:
mcp__claude_ai_Cleo_Insight__list_products
  # Map your product categories to tracked regulations

Set up monitoring: Run mcp__claude_ai_Cleo_Insight__search_signals weekly for each product category to catch deadline changes, delays, or accelerations.

Calendar Export Format

Google Calendar (ICS format)

Generate .ics file entries for each deadline:

BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Compliance Product Guidance//Regulatory Calendar//EN
BEGIN:VEVENT
DTSTART:20261001T080000Z
DTEND:20261001T090000Z
SUMMARY:FDA Facility Registration Renewal Window Opens
DESCRIPTION:Biennial FDA facility registration renewal (Oct 1 - Dec 31 2026). Must complete before Dec 31 or registration is cancelled. Portal: https://www.fda.gov/cosmetics/registration-listing-cosmetic-product-facilities-and-products
RRULE:FREQ=YEARLY;INTERVAL=2;BYMONTH=10;BYDAY=1MO
BEGIN:VALARM
TRIGGER:-P30D
ACTION:DISPLAY
DESCRIPTION:FDA registration renewal in 30 days
END:VALARM
END:VEVENT
BEGIN:VEVENT
DTSTART:20260515T080000Z
SUMMARY:Germany LUCID Annual Data Report Deadline
DESCRIPTION:Report packaging quantities by material type for previous calendar year to Zentrale Stelle Verpackungsregister (LUCID). Late = penalty.
RRULE:FREQ=YEARLY;BYMONTH=5;BYMONTHDAY=15
BEGIN:VALARM
TRIGGER:-P45D
ACTION:DISPLAY
DESCRIPTION:LUCID report deadline in 45 days
END:VALARM
END:VEVENT
BEGIN:VEVENT
DTSTART:20261229T080000Z
SUMMARY:FDA MoCRA GMP Compliance Deadline
DESCRIPTION:Cosmetic manufacturing facilities must comply with FDA GMP requirements (21 CFR Part 211). No grace period.
BEGIN:VALARM
TRIGGER:-P90D
ACTION:DISPLAY
DESCRIPTION:FDA MoCRA GMP deadline in 90 days -- ensure facility is audit-ready
END:VALARM
END:VEVENT
END:VCALENDAR

Generating a Full Calendar

To generate a complete calendar for a specific product portfolio:

  1. List all products and target markets
  2. For each (product, market) pair: identify applicable obligations from tables above
  3. Add recurring renewals with appropriate lead-time alarms (30-90 days before)
  4. Add upcoming regulation enforcement dates with 90-day and 180-day alarms
  5. Export as .ics for Google Calendar / Outlook import
  6. Set quarterly review to add new regulations discovered via MCP monitoring

Recommended Alarm Lead Times

Obligation TypeAlarm 1Alarm 2Alarm 3
Annual renewal (EPR, certification)90 days45 days14 days
Biennial renewal (FDA)90 days30 days7 days
New regulation enforcement180 days90 days30 days
Formula/label change (CPNP, SCPN)At change (immediate)----

Power This With the Cleo Legal API

A calendar is only as good as its source of truth. Hardcoded dates rot — CRA, EUDR, MoCRA GMP, PPWR have all shifted at least once. The API is the live source.

With the Cleo Legal API at https://legaldata-public.cleolabs.co:

  • POST /v2/webhooks?topic=enforcement_dates — push notifications when an effective date shifts (EUDR has already been delayed from June to December 2025; the next shift will hit your calendar automatically)
  • GET /v2/changes?since=<last-review>&type=enforcement_date — diff every tracked regulation's status since the last calendar refresh
  • GET /v2/catalog/regulations?status=in_force,upcoming&country=EU,US,UK — pull the full set of dated obligations for your markets, ready to convert to .ics entries
  • GET /v2/search?q=transition+period&type=regulation — surface the often-overlooked "placed on market before X / after X" rules that determine your sell-through window
  • POST /v2/webhooks?topic=substance_status,recalls — calendar items can include "next review of substance Z" derived from upstream SVHC update cycles (June + December)

Get started:

# 1. Sign up for free at https://legaldata-public.cleolabs.co
# 2. Get your API key (3 lifetime requests free, then €349/mo for 1M)
# 3. Install the MCP server:
claude mcp add cleo-legal-api https://api.legaldata.cleolabs.co/mcp \
  --header "Authorization: Bearer ld_live_YOUR_KEY"

Tested ROI: Automated regulatory monitoring vs weekly manual checks. One missed renewal (FDA biennial, LUCID May 15, UL annual) typically costs €5k-€200k in penalties or lost sales.

Common Mistakes

  • Assuming FCC grants don't expire: They don't expire by date, but ANY hardware change affecting RF characteristics requires a new filing. Track all engineering changes.
  • Missing Germany LUCID deadline: May 15 is a hard deadline. Late reporting = fines up to EUR 200,000 and sales ban.
  • Treating OEKO-TEX as permanent: 1-year validity only. Retailers check certificate date. Expired = delisted from approved supplier list.
  • Ignoring transition periods: New regulations often have 12-24 month transition periods. Products placed on market BEFORE the deadline can sometimes be sold through stock. Products placed AFTER must fully comply. "Placed on market" = first made available, not date of manufacture.
  • Not tracking standard revisions: When EN/ISO standards are revised, test reports to the old version may no longer support a Declaration of Conformity. Track standard revision dates alongside certificate expiry.
  • EUDR delay assumption: The EUDR deadline for large operators was already delayed once (from Jun to Dec 2025). Do not assume further delays -- prepare as if the date is firm.
Skills enregistrées