writing-skills
writing-skills
Use when creating new skills, editing existing skills, or verifying skills work before deployment
sigmod-topic-selectionUse when judging whether a project belongs at SIGMOD's research track, comparing it against PVLDB's rolling model, ICDE, PODS, KDD, CIDR, and TODS, weighing the industrial track for deployment papers, and testing whether the contribution is genuinely a data-management result rather than an application that touches data.
Independent GitHub snapshot · Automated classification · Original documentation governs
SIGMOD's research track wants contributions to data management — storage, query processing, transactions, data integration, systems for and with ML, data engineering at scale — where the advance would matter to someone building or theorizing a data system. The commonest misroute is the application paper that uses databases heavily but advances only its application. Run the fit test before any writing investment.
State the contribution in one sentence and inspect the direct object. "We make query optimization better under X" is SIGMOD-shaped. "We make fraud detection better using a database" is not, unless the fraud workload forced a reusable data-management technique — in which case that technique is the paper.
| Signal in the project | Better home | Why |
|---|---|---|
| Data-management advance, evaluation ready now | SIGMOD round or PVLDB | Pick by calendar and model, below |
| Formal semantics, complexity, lower bounds | PODS | Co-located theory sibling with its own PC |
| Mining/ML method where data infra is incidental | KDD or an ML venue | SIGMOD PCs route these out fast |
| Provocative architecture vision, thin evaluation | CIDR | Evidence bar differs by design |
| Deployed-system experience, lessons, scale war stories | SIGMOD industrial track | Needs ≥1 non-academic author; separate CFP |
| Mature line needing definitive long-form treatment | TODS | Journal pace; also invites best SIGMOD papers |
| Broad data-engineering result, DB framing weak | ICDE | Same community, different flagship |
The two flagships overlap almost completely in scope; the choice is mechanical, and worth making deliberately:
If the contribution's strength is that it runs in production — scale, operational lessons, design retrospectives of a shipped engine — the industrial track evaluates it on those terms, while the research track would demand novelty the deployment story may not carry. Requirements differ (non-academic co-author, separate deadline calendar, own PC), and the SIGMOD 2027 industrial CFP was not yet posted as of 2026-07-08 — verify before planning around it.
Beyond the CFP's topic list, three observable signals calibrate fit:
resources/exemplars/library.md) consistently honors work that changed
what systems do, not what benchmarks report.Quick probe: title your paper, then find five PACMMOD/PVLDB papers from
the last two years that would cite it. Cannot name five -> the fit
problem is upstream of the writing.
A fictional team builds learned cardinality estimation into a production cloud optimizer. Three legitimate papers hide inside: the estimation technique with guarantees and controlled evaluation (SIGMOD research or PVLDB); the deployment retrospective with fleet-scale lessons (SIGMOD industrial); the formal analysis of when learned estimators can beat histograms (PODS). Shipping all three as one manuscript serves none of the three PCs — and PACMMOD's overlap rule means the split must be genuine, with disjoint results.
[Fit verdict] research track / industrial track / neighbor venue
[Primitive] the data-management object the paper advances
[One-sentence claim] with the direct object underlined
[Venue race] time-to-verdict SIGMOD round vs. PVLDB gate
[Split risk] salami-slicing vs. legitimate multi-paper plan
[Next step] write / re-scope / re-route, with rationale