name: common-decision-discipline
description: Right-size, ground, and gate SDLC decisions with SNC-sized depth, said-vs-assumed write-back, an evidence ledger, honest option cards, recorded approval, and self-review. Use when running brainstorm-feature, plan-feature, design-solution, or system-design-session.
guardrail: true
metadata:
triggers:
files: []
keywords:
- decision brief
- delivery contract
- compare approaches
- evidence ledger
- approval state
- option trade-offs
- shape a direction
Decision Discipline
Priority: P0 (CRITICAL)
Trustworthy decisions are sized to the work, grounded in evidence, and approved on the record.
1. Size The Work
| SNC tier | Depth | Artifact |
|---|
tier=low (0-2) | Quick | Contract in chat, no file; approval in the Handoff Payload |
tier=medium (3-4) | Standard | Core brief file |
tier=high (5-6) | Deep | Full brief; decompose multi-subsystem ideas first; optional specialist-architecture-guard review |
- Score with
common-task-complexity-routing; label as inference until scouted.
- Downward complexity reassessment requires documented new evidence (e.g., scouted blast radius proves isolated scope), never to bypass unresolved risk, required approvals, or the sensitive-change risk floor.
- Sensitive-Change Risk Floor: Auth, money, data integrity, or trust boundaries enforce minimum
tier=medium regardless of arithmetic SNC total; non-zero novelty or spread (S≥1 or N≥1 with C=2) escalates to tier=high.
- Low-Risk Maintenance: Sufficiently specified routine fixes or maintenance may use an in-chat contract rather than creating BRD/PRD/SRS files. Preserve full traceability for governed or high-risk delivery.
- Downstream specialist workers execute against their assigned briefs; do not reload or repeat parent intake in specialists.
- A symptom without a root cause routes to
dev-fix; never compare fixes for an undiagnosed bug.
2. Shared Understanding
- Draft first, then write back two lists: You said and I assumed. Allow one correction round.
- Skip the write-back when outcome, constraints, non-goals, and acceptance criteria are already stated; confirm in one line.
- Reuse an accepted contract; never reopen it.
3. Evidence Ledger
- Tag every feasibility, AS-IS, or current-behavior claim:
confirmed(<path>), assumed, or unknown.
- Read the smallest useful set of code, tests, docs, and existing
docs/brd|prd|srs before calling an option feasible.
- Resolve what evidence can settle; label only what stays unknowable. Format:
references/evidence-ledger.md.
4. Questions
- Ask only when the answer changes the result, safety boundary, or public contract.
- Max 3 per round, each with a recommended default and 2-3 options.
- Never re-ask a settled fact. Never ask the operator to re-authorize approved work.
- For
operator_profile=business, every question is answerable by "go with your suggestion".
5. Options
- 0-3 options, only when a real choice exists. A single viable path is stated as the path, not padded.
- Each option card names its load-bearing assumption, first failure condition, worst plausible case, and cost to abandon (
references/option-card.md).
- Recommend the smallest option that satisfies the contract. When a critical assumption is unresolved, recommend the option cheapest to abandon.
- Cut unrequested scope; keep all requested scope.
6. Approval State
approval: pending | approved(<who>, <YYYY-MM-DD>) | assumed-autonomous.
- Interactive: end with "Reply ok or corrections". An ok approves only the artifact presented.
- Autonomous or channel mode without an interactive reply channel: set
assumed-autonomous and continue; tier=high still blocks pending explicit human sign-off.
7. Publication vs Activation
- Record
repository_status and activation_status separately; use not_required when activation is outside the contract.
- Do not require an external VM/runtime artifact for approved repository-only publication unless the contract requires it.
- After approval, continue through the accepted deliverable; do not ask to continue at each phase boundary.
- Publication approval never grants merge, deploy, or runtime-change authority. Gate consequential actions on explicit matching approval and scope.
8. Self-Review Before Handoff
- Check placeholders (TBD, TODO), contradictions, multi-plan scope, and two-reading ambiguities.
Red Flags
Stop when thinking: "too simple to need a brief", "they said implement, so skip intake", "list three options to look thorough", "approval to publish means deploy". Each is a rationalization, not a reason.
Anti-Patterns
- No unlabeled claims: every AS-IS or feasibility statement carries an evidence tag.
- No padded options: never invent alternatives to reach three.
- No silent approval: a brief without
approval is incomplete.
- No reopened decisions: settled facts are carried forward, not re-asked.
- No scope transfer: publication approval does not authorize merge, deployment, or runtime activation.
References