Use this skill when the user says 'cost-benefit analysis', 'ROI', 'TCO', 'cost estimation', 'benefit estimation', 'business case', 'investment analysis', 'build vs buy', 'net present value', 'payback period', 'sensitivity analysis'. This skill enforces: comprehensive cost estimation covering build vs buy, TCO components (labor, infrastructure, maintenance, …

Independent GitHub snapshot · Automated classification · Original documentation governs

Skill 문서

GitHub

name: planning-cost-benefit description: > Use this skill when the user says 'cost-benefit analysis', 'ROI', 'TCO', 'cost estimation', 'benefit estimation', 'business case', 'investment analysis', 'build vs buy', 'net present value', 'payback period', 'sensitivity analysis'. This skill enforces: comprehensive cost estimation covering build vs buy, TCO components (labor, infrastructure, maintenance, training, migration), benefit quantification across efficiency gains, revenue impact, and risk reduction, ROI and NPV calculation with discount rates, sensitivity analysis for key variables, and structured business case presentation. Do NOT use for: market analysis, pricing strategy, or financial accounting. version: "2.0.0" author: "j4flmao" license: "MIT" compatibility: claude-code: true cursor: true codex: true windsurf: true tags: [planning, analysis, phase-10]

Cost-Benefit Analysis

Purpose

Produce a defensible cost-benefit analysis quantifying investment costs, expected benefits, ROI, NPV, payback period, and sensitivity ranges to support data-driven business case decisions.

Agent Protocol

Trigger

"cost-benefit analysis", "ROI", "TCO", "cost estimation", "benefit estimation", "business case", "investment analysis", "build vs buy", "net present value", "NPV", "payback period", "sensitivity analysis", "cost breakdown", "ROI calculation", "investment decision".

Input Context

  • Project description and scope (what is being invested in)
  • Time horizon for analysis (1 year, 3 years, 5 years)
  • Build vs buy options being considered
  • Team composition and labor rates (internal vs contractor)
  • Infrastructure requirements (cloud, hardware, licenses)
  • Expected efficiency gains (hours saved, throughput increase)
  • Revenue projections if applicable
  • Discount rate (default 10% or company-specific)
  • Existing systems and migration considerations

Output Artifact

Cost-benefit analysis document with detailed cost breakdown, benefit quantification, ROI/NPV/payback period calculations, sensitivity analysis, and a recommendation.

Response Format

Cost-Benefit: {project-name}
Time Horizon: {years}
Option: {build/buy/hybrid}
Total Cost: ${amount} ({year-1}, {year-2}, ...)
Total Benefit: ${amount} ({year-1}, {year-2}, ...)
Net Benefit: ${amount}
ROI: {percentage}
NPV (@{discount}%): ${amount}
Payback Period: {years}
Sensitivity: ±{range}% ({variable})
Recommendation: {proceed/reject/conditional}

No preamble. No postamble. No explanations. No filler/hedging/transitions. Compress output — why use many token when few do trick.

Completion Criteria

  • Costs broken into categories (labor, infrastructure, licenses, training, migration, maintenance)
  • Benefits quantified in monetary terms (productivity, revenue, risk reduction, compliance)
  • ROI and NPV calculated over the specified time horizon
  • Payback period determined
  • Sensitivity analysis on 3+ key variables
  • Build vs buy comparison if applicable
  • Recommendation with rationale

Max Response Length

400 lines

Decision Trees

Build vs Buy Decision Tree

Does the core functionality differentiate your business?
  |-- YES --> Build (you need control and competitive advantage)
  |-- NO --> Is there a mature commercial or open-source option?
        |-- YES --> Buy (lower risk, faster time-to-market)
        |-- NO --> Does the functionality require deep integration?
              |-- YES --> Build with integration framework
              |-- NO --> Evaluate COTS/vendor options

Is the expected lifespan > 5 years?
  |-- YES --> Build (TCO of build amortizes better long-term)
  |-- NO --> Buy (shorter horizon favors subscription)

Analysis Depth Decision

What is the investment size?
  |-- < $50K --> Quick CBA (1-page, 3 key assumptions)
  |-- $50K-$500K --> Standard CBA (full categories, sensitivity)
  |-- > $500K --> Deep CBA (Monte Carlo simulation, multi-scenario)

Workflow

Step 1: Define Scope and Time Horizon

Set the analysis boundaries: what is included, what is excluded, and the time horizon (typically 3-5 years). Identify the decision options (build, buy, hybrid, do nothing).

