Die Oberfläche ist lokalisiert; Skill-Beschreibungen und -Dokumente werden per KI automatisch in Ihre Sprache übersetzt. Code, Befehle, Pfade und Fachbegriffe bleiben im Original, maßgeblich ist das Dokument des Autors.
Skills entdecken
Entwicklung · SKILL.md

settlement-calculator

settlement-calculator

Foundation settlement calculation skill for immediate, consolidation, and secondary compression

Independent GitHub snapshot · Automated classification · Original documentation governs

Skill-Dokumentation

GitHub

name: settlement-calculator description: Foundation settlement calculation skill for immediate, consolidation, and secondary compression allowed-tools:

  • Read
  • Write
  • Glob
  • Grep
  • Edit
  • Bash metadata: specialization: civil-engineering domain: science category: Geotechnical Analysis skill-id: CIV-SK-010 graph: domains: [domain:civil-engineering] skillAreas: [skill-area:mathematical-reasoning, skill-area:computational-geometry, skill-area:data-analysis] roles: [role:systems-integration-engineer, role:research-engineer]

Settlement Calculator Skill

Purpose

The Settlement Calculator Skill calculates foundation settlements including immediate (elastic) settlement, primary consolidation, and secondary compression using established geotechnical methods.

Capabilities

  • Immediate (elastic) settlement
  • Consolidation settlement (1D theory)
  • Secondary compression
  • Time-rate of consolidation
  • Differential settlement analysis
  • Tolerable settlement checks
  • Settlement beneath rigid foundations
  • Stress distribution calculations

Usage Guidelines

When to Use

  • Estimating foundation settlement
  • Evaluating differential settlement
  • Time-rate predictions
  • Tolerable settlement verification

Prerequisites

  • Soil compressibility data available
  • Foundation loads defined
  • Groundwater conditions known
  • Soil stratigraphy established

Best Practices

  • Use appropriate stress distribution
  • Consider soil variability
  • Account for adjacent structures
  • Verify with field monitoring

Process Integration

This skill integrates with:

  • Foundation Design
  • Geotechnical Site Investigation

Configuration

settlement-calculator:
  settlement-types:
    - immediate
    - consolidation
    - secondary
  methods:
    - elastic
    - terzaghi-1d
    - stress-history
  output:
    - magnitude
    - time-rate
    - differential

Output Artifacts

  • Settlement calculations
  • Time-settlement curves
  • Differential settlement maps
  • Tolerable settlement checks
Gespeicherte Skills