L’interface est localisée ; les présentations et documents des Skills sont traduits automatiquement par IA dans votre langue. Le code, les commandes, chemins et termes techniques restent en version originale, et le document de l’auteur fait foi.
Explorer les Skills
Développement · SKILL.md

quantity-takeoff-calculator

quantity-takeoff-calculator

Construction quantity takeoff skill for concrete, steel, earthwork, and materials

Independent GitHub snapshot · Automated classification · Original documentation governs

Documentation de la Skill

GitHub

name: quantity-takeoff-calculator description: Construction quantity takeoff skill for concrete, steel, earthwork, and materials allowed-tools:

  • Read
  • Write
  • Glob
  • Grep
  • Edit
  • Bash metadata: specialization: civil-engineering domain: science category: Construction Management skill-id: CIV-SK-026 graph: domains: [domain:civil-engineering] skillAreas: [skill-area:mathematical-reasoning, skill-area:computational-geometry, skill-area:data-analysis] roles: [role:systems-integration-engineer, role:research-engineer]

Quantity Takeoff Calculator Skill

Purpose

The Quantity Takeoff Calculator Skill calculates construction quantities including concrete volumes, steel weights, earthwork quantities, and material takeoffs from drawings or BIM models.

Capabilities

  • Concrete volume calculation
  • Steel weight calculation
  • Earthwork quantities
  • Pipe and conduit lengths
  • Area calculations (formwork, finishes)
  • Unit conversion
  • Waste factor application
  • BIM-based takeoff

Usage Guidelines

When to Use

  • Estimating project quantities
  • Supporting cost estimates
  • Verifying contractor quantities
  • Planning material procurement

Prerequisites

  • Design documents available
  • Takeoff categories defined
  • Unit system established
  • Waste factors identified

Best Practices

  • Use consistent methods
  • Document measurement rules
  • Apply appropriate waste factors
  • Cross-check critical items

Process Integration

This skill integrates with:

  • Construction Cost Estimation
  • Specifications Development

Configuration

quantity-takeoff-calculator:
  categories:
    - concrete
    - steel
    - earthwork
    - masonry
    - piping
  sources:
    - bim-model
    - drawings
    - cad
  units:
    - imperial
    - metric

Output Artifacts

  • Quantity summaries
  • Material takeoffs
  • Cost backup data
  • BOM reports
Skills enregistrées