executing-plans
executing-plans
Use when executing an implementation plan in the current session as the implementer yourself — your human partner chose inline execution, or no subagent tool is available
site-safety-briefingProduce a toolbox talk or pre-task safety briefing from the day's planned construction work. Use when asked to write a toolbox talk, prepare a pre-task plan or JHA/JSA briefing, brief a crew on today's hazards, or plan safety for a specific task like a crane pick, excavation, or hot work. Produces a crew-ready briefing with task-specific hazards, controls o…
Independent GitHub snapshot · Automated classification · Original documentation governs
A toolbox talk that could apply to any site on any day protects nobody. This skill builds the briefing from today's actual work: what tasks are running, what they conflict with, what the weather and site conditions add, and — critically — what conditions mean the crew stops and calls the supervisor. Controls are ordered by the hierarchy of controls, because "wear your PPE" is the last line of defence, not a plan.
Ask for what's missing; from a bare task name, build the briefing from typical hazards and label site-specific items [confirm on site]:
Identify hazards per task, not generically. Sweep these classes for each task: gravity (falls, dropped objects), mechanical/energy (struck-by, caught-between, stored energy, electrical), excavation/ground (collapse, utilities, water), atmosphere (confined space, dust, fumes, hot work), environment (heat/cold, wind — especially for crane picks and panel handling), and human factors (new crew members, fatigue, language barriers).
Order every control by the hierarchy — and say which level it is:
| Level | Control | Example |
|---|---|---|
| 1 | Eliminate | Prefabricate at ground level instead of working at height |
| 2 | Substitute | Mechanical lifting instead of manual handling; low-VOC product |
| 3 | Engineering | Guardrails, trench box, ventilation, physical barricades |
| 4 | Administrative | Permits, exclusion zones, spotters, rotation, signage |
| 5 | PPE | Harness, respirator, cut gloves — the last layer, never the plan |
If a briefing's controls are all level 4–5, flag it: the task plan itself may need rework.
Stop-work triggers must be observable. Not "if unsafe" — write conditions a crew member can see: wind above the crane chart limit; water entering the excavation; utility strike or unexpected line; barricade down in the exclusion zone; anyone in the fall zone during the pick. State plainly that anyone can stop work without repercussions.
1. Today's work — tasks, crews, locations, in one glance. 2. Task hazard & control table — | Task | Hazard | Control (hierarchy level) | Who verifies | 3. Permits & inspections required today — permit type, task, who holds it, valid when. 4. SIMOPS / crew interfaces — who's working near whom, and the separation rule. 5. Stop-work triggers — bulleted, observable, with "stop, make safe, call [supervisor]". 6. Emergency info — muster point, first aider, nearest hospital, who calls emergency services. 7. Sign-on sheet — name/signature lines; space for crew-raised concerns (record them — that's the point of the talk).
[confirm on site] for the supervisor to fill in