Die Oberfläche ist lokalisiert; Skill-Beschreibungen und -Dokumente werden per KI automatisch in Ihre Sprache übersetzt. Code, Befehle, Pfade und Fachbegriffe bleiben im Original, maßgeblich ist das Dokument des Autors.
Skills entdecken
Entwicklung · SKILL.md

production-validation

production-validation

Before declaring engineering work done, validate that what you built matches the production reality — not just the local or test environment — using the real signals (CI, observability, smoke tests).

Independent GitHub snapshot · Automated classification · Original documentation governs

Skill-Dokumentation

GitHub

name: production-validation description: "Before declaring engineering work done, validate that what you built matches the production reality — not just the local or test environment — using the real signals (CI, observability, smoke tests)."

Production validation

The biggest gap between agent work and human-quality work is that agents tend to call something done when the local checks pass. Production validation is the layer on top: confirm the change actually behaves correctly where it runs.

When to run

  • Before marking any code-writing planning task as done.
  • After deploying to staging or production.
  • After a rollback under rollback-runbook.
  • After completing an incident-postmortem-loop action item that promises a fix.

The 4-gate checklist

Treat this as a hard gate before closing the work.

Gate 1 — CI green

  • All required status checks on the PR are green via github_status_checks.
  • No skipped checks that should have run.
  • If you cannot fetch CI status, fail closed — do not declare done.

Gate 2 — Reproducible local checks

  • Tests run from a fresh clone (not an incremental cache).
  • Lint, typecheck, and unit tests all pass.
  • For UI work, the relevant Storybook or Cypress flow runs without manual fix-ups.

Gate 3 — Observability sanity

  • Logs at the relevant level show the expected entries for the new path.
  • Metrics (Datadog/Grafana) for error rate, latency, throughput show no regression in the last 15 minutes after deploy.
  • If a new metric or alert was added, confirm it is reporting.

Gate 4 — User-visible smoke

  • Trigger the user-visible flow at least once on the deployed environment.
  • For background jobs, verify one job completes successfully end-to-end.
  • For data writes, confirm the write reached the destination (DB row, file, event).

What to record

After all four gates pass, post a brief validation summary on the PR or task:

production-validation:
  ci: <PR url / commit>
  local_checks: <pass/fail>
  observability: <link to dashboard>
  smoke: <description of the flow run>

Anti-patterns

  • Closing the task as soon as the PR merges.
  • Skipping Gate 3 because the change "felt small".
  • Running the smoke check in local instead of production.
Gespeicherte Skills