Step 2: Estimate Costs

Build costs: labor (dev, QA, PM, DevOps), infrastructure (dev/staging/prod), tools and licenses, training, migration, ongoing maintenance (20% of build cost annually). Buy costs: subscription or license fees, implementation services, customization, integration, training, ongoing support fees.

Step 3: Quantify Benefits

Efficiency: hours saved × loaded labor rate. Revenue: new feature impact, conversion improvement, time-to-market reduction. Risk reduction: avoided incident costs, compliance penalty avoidance, SLA breach prevention. Intangible: team capability building, strategic positioning.

Step 4: Calculate ROI and NPV

ROI = (Total Benefits - Total Costs) / Total Costs × 100%. NPV = Σ(Benefit_t - Cost_t) / (1 + r)^t over time horizon. Payback period = time to cumulative net benefit > 0. Use discount rate r (default 10%, adjust for risk).

Step 5: Sensitivity Analysis

Identify 3-5 key variables with highest uncertainty (adoption rate, labor cost, timeline). Vary each ±20% and recalculate NPV. Present as a table or spider chart. Flag scenarios where NPV turns negative.

Step 6: Make Recommendation

Proceed: positive NPV, strong ROI, acceptable payback period. Reject: negative NPV in all scenarios. Conditional: proceed if certain conditions met (e.g., adoption rate > X%).

Cost Categories

Build Option

CategoryComponentsAnnual Cost (Y1)Annual Cost (Y2+)
LaborDev, QA, PM, DevOps, DesignHeadcount × loaded rate+X% escalation
InfrastructureCloud (dev/staging/prod), CI/CDMonthly × 12Scales with usage
ToolsIDE licenses, project mgmt, monitoringPer-seat × teamPer-seat × team
TrainingOnboarding, certificationsOne-timeReduced yearly
MigrationData migration, integrationOne-time—
MaintenanceBug fixes, updates, support—20% of build cost

Buy Option

CategoryComponentsAnnual Cost
SubscriptionPer-user or per-entity pricingMonthly/Annual fee
ImplementationVendor consulting, configurationOne-time
CustomizationCustom features, integrationsOne-time + annual maint
TrainingVendor training, certificationOne-time + refresh
SupportVendor support tierIncluded or add-on
ExitData export, migration awayIf applicable

Benefit Quantification Methods

Efficiency Gains

Current time per task: 2 hours
Tasks per week: 50
New time per task: 0.5 hours (75% reduction)
Weekly savings: 50 × 1.5 = 75 hours
Annual savings: 75 × 52 = 3,900 hours
Monetary value: 3,900 × $75/hr (loaded rate) = $292,500/year

Revenue Impact

Current conversion rate: 2.5%
Expected conversion rate: 3.5% (1% improvement)
Monthly visitors: 100,000
Current monthly conversions: 2,500
Expected monthly conversions: 3,500
Additional monthly revenue: 1,000 × $50 AOV = $50,000
Annual revenue impact: $600,000

Risk Reduction

Current incident frequency: 12/year
Average incident cost: $25,000 (downtime + recovery)
Expected reduction: 75%
Annual savings: 12 × $25,000 × 75% = $225,000
Compliance penalty avoidance: $100,000/year
Total risk reduction: $325,000/year

Financial Models

Monte Carlo Simulation

Replace single-point estimates with probability distributions for each variable. Simulate 10,000+ scenarios to understand the range of possible outcomes.

