L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

icalp-workflow

icalp-workflow

Use when planning an ICALP (EATCS) campaign backward from its single annual February deadline, through abstract registration, the anonymous submission, the Track B rebuttal window, the April notification, and the LIPIcs camera-ready and presentation, and when coordinating a full-version (arXiv/ECCC) release alongside the anonymous submission.

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: icalp-workflow description: Use when planning an ICALP (EATCS) campaign backward from its single annual February deadline, through abstract registration, the anonymous submission, the Track B rebuttal window, the April notification, and the LIPIcs camera-ready and presentation, and when coordinating a full-version (arXiv/ECCC) release alongside the anonymous submission.

ICALP Workflow

Run the ICALP year backward from the single annual February deadline. ICALP posts one research-paper deadline per year across its two tracks, so unlike a multi-deadline venue there is no "next cycle in a few months" — a missed February means a full year lost. The calendar below is the ICALP 2026 (53rd, Royal Holloway) cycle, verified 2026-07-09; reopen the live Important Dates page and the correct track's HotCRP deadline before trusting any date.

The one-cycle calendar (ICALP 2026 anchor)

[early February]  Abstract registration (2026: 3 Feb, AoE) — title/abstract/authors/conflicts
[~3 days later]   Full submission     (2026: 6 Feb, AoE) — anonymized 15-page PDF + appendix
[late March]      Track B rebuttal    (2026: 21-24 Mar) — Track B only; Track A no general rebuttal
[late April]      Notification        (2026: 20 Apr)
[spring]          Camera-ready in LIPIcs (lipics-v2021); exact date 待核实 per cycle
[July]            Conference          (2026: 7-10 Jul, workshops 6 Jul), Royal Holloway

Backward plan from the February deadline

  • T-12 to T-8 weeks: prove the theorems. ICALP results are proofs, and a proof is not "almost done" until it is written in full — budget for the gap between "I believe it" and "it is on paper."
  • T-6 weeks: decide the track (icalp-topic-selection) and settle the model and theorem statements; these anchor the whole paper.
  • T-4 weeks: draft the 15-page body and the full proofs in the appendix / full version in parallel; the body sketches, the appendix proves (icalp-supplementary).
  • T-2 weeks: anonymize for lightweight double-blind, rewrite self-citations in third person, and prepare (but do not necessarily post) the arXiv/ECCC full version.
  • T-1 week: register the abstract; run icalp-submission on the near-final PDF.
  • Deadline day: submit to the correct track's HotCRP server well before the AoE cutoff; flag student-only authorship if eligible.

The Track B rebuttal (know if it applies to you)

The tracks diverge after submission:

  • Track A: no general rebuttal. Authors are contacted only if reviewers find a correctness issue to resolve. Plan as if there is no author interaction.
  • Track B: a rebuttal window (2026: 21-24 March) where authors view initial reviews and respond. Reserve those days; see icalp-author-response.

Do not assume both tracks behave alike, and do not count on a rebuttal for a Track A paper.

Coordinating the full version

  • A full version on arXiv/ECCC/HAL is standard and encouraged — it is how the community checks proofs the 15-page body only sketches. But during review, keep it from breaking anonymity (do not cite "our arXiv paper"); a separately hosted full version that a determined reviewer could find is acceptable under the lightweight regime, but do not advertise it.
  • Post or update the public full version around notification/camera-ready, and make the LIPIcs version and the arXiv version consistent.

After notification

  • Accept: move to icalp-camera-ready — reformat to lipics-v2021, restore author names and acknowledgements (de-anonymize), and hit the LIPIcs production deadline. Arrange for at least one author to present.
  • Reject: no appeal. Use icalp-topic-selection's routing table — a strong result may fit STOC/FOCS/SODA/LICS or a journal on a nearer calendar; incorporate the reviews before resubmitting.

Milestone checklist

[ ] Track chosen and correct HotCRP server identified
[ ] Theorems fully proved (not just believed)
[ ] Abstract registered before the earlier February cutoff
[ ] 15-page body + complete appendix/full-version proofs
[ ] Lightweight double-blind sweep passed
[ ] Track B: rebuttal window reserved (Track A: none expected)
[ ] On accept: LIPIcs camera-ready + presenter arranged

Output format

[Cycle target] ICALP <year>, Track A / Track B
[Countdown] weeks to the February deadline; abstract-registration date
[Current stage] proving / drafting / anonymizing / submitted / rebuttal (B) / notified / camera-ready
[Track-specific] Track B rebuffer window reserved? / Track A correctness-contact readiness
[Next actions] <ordered, with dates tied to the single annual deadline>
Skills enregistrées