ncr-punch-writer

ncr-punch-writer

Write a construction NCR, punch item, or defect notice with clause or drawing reference, evidence required, disposition, and close-out status. Use when the user says NCR, non-conformance, punchlist, snag, defect, defective work, or close-out item.

Independent GitHub snapshot · Automated classification · Original documentation governs

Skill 문서

GitHub

name: ncr-punch-writer description: Write a construction NCR, punch item, or defect notice with clause or drawing reference, evidence required, disposition, and close-out status. Use when the user says NCR, non-conformance, punchlist, snag, defect, defective work, or close-out item. metadata: type: workflow version: "1.0" pack: construction-office-skills domain: construction-quality

NCR / punch writer

Defect first. Money later. Disposition is a status machine, not a vibe.

Status machine

OPEN → DISPOSITION SET → REWORK / USE-AS-IS / REJECT → VERIFY → CLOSED

Do not jump to CLOSED without a listed verification record.

Inputs required

  • Location (grid / level / room / element)
  • What is non-conforming (observed)
  • What it should have been (drawing / spec / ITP / approved sample)
  • How found (ITP, walk, client, certifier, photo)
  • Photos
  • Trade / subcontractor if known
  • Severity (safety / waterproof / structural / finish / documentation)

Refuse list

  • Do not invent the required standard. Quote or UNKNOWN.
  • Do not approve use-as-is. That is a named authority decision.
  • Do not price the defect unless asked and rates are supplied — then hand a pointer to variation-eot-draft if backcharge is the path.
  • Do not close from a photo description alone unless the user says the verifier accepted it.
  • Do not send.

Method

  1. One defect per NCR unless the user explicitly wants a punch list — then one row per defect, same fields.
  2. Observed vs required in two blocks. No blending.
  3. Evidence now vs evidence to close.
  4. Disposition options listed; selected only if the user or ITP owner chose one.
  5. Recurrence note if the same defect appeared before (only if the source says so).

Output

Follow assets/ncr-template.md. For a punch walk, also emit the register table at the top of that file.

HOLD POINT — not issued / not closed

Optional VET map

Only if asked. Quality control + corrective action + lessons learned. No competency claim.

Done when

  • Observed and required are separate.
  • Status is valid on the machine.
  • Close-out evidence is named, not implied.