Variable               | Distribution  | P10  | P50  | P90
Adoption rate          | Triangular    | 30%  | 50%  | 70%
Development cost       | Triangular    | $400K| $500K| $700K
Time to market (months)| Triangular    | 6    | 9    | 14
Annual maintenance     | Triangular    | $80K | $100K| $150K
Revenue per user/month | Uniform       | $15  | $20  | $30

Run 10,000 simulations:
  NPV > $0: 72% probability
  NPV > $500K: 45% probability
  NPV < $0: 28% probability (downside risk)
  P50 NPV: $380K
  P10 NPV: -$120K
  P90 NPV: $890K

Decision: Proceed if risk tolerance accepts 28% chance of negative NPV.

Real Options Analysis

Treat investment as a series of options, not a single go/no-go decision. Stage investments to limit downside while preserving upside.

OptionDescriptionValueCost
DeferWait for more information before committingReduces uncertaintyMay miss first-mover advantage
StageInvest incrementally with go/no-go at each stageLimits downside, preserves upsideLonger total timeline
AbandonOption to exit investmentSaves remaining costsLost sunk investment
ScaleOption to increase investment if successfulCaptures upsideAdditional capital commitment
SwitchOption to pivot to alternative usePreserves value of partial investmentMay not fully capture original opportunity

Break-Even Analysis

Calculate how long until the investment pays for itself. Break-even point = fixed costs / (revenue per unit - variable cost per unit). For internal projects: break-even point = total investment / annual net benefit.

MetricYear 0Year 1Year 2Year 3
Investment-$500K-$100K-$100K-$100K
Net benefits$0$250K$400K$600K
Cumulative-$500K-$350K-$50K$450K
Break-even: 2.1 years

For subscription products: break-even months = initial CAC / monthly gross margin per customer. If CAC = $500 and monthly margin = $50, break-even = 10 months. Target break-even <12 months for healthy unit economics.

Staged investment example:

Phase 1: MVP build ($150K, 3 months)
  → If adoption >30%, proceed to Phase 2
Phase 2: Core platform ($250K, 4 months)
  → If retention >60%, proceed to Phase 3
Phase 3: Scale ($400K, 6 months)
  → Full rollout with marketing investment

Total at risk per phase is limited:
  Max loss: Phase 1 = $150K (not $800K)
  Expected value with options: higher than single-stage commitment

Risk-Adjusted Return

Adjust return projections for key risks using probability-weighted scenarios:

Scenario      | Probability | NPV          | Weighted
Base case     | 50%         | $500K        | $250K
Optimistic    | 20%         | $1.2M        | $240K
Pessimistic   | 20%         | -$200K       | -$40K
Failure       | 10%         | -$500K       | -$50K

Expected NPV: $400K
NPV at risk (5th percentile): -$350K
NPV at upside (95th percentile): $1.1M
Return risk ratio: Expected NPV / |NPV at risk| = 1.14

NPV Calculation

NPV = Σ (Bt - Ct) / (1 + r)^t

Where:
  Bt = Benefits in year t
  Ct = Costs in year t
  r = Discount rate
  t = Year (1 to n)

Example:
  Year 0: -$500,000 (initial investment)
  Year 1: $200,000 / (1.10)^1 = $181,818
  Year 2: $350,000 / (1.10)^2 = $289,256
  Year 3: $500,000 / (1.10)^3 = $375,657
  NPV = -$500,000 + $181,818 + $289,256 + $375,657 = $346,731

Payback Period

Cumulative Year 0: -$500,000
Cumulative Year 1: -$500,000 + $200,000 = -$300,000
Cumulative Year 2: -$300,000 + $350,000 = -$50,000
Cumulative Year 3: -$50,000 + $500,000 = $450,000
Payback: 2 years + ($50,000 / $500,000) = 2.1 years

Sensitivity Analysis Template

VariableBase Case-20%-10%+10%+20%
Adoption rate$346K NPV$180K$263K$430K$514K
Labor cost$346K NPV$420K$383K$309K$272K
Timeline (delay)$346K NPV$310K$328K$364K$382K

Common Anti-Patterns

1. Optimism Bias

Underestimating costs and overestimating benefits systematically. Mitigation: use reference class forecasting. Compare with similar projects in your organization. Apply a 20-30% contingency factor.

