L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Productivité · SKILL.md

manage-project

manage-project

Use when managing a manuscript project over time. Scaffolds the project structure, tracks writing progress across phases, maintains project memory files, and generates submission checklists and backwards timelines (commands init, status, sync-memory, checklist, timeline).

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: manage-project description: Use when managing a manuscript project over time. Scaffolds the project structure, tracks writing progress across phases, maintains project memory files, and generates submission checklists and backwards timelines (commands init, status, sync-memory, checklist, timeline). metadata: triggers: "manage project, project init, project status, submission checklist, project scaffold, create project, new paper project"

Manage-Project Skill -- Research Project Management

Commands

/manage-project init {name} --type {type} --journal {journal} [--ssot] [--zotero-collection NAME]

Parameters:

  • {name} -- Project identifier (e.g., nnunet-skull-fracture, rfa-meta-analysis)
  • --type -- Paper type: original | meta | case | animal | technical | ai_validation | letter
  • --journal -- Target journal: RYAI | AJR | Radiology | European_Radiology | KJR | INSI | AJNR | generic
  • --ssot -- Emit SSOT.yaml (schema v1) from templates/SSOT.yaml.template instead of legacy project.yaml. Required, but not sufficient, for Phase 1C auto-enforce (the PostToolUse verify-refs hook blocks instead of warns): enforce also needs qc/migration_complete, which init does not write. After init, run migrate_project_to_ssot.py --project-root {target_dir} --mark-complete to validate the SSOT.yaml and write the marker. New projects should pass --ssot; legacy in-flight projects stay on project.yaml until /manage-project migrate-ssot is run.
  • --zotero-collection NAME -- Optional. Create a Zotero collection via pyzotero and populate library_id + collection_key in the contract. Requires ZOTERO_API_KEY + ZOTERO_LIBRARY_ID (optionally ZOTERO_LIBRARY_TYPE, default user). With pyzotero or the credentials missing, the contract is scaffolded with library_id: null / collection_key: null and a WARN is printed.

SSOT template substitutions: {{PROJECT_ID}} → {name}; {{PROJECT_TYPE}} → the SSOT project_type enum mapped from --type (original → original_research, meta → meta_analysis, case → case_report, ai_validation → ai_validation, else other). Without --zotero-collection, library_id / collection_key stay null until the owner links an existing collection.

Run scripts/init_project.py:

python3 "${CLAUDE_SKILL_DIR}/scripts/init_project.py" \
    --name {name} --type {type} --journal {journal} [--ssot] \
    --project-root {target_dir}

It writes the contract file (SSOT.yaml with --ssot, else legacy project.yaml), the directory scaffold, the minimal stubs scripts/validate_project_contract.py requires (manuscript/index.qmd, artifact_manifest.json, qc/status.json), the memory-file stubs, and project_state.json. qc/migration_complete is NOT written by init — that marker belongs to the migrate script. For an --ssot project, run it with --mark-complete (no project.yaml needed): it validates the existing SSOT.yaml and writes the marker only on PASS. Until then the reference hook stays in warn mode.

Do not hand-build the scaffold. The script is the source of truth for the tree and for project_state.json; a hand-built one drifts from what the contract validator expects. Read ${CLAUDE_SKILL_DIR}/references/init_scaffold.md only when you need to know where a scaffolded file lands or what a project_state.json field means.

After the script, copy the matching reporting-guideline checklist from ${CLAUDE_SKILL_DIR}/../check-reporting/references/checklists/ into references/checklist_{GUIDELINE}.md.

/manage-project migrate-ssot [--no-mark-complete]

Converts a legacy project.yaml project into SSOT.yaml form and, by default, touches qc/migration_complete so Phase 1C auto mode switches from warn to enforce. On an SSOT-native project (SSOT.yaml present, no project.yaml — e.g. init --ssot) there is nothing to convert: --mark-complete validates the existing SSOT.yaml and writes the marker on PASS; SSOT.yaml is not rewritten.

python3 "${CLAUDE_SKILL_DIR}/scripts/migrate_project_to_ssot.py" \
    --project-root . --write --mark-complete
  • --no-mark-complete: run with --write only. Use it when the project still has open QC failures — enforcement is deferred until the migration is validated.
  • The migrate script refuses to touch qc/migration_complete unless the generated SSOT.yaml passes validate_project_contract.py AND contract_mode=ssot. Do not touch qc/migration_complete manually.

Re-run after resolving failures; the script is idempotent.

/manage-project status

Report current progress: read project_state.json, scan the existing files, and check whether the project memory files are present and aligned. Take word-count limits from the target journal's profile, ${CLAUDE_SKILL_DIR}/../write-paper/references/journal_profiles/{JOURNAL}.md, not from memory. Lay the report out as in ${CLAUDE_SKILL_DIR}/references/status_output_format.md.

/manage-project sync-memory

Audit and refresh the project memory files:

  • check for PROJECT.md, STATUS.md, CLAIMS.md, DATA_DICTIONARY.md, ANALYSIS_PLAN.md, REVIEW_LOG.md
  • identify stale or contradictory project metadata
  • propose the minimum files to create or update; create them from ${CLAUDE_SKILL_DIR}/references/scaffold_templates.md
  • align project_state.json with the current manuscript phase

/manage-project checklist

Read the pre-submission checklist from ${CLAUDE_SKILL_DIR}/references/pre_submission_checklist.md and write it to submission/pre_submission_checklist.md. Then recommend /self-review (manuscript quality gate), /verify-refs (citation verification) and AI pattern removal (/write-paper Phase 7).

/manage-project timeline {submission_date}

Generate a backwards timeline from the submission date, in the layout of ${CLAUDE_SKILL_DIR}/references/timeline_example.md.


Project State Conventions

Phase numbers:

  • 0 = Init (scaffold created)
  • 1 = Outline approved
  • 2 = Table/Figure shells approved
  • 3 = Methods (critic >= 85)
  • 4 = Results (critic >= 85)
  • 5 = Discussion (critic >= 85)
  • 6 = Introduction + Abstract (critic >= 85)
  • 7 = Polish complete (AI pattern removal + checklist + self-review >= 80)

Phase status values: pending | in_progress | complete | blocked

Skills enregistrées