2. Hidden Costs

Ignoring ongoing costs: training new hires, vendor lock-in exit costs, compliance audits, opportunity cost of team allocation. Mitigation: use a comprehensive cost checklist.

3. Double Counting

Counting the same benefit in multiple categories. Example: counting "increased productivity" and "headcount reduction" separately when they represent the same outcome. Mitigation: ensure benefit categories are mutually exclusive.

4. Single-Point Estimates

Using one number for each variable without ranges. Creates false precision. Mitigation: use three-point estimates (optimistic, most likely, pessimistic) for every variable.

5. Ignoring Do-Nothing Baseline

Not documenting what happens if the investment is not made. Existing costs continue, competitors may gain advantage, compliance risks persist. Mitigation: always include a do-nothing scenario.

6. Wrong Time Horizon

Using too short a horizon (missing long-term benefits) or too long (speculative). Mitigation: match horizon to project lifecycle. 3-5 years for most IT projects. 5-10 years for infrastructure.

7. Vanity ROI

Inflating ROI by using unrealistic discount rates or excluding certain costs. Mitigation: document all assumptions. Use standard discount rate. External review of the analysis.

Success Metrics

MetricTarget
NPV> $0 (positive)
ROI> 100% (double the investment)
Payback period< 3 years
Sensitivity rangeNPV positive across ±20% of key variables
Build vs buy deltaClear cost or benefit advantage >20%

Rules

  • All costs and benefits must be in monetary terms — use loaded labor rates (salary × 1.3-1.5)
  • Discount rate must be documented and justified — never omit it
  • Sensitivity analysis must test at least 3 variables — single-point estimates are insufficient
  • Build vs buy comparison must include ongoing maintenance for build option
  • Benefits without a clear quantification methodology are assumptions, not estimates
  • Intangible benefits must be noted separately, not folded into numeric estimates
  • Do-nothing baseline must be documented — "no investment" is a valid scenario

Expanded Decision Trees

Sensitivity Analysis Method Decision Tree

How many uncertain variables do you have?
  |-- 1-3 variables --> One-at-a-time sensitivity (tornado chart)
  |-- 4-10 variables --> Scenario analysis (optimistic/base/pessimistic)
  |-- >10 variables --> Monte Carlo simulation with probability distributions

What is the investment size?
  |-- <$50K --> Simple what-if on 3 key variables
  |-- $50K-$500K --> Tornado chart + scenario analysis
  |-- >$500K --> Full Monte Carlo with probability distributions

What is stakeholder risk tolerance?
  |-- Risk-averse --> Include worst-case scenario + probability of negative NPV
  |-- Risk-neutral --> Base case + sensitivity range
  |-- Risk-seeking --> Focus on upside scenarios

Cost Allocation Decision Tree

Can costs be directly attributed to this project?
  |-- YES --> Direct cost (labor, licenses, infrastructure)
  |-- NO --> Is the cost shared across multiple projects?
        |-- YES --> Allocate proportionally (by usage, headcount, or revenue)
        |-- NO --> Is this an overhead cost?
              |-- YES --> Exclude from project CBA or note separately
              |-- NO --> Include as indirect cost with allocation basis

Is this a sunk cost?
  |-- YES --> Exclude from forward-looking CBA decision
  |-- NO --> Include in cost estimate

Investment Appraisal Method Decision Tree

What is the primary decision criterion?
  |-- Profitability --> Use ROI (simple) or IRR (time-adjusted)
  |-- Value creation --> Use NPV
  |-- Payback speed --> Use Payback Period or Discounted Payback
  |-- Risk-adjusted return --> Use Risk-Adjusted NPV or Monte Carlo

Does the investment have uncertain timing of returns?
  |-- YES --> Use NPV with sensitivity analysis
  |-- NO --> Simple ROI may suffice

Are there multiple investment options competing?
  |-- YES --> Use NPV ranking + Payback Period for tie-breaker
  |-- NO --> Use ROI with payback threshold

Templates

Business Case Executive Summary Template

# Business Case: {Project Name}

## Recommendation
{Proceed / Reject / Conditional on {condition}}

## Investment Summary
| Item | Value |
|------|-------|
| Total Investment | ${amount} |
| Time Horizon | {years} |
| Net Benefit (5yr) | ${amount} |
| ROI | {percentage} |
| NPV (@ {discount}%) | ${amount} |
| Payback Period | {years} |
| Risk-Adjusted NPV | ${amount} |

## Key Assumptions
1. {assumption} — {sensitivity impact if wrong}
2. {assumption} — {sensitivity impact if wrong}
3. {assumption} — {sensitivity impact if wrong}

## Risk Assessment
| Risk | Probability | Impact | Mitigation |
|------|-------------|--------|------------|
| {risk} | {H/M/L} | {H/M/L} | {mitigation} |

## Decision Required By
{date} — {consequence of delay}

Stakeholder Communication Template

# CBA Review: {Project Name}

## Audience
{executive / investment committee / team}

## Key Message
{the one thing they need to know}

## What We're Asking
{approval / feedback / decision}

## Supporting Data (1 page)
- Cost breakdown summary
- Benefit quantification highlights
- Sensitivity ranges
- Risk assessment
- Recommendation

## Appendix
- Full cost breakdown
- Full benefit analysis
- Sensitivity analysis details
- References and methodology

CBA Presentation Structure (5 slides)

Slide 1: Title + Recommendation (30 seconds)
Slide 2: The Problem & Solution (60 seconds)
  - What we're investing in and why
  - Baseline (do nothing) scenario
Slide 3: The Numbers (90 seconds)
  - Cost breakdown (build vs buy if applicable)
  - Benefit quantification
  - ROI, NPV, Payback
Slide 4: Risk & Sensitivity (60 seconds)
  - Key risk factors
  - Sensitivity range (tornado chart)
  - Worst/base/optimistic scenarios
Slide 5: Decision & Next Steps (30 seconds)
  - Clear recommendation
  - Conditions/triggers
  - Timeline for decision

Expanded Financial Models

Discounted Payback Period

Unlike simple payback, discounted payback accounts for the time value of money. Calculate the cumulative discounted cash flow and find when it turns positive.

Year 0: -$500,000 (discounted: -$500,000)
Year 1: $200,000 / 1.10 = $181,818 (cumulative: -$318,182)
Year 2: $350,000 / 1.10^2 = $289,256 (cumulative: -$28,926)
Year 3: $500,000 / 1.10^3 = $375,657 (cumulative: $346,731)

Discounted payback: 2 + ($28,926 / $375,657) = 2.08 years

Internal Rate of Return (IRR)

IRR is the discount rate that makes NPV = 0. It represents the effective return rate of the investment. Compare IRR against the company's cost of capital (WACC) or hurdle rate.

Investment: -$500,000
Cash flows: $200K (Y1), $350K (Y2), $500K (Y3)
IRR: Find r where NPV = 0
  0 = -500K + 200K/(1+r) + 350K/(1+r)^2 + 500K/(1+r)^3
  IRR ≈ 38%

Decision rule: IRR > WACC → Proceed (38% > 10% → Proceed)

Profitability Index (PI)

PI = NPV / Initial Investment. Measures value created per dollar invested. Useful for comparing projects of different sizes.

Project A: NPV = $346K, Investment = $500K, PI = 0.69
Project B: NPV = $200K, Investment = $200K, PI = 1.00
Project B creates more value per dollar invested despite lower absolute NPV.
Capital-constrained: rank by PI, select highest first.

Tornado Chart Construction

Rank variables by impact on NPV. The variable with the widest range is the most sensitive.

Variable            -20%    Base    +20%    Range
Adoption rate       $180K   $346K   $514K   $334K ← Most sensitive
Labor cost          $420K   $346K   $272K   $148K
Timeline            $310K   $346K   $382K   $72K
Discount rate       $389K   $346K   $305K   $84K

Priority: Adoption rate needs the most accurate estimate.

Expanded Anti-Patterns

8. Sunk Cost Fallacy

Including past spending in the forward-looking investment decision. "We've already spent $200K on this project, so we have to continue." The $200K is gone and irrelevant to the decision. Only future costs and benefits matter. Mitigation: clearly separate sunk costs from forward costs in the analysis. Make the decision based on incremental ROI.

9. Ignoring Opportunity Cost

Not accounting for what the team could be doing instead of this project. The opportunity cost of allocating 5 engineers to Project A is the value they would create on Project B. Mitigation: include team allocation as an explicit cost. Run a quick CBA on the next-best alternative use of resources.

10. Confirmation Bias in Assumptions

Selecting assumptions that support the desired outcome. "We assume 50% market adoption because we need it for a positive NPV." No basis in data. Mitigation: use reference class forecasting. Find analogous projects and their actual outcomes. Base assumptions on data, not targets.

11. Scope Creep in CBA

The CBA evaluates Option A (Minimal Viable) but the team builds Option B (Full Feature). Costs overrun and benefits don't match the analysis. Mitigation: clearly define scope boundaries in the CBA. If scope changes, re-run the analysis. Every scope assumption is a sensitivity variable.

12. Ignoring Implementation Risk

Assuming the project will be delivered on time and on budget. No contingency. No risk adjustment. Most large IT projects overrun by 20-50%. Mitigation: apply a contingency factor based on project complexity and team track record. Use three-point estimates (optimistic/most likely/pessimistic).

13. False Precision in Long-Term Projections

Showing 5-year projections with dollar precision when year 5 estimates are essentially guesses. Presents a false sense of accuracy. Mitigation: use ranges instead of single numbers. Show declining confidence bands over time. Year 1 should be precise, year 5 should show ±50% range.

Expanded Success Metrics

MetricTargetMeasurementRemediation
NPV > $0Positive at target discountCalculation verificationReduce costs or increase scope
ROI> 100%Net benefit / total costRe-evaluate build vs buy
Payback period< 3 yearsCumulative cash flowFocus on quicker wins
Sensitivity passNPV positive at ±20%Sensitivity tableStrengthen business case
Build vs buy delta> 20% advantageCompare TCO optionsRe-evaluate both options
Assumption accuracyWithin 20% of actual 1yrPost-implementation auditImprove estimation process
Stakeholder confidence> 80% agree with recommendationSurvey reviewersAddress concerns in analysis

CBA Quality Checklist

  • All costs are in monetary terms with loaded labor rates
  • Benefits are quantified with methodology stated
  • Discount rate is documented with justification
  • Sensitivity analysis covers 3+ key variables
  • Build vs buy comparison included (if applicable)
  • Do-nothing baseline documented
  • Sunk costs excluded from forward-looking analysis
  • Opportunity cost considered
  • Intangible benefits noted separately
  • Assumptions have data sources
  • Three-point estimates used (not single points)
  • Scope boundaries clearly defined
  • Post-implementation review plan documented

Business Case Quality Scoring

CriterionWeightScore (1-5)Weighted
Problem clarity15%
Data quality20%
Options analyzed15%
Quantification rigor20%
Risk assessment15%
Recommendation logic15%

Threshold: > 4.0 — Proceed. 3.0-4.0 — Revise. < 3.0 — Reject.

References

  • references/benefit-analysis.md — Benefit Analysis
  • references/cba-templates.md — CBA Templates
  • references/cost-estimation.md — Cost Estimation
  • references/portfolio-prioritization.md — Portfolio Prioritization
  • references/project-valuation.md — Project Valuation
  • references/cost-benefit-advanced.md — Cost Benefit Advanced Topics
  • references/cost-benefit-fundamentals.md — Cost Benefit Fundamentals
  • references/sensitivity-analysis.md — Sensitivity Analysis Guide

Handoff

planning/create-pitch-deck for business case presentation with ROI and NPV highlights planning/create-adr for recording the investment decision with rationale